Loading...
HomeMy WebLinkAboutSW5240102_Response To Comments_20240423 Gettle Engineering and Design, PLLC 3616 Waxwing Ct. Wake Forest, NC 27587 NC License P-2538 919.210.3934 April 17, 2024 Brianna Holland Environmental Engineer North Carolina Department of Environmental Quality 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 Subject: Project Name: Jeffery Way Commercial Stormwater Permit No. SW5240102 County: Franklin City: Youngsville As noted in the attached Request for Additional Information Letter, dated April 11, 2024, the following responses to comments are noted below. Application a. Section III, 2-Since the property owner is also the applicant, this should not be filled out. With your permission, I can cross out the original signature on the provided hard copy, however, you should revise the electronic copy of the form. Response: You have our permission to cross out the original signature as requested. Confirm the address of the property owner, as 9000 Creedmoor Rd and 900 Creedmore Road were listed as the address in Section III 1 and III 2. Response: 9000 Creedmoor is correct and revised on the PDF copy. b. Section IX- Since the property owner is also the applicant, Section IX should not be filled out. With your permission, I can cross out the original signature on the provided hard copy, however, you should revise the electronic copy of the form. Response: You have our permission to cross out the original signature as requested. c. Section III, 4 - Provide the point of contact and phone number for the local jurisdiction as requested. Response: The Franklin County point of contact is listed with phone number on the application. Plans a. There appears to be an error on the provided vicinity map and plan sheets. Per Franklin County GIS maps, the road appears to be"Jeffery Way" instead of"Jeffrey Drive". Per 15A NCAC 02H .1042(2) (e), a location map with street names and SR numbers to the nearest intersection, with 1, 2, or 3 digit road numbers, legend, and north arrow is required. Response: The name has been modified, and NCDOT SR numbers are listed. However,the roadway along the front of the project is considered private, and is not in the NCDOT Gettle Engineering and Design.PLLC. 3616 Waxwing Ct.,Wake Forest. NC 27587. (919)210-3934. NC License P-2538 Page 1 of 3 system. b. Per Section VI, 8n,o of the Application, delineated drainage areas on the main set of plans are required. It is noted that erosion control drainage areas have been provided, but the existing drainage and post construction drainage areas need to be delineated so that off-site drainage area may be verified, and the total drainage area directed to the SCM may be confirmed. Response: The pre-development and post development maps (EX1 and EX2) have been included in the plan set. c. The information shown in the Application, Supplement-EZ Form, and calculations should be verifiable on the plans in the field without the use of a computer. You may wish to add a BUA table to the plans or provide additional dimensions for easier verification of BUA. Notably, it is currently unclear if the gravel area shown on the plans is being accounted for as BUA. 15A NCAC 02H .1042(2) (g) (v) Response: The summary areas (BUA and gravel) are noted on the cover sheet. d. Provide dimensions, side slopes, and elevations on the cross section/plan view detail per 15A NCAC 02H.1042 (2) (h). 1. Include elevations such as: lowest excavated n. point of the bioretention cell, top of planting surface, bypass elevations, top of riser structure, peak attenuation outlet, top of internal water structure, cleanout pipes, and media. Response: Additional info as requested noted on the Bio detail sheet (D5). e. Revise the media mix per Bioretention Cell MDC 6: The media shall be a homogeneous engineered media blend with approximate volumes of: (a) 75 to 85 percent medium to coarse washed sand (ASTM C33, AASHTOM 6/M80, ASTM C330, AASHTO M195, or the equivalent); (b) 8 to 10 percent fines (silt and clay); and (c) 5 to 10 percent organic matter(such as pine bark fines) Response: Additional info as requested noted on the Bio detail sheet (D5). f. It is unclear weather the outlet of the SCM is connecting to a system or is daylighting. Response: The discharge is daylighting and a rip rap apron added. Demonstrate that the outlet of the Bioretention Cell does not cause erosion in the 10-year storm per General MDC 4. Response: the Q10 discharge is approximately .068 cfs. Calculations a. Per 15A NCAC 02H .1003(5), demonstrate that stormwater outlets(of the site) are designed so that they do not cause erosion downslope of the discharge point during the peak flow from the 10-year storm event as shown by engineering calculations. Response: Calculations noted in the stormwater report noting the design of the rip rap apron as previously noted. b. Please provide calculations showing that a drawdown rate of at least 1 inch per hour can be maintained through the media and underdrains at the planting surface Gettle Engineering and Design.PLLC 3616 Waxwing Ct..Wake Forest. NC 27587, (919)210-3934. NC License P-2538 Page 2 of 3 (Bioretention MDC 9). Response: Calculations sizing the underdrain system for drawdown is noted in the stormwater report. c. This project drains to Richland Creek which is classed as a NSW in the Neuse River Basin. Ensure compliance with the Neuse Nutrient Strategy 15A NCAC 02B .0711 ( 5) by demonstrating nutrient treatment Response: Snap Tool included in the resubmittal (stormwater report)and the nitrogen target rate is met. 4 Ensure consistency across the package. In the Application Section IV, 10, it is noted that 89,733.6 SF (2.06 acres) is being treated by the SCM, but the provided calculations indicate that the drainage area to the SCM is 1.75 acres. Response: Drainage to the SCM is 1.60 acres and noted in the stormwater report. 5. A Supplement-EZ does not appear to have been provided, and therefore could not be reviewed at this time. Provide Ix hard copy and one electronic copy of the complete, original signed Supplement-EZ Form (This item is required per Sections V& VI, 3 of the Application). This form can be found on our website at the following address: https://deq.nc.gov/about/divisions/energy-mineral-and-land- resources/stormwater/stormwater-program/stormwater-design. Please note that a complete Supplement-EZ form will have 3 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. It appears that a bioretention cell supplement document may have been submitted in lieu of the Supplement-EZ form, but a complete Supplement-EZ from the provided link must be provided. Ensure that any calculations for items requested in the Supplement-EZ are provided so that the values can be verified. Response: EZ form included in the resubmittal. 6. Please provide a Response to Comments letter indicating, in a point-by-point manner, how each of the above comments has been addressed. This item is required per 15A NCAC 02H .1042(3)(b). Response: Letter provided. 7. Provide PDFs of all revisions, 2 hardcopies of revised plan sheets, 1 hardcopy of other documents, and a response to comments letter briefly describing how the comments have been addressed. Response: Noted copies submitted. \\`\1IIIIt1 /i/ \\\\\ N c fir.'Q,/��/ii Please advise if further information is required. ff • s;Q.. -v -% SEAL `� 1. Sincerely = 030913 LNGIflE,e- . va` Keith P Gettle, PE ''� �k P.G� •\ NC 30913 """'`\ Gettle Engineering and Design,PLLC 3616 Waxwing Ct_Wake Forest.NC 27587, (919)210-3934, NC License P-2538 Page 3 of 3