Loading...
HomeMy WebLinkAbout20151248 Ver 1_Approval Letter_20151229Water Resources ENVIRONMENTAL OVALI fY Mr. Johnathan McCall Carolina Development Services 2627 Breckenridge Centre Drive Monroe, NC 28110 PAT MCCRORY DONALD R. VAN DER VAART S. JAY ZIMMERMAN December 29, 2015 DWR# 15-1248 Union County Subject: APPROVAL of 401 Water Quality Certification and Goose Creek Buffer Authorization with Additional Conditions, Ashe Meadows Development Dear Mr. McCall: You have our approval, in accordance with the General Certification, Goose Creek Buffer Rule and those conditions listed below, for the purpose proposed in your application dated December 1, 2015 and received by the Division of Water Resources (the Division) on December 2, 2015. After reviewing your application, we have determined that this project is covered by the Goose Creek Buffer Rule and Water Quality General Certification Number 3890 which can be viewed on our web site at http://portal.ncdenr.org/web/wq/swp/ws/401. The General Certification allows you to use Nationwide Permit Number 29 once it is issued to you by the U.S. Army Corps of Engineers (COE). Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. The above noted Certification/Authorization will expire when the associated 404 permit expires unless otherwise specified in the General Certification. It is advised that all conditions of the Certification are reviewed prior to initiation of the project. In addition to the requirements of the Certification, you must also comply with the following conditions: This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new Certification. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required. If the property is sold, the new owner must be given a copy of the Certification and approval letter; and is thereby responsible for complying with all conditions. 15A NCAC 02H .0506, 15A NCAC 02H .0507, and 15A NCAC 02B .0600. 2. The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced. 15A NCAC 02H .0502 (e)] State of North Carolina I Environmental Quality I Water Resources I Water Quality Re®onal Operations Mmre,aRlle Re®onal Offcel 610 Past Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704 663 1699 3. Approved Impacts: Type of Impact Amount Approved Amount Approved Temporary Impact Permanent Impact Stream 0linear ft. 46 linear ft. Wetland 0 acre 0 acre 4. Diversion Ditches and other storm water conveyances as related to the sediment and erosion control measures shall be matted and/or stabilized to reduce sediment loss and turbidity. This includes interior/exterior slopes of sediment basins. 15A NCAC 02H .0506 (b)(3) and (c)(3) 5. Bare/fill slopes in excess of 10 feet in height and within 30 feet of surface waters shall be matted. 15A NCAC 02H .0506 (b)(3) and (c)(3) 6. A final, written storm water management is required per condition #12 of the General Certification. The SMP approved by the Division under the state stormwater program meets the requirements of the 401 Certification Program. This plan was approved for low density development. 7. Before any permanent building is occupied at the subject site, the storm water management plan shall be implemented and the facilities shall be constructed and operational. No changes to the structural storm water practices shall be made without written authorization from the Division or local delegated authority. 8. Stormwater discharge structures at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion of the stream banks. 15A NCAC 02H .0506(b)(5) 9. Use of native vegetation and other soft stream bank stabilization techniques is recommended where practicable instead of riprap or other bank hardening methods. If riprap is necessary, it shall not be placed in the streambed, unless approved by DWR 10. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 15A NCAC 02H .0506(b)(3) 11. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. 15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2) 12. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 15A NCAC 02H.0506(b)(3) This Certification and Buffer Authorization can be contested as provided in Articles 3 and 4 of the General Statute 150B by filing a written petition for an administrative hearing to the Office of the Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/or by calling the OAH Clerk's Office at (919) 431-3000. Within sixty (60) calendar days (30 days for Buffer Authorization) of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday, 8:00 am to 5:00 pm, excluding state holidays). The petitions may be faxed to the OAH at (919) 431-3100, provided the original and one (1) copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc.) Office of Administrative Hearings 1711 New Hope Church Rd. Raleigh, NC 27609-6285 One (1) copy of the petition must also be served on DEQ as follows: Mr. Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-1699 or Ms. Karen Higgins in the Central Office in Raleigh 919-807-6360. Sincerely, �L�livG"'W. Corey B� si Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office, DEQ Attachments cc: William Elliot, Army Corps of Engineers, Asheville (email) Greg Antemann, CWS (email) Karen Higgins, Wetlands Unit MRO, Land Quality