Loading...
HomeMy WebLinkAboutSW6130203_Supplement-EZ Form_20240423 SUPPLEMENT-EZ COVER PAGE PROJECT INFORMATION 1 Pro'ect Name O'Reilly Auto Parts Area Infiltration Basin 2 Pro'ect Area(ac) 8.977548 3 Coastal Wetland Area(ac) 4 Surface Water Area(ac) 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) _ _ 30 8 Will the vegetated setback remain vegetated? Yes j 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A r 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: I 11 Infiltration System 1 _ 12 -Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof — -- --_19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter _ 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Jarrod E.Hilliard,PE,CFM 28 Or!anization: Hilliard Engineering, PLLC •Street address: 3417 Winterwind Circle 30 Cit ,State,Zip: Sanford, NC 27330 31 Phone number(s): 919-352-2834 32 Email: jhilliard@hilliardengineering.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer ,,`I11111t1P5t. ,,,, 110, • •� ,SSO•• 2 �i !Q- 1,1% S • Si ature of Designer 99"" // i e Q SEAL ��: — �/d�C l alrt�, (2/Z6 035670 7 r� / P" A11111/ 4-j 3/ Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 [versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 ,. 1 4 Type of SCM Infiltration Basin Infiltration Basin 4F 5 Total drainage area(sq ft) 391,062 374616 6 Onsite drainage area(sq ft) 391,062 374616 7 Offsite drainage area(sq ft) 8 Total BUA in project(sq ft) 318424 sf 318424 sf New BUA on subdivided lots(subject to permitting) 9 , s' ft) 297634 sf 297634 sf New BUA not on subdivided lots(subject to 10 permittn.)(sf) 20800 sf 20800 sf _ En Offsite BUA(sq ft) lal Breakdown of new BUA not on subdivided lots: _ -Parking(sq ft) agi -Sidewalk(sq ft) 1111111 -Roof(sq ft) _ -Roadway(sq ft) 20800 sf 20800 sf _ -Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 1 15 `permitting)(sq ft) 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 81% 85% 19 Design storm(inches) 1.0 in 20 Design volume of SCM(cu ft) 25444 cf 21 Calculation method for design volume simple ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 ;drainage area(s): INFILTRATION SYSTEM Drainage area number 1 2 1 Minimum reauired treatment volume (cu ft) 2b444 c 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the desi n volume? Yes 9 lWhat is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC 9 ? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 1 Does the SCM follow the device specific MDC? Yes 17 lWasthe SCM designed b an NC licensedprofessional? Yes INFILTRATION SYSTEM MDC FROM 02H .10S1 18 Proposed slope of the subgrade surface (%) 000 19 jAre terraces or baffles provided? No 20 IType of pretreatment: Forebay I Soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes 22 SHWT elevation fmsl < 414 23 Depth to SHWT per soils report (in) > 124 24 Ground elevation at boring in soils report fmsl 424.30 25 1 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A 26 ISoil infiltration rate (in/hr) 0.91 27 1 Factor of safety (IFS) 2 is recommended): 2.00 (Elevations evation fmsl 420.00 levation (fmsl) =IBypass 422. ft levation fmsl 422 ft For Basins Only 32 Bottom surface area(ft) 11373 ft 33 Storage elevation surface area(ft) 14102. ft Fnr Tranchac I1niv 34 Length (ft) 35 Width ft 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if applicable 40 Stone porosity (%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? Volumes/Drawdown 44 IDesign volume of SCM cu ft25444 cf 45 ITime to draw down (hours) 59 hrs I 46 Please use this space to provide any additional information about the infiltration system(s): Infiltration 1 9:23 AM 7/26/2024