Loading...
HomeMy WebLinkAboutSW6130203_Plansheet - SCM Detail_20240423 3.16 ACRES Table 2:Sample Operation and Maintenance Provisions for Infiltration Basins CAR ZONING: RA-20 R ;'37" W �— .•FE•..D.••••� SCM element: Potential problem: How to remediate the problem: 5 6 \\�0•��� s'i'�ned The entire SCM Trash/debris is present. Remove the trash/debris. USE: VACANT J r $d E. by JafrS,d E. The grass filter strip or ' \ 'I SF,�HIIIIdrd,h, other pretreatment area Areas of bare soil and/or erosive gullies Regrade the soil if necessary to H I I.7 I ar - remove the gully,then plant ground Date: -' cover and water until established. 0 23\ �i "I' Provide lime and a one-time fertilizer `.•:�1 N ; application (5`04'00' Sediment has accumulated to a depth — ��,,, E[ greater than six inches. Search for the source of the sediment and remedy the problem if possible. Sample Operation and Maintenance Provisions for Infiltration Basins I ip Remove the sediment and dispose of 'O en Q) Important maintenance procedures: �r it in a location where it will not cause 1.The drainage area will be carefully managed to reduce the sediment load to / co \ M impacts to streams or the SCM. S� co the infiltration basin. �� � � The flow diversion 2. No portion of the infiltration basin will be fertilized after the initial fertilization l � Q)structure(if applicable) The structure is clogged. Unclog the conveyance and dispose N N � of any sediment off-site. that is required to establish the vegetation. Lime may be allowed if vegetation SCM DRAINAGE AREA: co6) \ is planted on the surface of the infiltration system and a soil test shows that it is needed. � 374,616 SF � UIZ The structure is damaged. Make any necessary repairs or replace ' co3.The vegetation in and around the basin will be maintained at a height of four to six inches. if damage is too much for repair. 8.60 AC L The basin More than four inches of — _ \ BASIN BOTTOM: 'DESIGN VOLUME':25,444 CIF d' Q) After the infiltration basin is established, it will be inspected once a quarter and �26— _ — � N tr) Q.� � sediment has accumulated. Search for the source of the sediment �� 420.00' (FROM OUTLET ELEVATION \ U M Q M within 24 hours after every storm event greater than 1.0 inches(or 1.5 inches 7 and remedy the problem if possible. if in a Coastal County). Records of operation and maintenance will be kept in a 422.00 TO O L N Remove the sediment and dispose known set location and will be available upon request. \ � N `� of it in a location where it will not cause Inspection activities shall be performed as follows.Any problems that are found BOTTOM O F BASIN s Lo Q) CL impacts to streams or the SCM. / \ — ELEVATION 420.00) oo� Ilk / o `� shall be repaired immediately. / 'L Erosion of the basin surface � has occurred or riprap is displaced. Provide additional erosion protection _ MIN.SURFACE AREA FOR'DESIGN VOLUME': �'( �`). / Q) Z Q) such as reinforced turf matting or riprap � SA=FSx[(DVx12)/(KxT)] if needed to prevent future erosion problems. SA=2X[(25,444x12)/(0.9102)] / Water is standing more than / S MIN.SURFACE AREA REQUIRED:9,320 SF U three days after a storm event. Replace the top few inches of soil to see � SURFACE AREA PROVIDED: 11,373 SF Q� •V if this corrects the standing water problem. L J f not,consult and approve repair. professional STO R M WATE R for a more extensive re air. � L DRAINAGE N � -� The embankment Shrubs or trees are growing on Cal •..... STORM WATER MANAGEMENT NOTES: � E SEMENT the embankment. Remove trees and shrubs immediately. 1. THE DEVELOPER OR HIS AGENT SHALL CONTACTTHE DESIGN ENGINEER WHEN THE BEST r .Z1 M An annual inspection by an MANAGEMENT PRACTICES ARE CONSTRUCTED AND ABOUT TO BECOME OPERATIONAL SO THAT A �1 , appropriate professional shows FINAL INSPECTION CAN BE PERFORMED TO DETERMINE COMPLIANCE WITH THE APPROVED PLAN. •y'� �10 that the embankment needs repair. Make needed repairs immediately. 2. ANNUAL MAINTENANCE INSPECTION AND REPORT REQUIRED. THE OWNER OF A PERMITTED Dc TOP OF BANK I Q.) STRUCTURAL STORM WATER BMP SHALL ANNUALLY SUBMIT MAINTENANCE AND INSPECTION 422 423.55' M 1 The outlet device Clogging has occurred. Clean out the outlet device and dispose REPORT FOR EACH BMP TO THE STORM WATER ADMINISTRATOR. ANNUAL INSPECTIONS SHALL BEGIN �I of sediment off-site. WITHIN ONE YEAR OF THE RECORDATION OF ANY DEED(S)SHOWING STORM WATER BMPS. — \ 3. UPON COMPLETION OF THE PROJECT,THE ENGINEER OF RECORD SHALL CERTIFY THAT THE i \ The outlet device is damaged. Repair or replace the outlet device. COMPLETED PROJECT IS IN ACCORDANCE WITH THE APPROVED STORM WATER MANAGEMENT PLANS \ ' AND DESIGNS. � 4. A FINAL INSPECTION OF THE SITE AND STORM WATER BMP SHALL BE SCHEDULED WITH AND COMPLETED BY THE PROJECT ENGINEER. �Z 5. NCDEQ AND THEIR ASSIGNS HAVE RIGHT TO ACCESS THE STORM WATER CONTROLS FOR INSPECTIONS / k CHI NCE K OR MAINTENANCE AS NECESSARY. 6. THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING THE STORM WATER CONTROLS 18' WIDE EMERGENCY / ACCORDING TO THE APPROVED MAINTENANCE PLAN AND DIRECTION OF NCDEQ. \ EX UMP OVERFLOW WEIR: �� a T11r�ON 423.25' WITH SODDING 8 .y�, d, RIP RAP OUTLET�APRON A 174.7598' — 4�s.>o X 2' WIDE AT OUTLET �?1089.5581'� 3 � LQ D9'1124 12' LONGf " � � 4�002• _ 13' WlbE AT TERMINUS 1 >8 RcfsgBo[9 _ SE 18" THICK CLASS B RIP RAP O MIRIFI FILTER FABRIC %-4 NOTE: GRADE GRADE APRON TO 421.75 FROM \ PIPE OUTLET TO THE CENTER J ROAD STORMWATER BASIN MAY BE CONSTRUCTED FOR USE d \ AS A TEMPORARY SEDIMENT BASIN DURING CONSTRUCTION. / OF TH E APRON 1115 ONCE CONSTRUCTION IS COMPLETED,THE TEMPORARY / NINON SEDIMENT BASIN IS TO BE CLEANED UP AND SHAPED PRIOR TO USE AS AN INFILTRATION BASIN. INFILTRATION BASIN PLAN VIEW SCALE:1"=30' 0 30 60 HORZ. SCALE FEET 2'X 2' CONC. 8"PVC PLUG ANTI-SEEPAGE 8" PVC PIPE FOR DRAW SCREW TYPE COLLAR DOWN ORIFICE SEE DETAIL INV=422.00',SEE DRAW DOWN ORIFICE DETAIL 8"PVC TEE 8" PVC INV OUT=421.75' 3'MIN. 1 8"PVC PIPE N STUBBEDINTO Z OUTLET RISER 1 4'MIN 0_ CUTOFF TRENCH I KEY �1 �8"0 DRAW DOWN a APPROXIMATE SIZE ORIFICE M EXCAVATE AND BACKFILL WITH LJJ COMPACTED FILL AS DIRECTED BY GEOTECHNICAL ENGINEER Z O DRAW DOWN ORIFICE DETAIL SCALE: N.T.S. CUTOFF TRENCH - OUTFALL DETAIL SCALE: N.T.S. J_ L.L Z 2' J — 12" 1' Q W #4 REBAR IN FRONT &REAR FACE FLOW PUMP Q a OF COLLAR.REBAR TO HAVE 3" MIN.CONC.COVER a a FROM EDGE OF FACE OF COLLAR \ 0 O VJ a ° ° ° ° a .0Gli a Z < ,� a a \ WATER LEVEL v , U a a a ^ ° a NOTES: 1) ALL CONCRETE TO BE 3000 PSI NOTES: �� r••� 2' a a NON-FLY ASH 1) PRIOR TO INSTALLATION, MANUFACTURER SPECIFICATIONS / O z a 2) APPLY 1/2"THICK WRAP OF OF FILTER MEDIA SHALL BE REVIEWED TO ENSURE THAT ASPHALTIC CEMENT AROUND DISCHARGE FROM FILTER MEDIA SHALL MEET OR EXCEED a DISCHARGE PIPE 6"BEYOND PLANNED THE PROVISIONS OF THE CLEAN WATER ACT. a SEEPAGE COLLAR ON BOTH SIDES 2) ENSURE THAT PUMP PRESSURE DOES NOT EXCEED FILTER _ z a ° a a 3) APPLY ADDITIONAL ASPHALTIC MEDIA PRESSURE RATING. — / ` a -:) 1' a a a a CEMENT AT PIPE/SEEPAGE COLLAR 3) FILTER MEDIA MAY BE, BUT NOT LIMITED TO,SAND MEDIA �����j ������� 1 a INTERFACE ON UPSTREAM FACES FILTRATION PRACTICES. Q O 4) TO BE FIELD INSPECTED BY 4) PUMP STRAINER SHALL NOT BE IN CONTACT WITH BOTTOM J U 17 GEOTECHNICAL ENGINEER. ASPHALTIC OF POND. Z] a ° a a CEMENT TO MEET OR EXCEED LOW POINT J ° A FEDERAL SPECIFICATION SS-153 TYP1: J W w ASTM-D-2822-75 TYPE 1. z U_ r••� OE CONCRETE ANTI- SEEPAGE COLLAR INFILTRATION BASIN DEWATERING z O = SCALE: N.T.S. SCALE: N.T.S. DESIGNED BY.- JEH DRAWN BY.- JLF APPROVED BY.- JEH SHEET SM.: REVISION DESCRIPTION: DATE: C3 . 0 1 REDUCED BASIN SIZE PER NCDEQ4/10/24 COMMENTS 4/22/24 CIVIL