HomeMy WebLinkAbout20240570 Ver 1_Shoreline Stabilization_20240418Submission Form
1. Applicant Information [1 5A NCAC 02H .0502(a)]
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email* hager@lakepermit.com
Please provide an email address for payment and requests for more information here.
Owner Information:
..................................................................................................................................
Name: DANIELLE & LANCE MARKEVITCH
Email: * DMARKEVITCH112@GMAIL.COM
Phone Number: (917)494-1543
(xxx)xxx-xxxx
Mailing Address: Street Address
4904 WEBBS CHAPEL CHURCH
RD
Address Line 2
City
State / Province / Region
DENVER
NC
Postal / Zip Code
Country
28037
us
Is there an agent working on the project?* Yes
No
Agent/Consultant Information
Name: * TAMARA HAGER
Company Affiliation: LAKE PERMIT LLC/ LAKE NORMAN DREDGING
Email: * hager@lakepennit.com
Phone Number:* (704)575-2227
(xxx)xxx-xxxx
Mailing Address: *
Street Address
PO BOX 5335
Address Line 2
City
MOORESVILLE
Postal / Zip Code
28117
A signed and dated copy of the Agent Authorization letter:
MARKEVITCH AGENT.pdf
MARKEVITCH AUTH.pdf
Link to: Sample Agent Authorization Form
Project Information [1 5A NCAC 02H .0502(a) & (b)]
Project Name: * MARKEVITCH
State / Province / Region
NC
Country
us
849.08Y-B
I.3MB
If your project has a formal name please use this. If your project does not have a formal name, please identify your project
by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses
any other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads.
Upload File
Look up address
Upload Map:
Latitude: * 35.539317
Longitude: * -80.971665
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below
Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under
section 112.normal pool lake level/normal water level *
Please use the diagram at the link below:
https:Hedocs.deq.nc.gov/WaterResources/o/edoc/616616/Shoreline�/�2OLayout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard
stick, shovel handle, etc.)
4. Location of the property (where work is to be conducted)
Nearest Town: * DENVER
County: * Lincoln
Lake/ river/ ocean adjacent to NORMAN/CATAWBA
property:
Subdivisions name or site address: * BACK BAY / LOT NUMBER 8
Include phase/lot number
Directions to site:*
FROM COWANS FORD DAM HWY 73 WEST 2.5 MILES, RIGHT HWY 16 4.4 MILES, RIGHT WEBS RD 1.7 MILES, LEFT
BURTON LN.40 MILES, RIGHT WEBBS CHAPEL CHURCH RD.90 MILES, PROPERTY ON RIGHT.
Please include road names and numbers, landmarks etc.
5. Describe the existing land use or condition of the site at the time of this application:
RESIDENTIAL
Residential, undeveloped, etc.
6. Property Size .63
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or
why it is necessary):
DREDGE 35'X50'X8'DEPTH
CHANNEL - 15'X50'
8. How will the work be done?* From Land
From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
1750
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land-
ward: *
(including ail clearing, back fill, excavation, rip rap, retaining walls, etc.)
0
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to
be impacted:*
(number of trees, for instance)
NO TREES REMOVED
Sketch: MARKEVITCH INFO.pdf 1.55MB
MARKEVITCH SKETCH DREDGE.pdf 2.69MB
Application Fee:
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
� $323.00 for impacts to lake (below normal water level) of less than 1 acre
o $767.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certify that:
o 1, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best
of my knowledge and belief
1, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act");
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
cl I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name:* DANIELLE & LANCE MARKEVITCH
Signature:
AW-11C s 14WX MoWMIWI
Submittal Date: 4/16/2024
Initial Review
Is this accepted into the review process?* Yes No
Project Number:* Version: *
Select Reviewer: *
Select Reviewing Office
Has payment been received?*
What amount is owed?*
Andrew Pitner:andrew.pitner
Mooresville Regional Office - (704) 663-1699
No Payment Needed
Fee Received
Need Fee - send electronic notification
$240.00 $570.00
$323.00
$767.00