January 5, 2016
Wake County
NCDWR Project No. 20151247
SR 2132
State Project No. 5.209211.A
APPROVAL of 401 WATER QUALITY CERTIFICATION and NEUSE BUFFER AUTHORIZATION,
with ADDITIONAL CONDITIONS
Mr. J. Hopkins, P.E., Division Engineer
NCDOT, Division 5
2612 North Duke Street
Durham, NC 27704
Dear Mr. Hopkins,
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
replacing a pipe on SR 2132 in Wake County:
Stream Impacts in the Neuse River Basin
Site� Permanent Fill in Perennial �hannel Chaoge & Stabilization Temporary Dewaterin� Total Stream
� Stream tu Perennial Stream to �erennial Stream Impact
I flinear ftl (linear ft) (linear ft) (linear ft)
Total 75 I 70 (overlap) I 90 (Concurrent) I 90 I
Total Stream Impact for Project: 90 linear feet.
Neuse Ri arian Buffer [m acts
Site Zone 1 Impact Zone 1 Buffer Mitigation � Zone 2 Impact Zone 2 Buffer Mitigation
�. ��
(sa ftl Required (usin� 3:1 ratio) (sq ft) Required (using 1.5:1 ratio
Totals I 2850
N/A
1900
* ri/a = Total for Site is less than 1/3 acre and 150 linear feet of impact, no mitigation required
Total Buffer Impact for Project: 4750 square feet.
N/A
The project shall be constructed in accordance with your application received December 3, 2015. iAfter reviewing
your appiication, we have decided that these impacts are covered by General Water Quality Certification Numbers
3883 and 3885. This certification corresponds to the Nationwide Permits 3 and 13 issued by the Corps of Engineers.
This approval is also valid for the Neuse Riparian Buffer Rules (15A NCAC .02B .0233). In addition, you should
acquire any other federal, state or local permits before you proceed with your project including (but not limited to)
S��iment an� Erasior. C�ntrol, Non-Discharge and Water Suppl;� ���at�rshed regulations. This approva? wil� expire
with the accompanying 404 permit.
State of North Carolina �Enviromnental Quality � N'ater Resoiuces
16 i7 Mail Service Center, Raleigh, Norlh Carolina 27699-1617
Phone:919-807-63G0
This approval is valid solely for the purpose and design described in your application (unless modified below).
Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the
new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying
with all the conditions. [f total wetland fills for this project (now or in the future) exceed one acre, or of total
impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation
as described in 15A NCAC 2B.0233. For this approval to remain valid, you must adhere to the conditions listed in
the attached certification and any additional conditions listed below.
Conditions of Certi�cation:
1. Unless otherwise approved in this certification, placement of culverts and other structures in open waters and
streams, shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than
48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow
passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion
control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or
banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence
that the equilibrium is being maintained if requested in writing by the NCDWR. If this condition is unable to be met
due to bedrock or other limiting features encountered during construction, please contact the NCDWR for guidance on
how to proceed and to determine whether or not a permit modification will be required. [ 15A NCAC 02H.0506(b)(2)]
2. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes
aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed. [15A
NCAC 02H.0506(b)(2)]
3. For streams being impacted due to site dewatering activities, the site shall be graded to its preconstruction contours
and revegetated with appropriate native species. [15A NCAC 02H.0506(b)(2)]
4. The stream channel shall be excavated no deeper than the natural bed material of the stream, to the maximum extent
practicable. Efforts must be made to minimize impacts to the stream banks, as well as to vegetation responsible for _
maintaining the stream bank stability. An� applicable r�parian buffer impact fer access ±o stream channel shall be
temporary and be revegetated with native riparian species. [15A NCAC 02H.0506(b)(2)]
5. Channel relocations shall be completed and stabilized, prior to diverting water into the new channel. Vegetation
used for stabilization shall be limited to native riparian vegetation. Also, rip-rap may be allowed if it is necessary to
maintain the physical integrity ofthe stream. [15A NCAC 02H .0506(b)(3)]
6. All stormwater runoff shall be directed as sheetflow through stream buffers at non-erosive velocities, unless
otherwise approved by this certification. [ 15A NCAC 2B..0233]
7. All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the
preconstruction contours and revegetated. Maintained buffers shall be permanently revegetated with non-woody
species by the end of the growing season following completion of construction. For the purpose of this condition,
maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular NCDOT
maintenance activities including mowing. The area with non-maintained buffers shall be permanently revegetated with
native woody species before the next growing season following completion of construction. [15A NCAC 2B..0233]
8. Pursuant to 1 SA NCAC 2B.0233(6), sediment and erosion control devices shall not be placed in Zone 1 of any
Neuse Buffer without prior approval by the NCDWR. At this time, the NCDWR has approved no sediment and
erosion control devices in Zone l, outside ofthe approved project impacts, anywhere on this project. Moreover,
sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not
compromised and that discharge is released as diffuse flow.
9. :f concrete is used daring consiruction, a ury work area shail be maintained to pr�vent direct contact bet.��een
curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to
surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [l5A NCAC 02B.0200]
i 0. During the construction of the project, no staging of equipment of any kind is permitted in waters of
the U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)]
11. The dimension, pattern and profile of the stream above and below the crossing shall not be modified.
Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC
02H.0506(b)(2)] �
12. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for
stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic
life passage. [15A NCAC 02H.0506(b)(2)]
13. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approvaL [15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
l4. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP
measures from the most current version of NCDOT Construction and Maintenance Activities manual
such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent
excavation in flowing water. [15A NCAC 02H.0506(b)(3) and (c)(3)]
15. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream. [ 15A NCAC 02H.0506(b)(3)]
16. All mechanized e�uipment operated near surface waters must be regularly insperted and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC
02H.0506(b)(3)]
17. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
certification. [ I SA NCAC 02H.0506(b)(3)]
18. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters
is prohibited. [15A NCAC 02H.0506(b)(3)]
? 9. The permittee and its a��thorize� agents shall cor.duct its activitie� in a manner consistent with St�te water quality
s±andards (ir:clGding any ree�ui;emPnts resul'•_�r.g fram compliancP v: ith �303(d) of the Clean �x'a*:er Actl Gr.d a:�y ather • �
appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being
met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that
further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A
NCAC 02B.0200]
20. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the
Water Quality Certification and all subsequent modifications, if any, shali be maintained with the Division Engineer and
the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
21. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization
shall be clearly marked by highly visible fencing prior to any land disturbing activities. [mpacts to areas within the
fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502]
22. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having
jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and
sedimentation control requirements, etc.
23. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of
discovery. [15A NCAC 02B.0506(b)(2)]
24. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division
Engineer shall complete and return the •enclosed °Certification o; Completion Form" ta noti�y ti�e NCDWR when all
work included in the 401 Certification has been completed. [15A NCAC 02H.0502(fl]
25. Native riparian vegetation (i.e., trees and shrubs native to your geographic region� must be reestablished in the
riparian areas within the construction lim�ts of ihe projPct by the er� of the growing season following completion of
construction. [15A NCAC 02B.0506(b)(2)]
26. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this
permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be
located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road
construction activities.[15A NCAC 02H.0506(b)(3) and (c)(3)]
27. Erosion and sediment control practices must be in full compliance with all specifications governing the
proper design, installation and operation and maintenance of such Best Management Practices in order to
protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3)]:
a.
b.
The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Confrol Manual. The devices shall
be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including
contractor-owned or leased borrow pits associated with the project.
For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Surface Mining Manual.
The reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
28. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this
Certification. [15A NCAC 02H.0506(b)(3) and (c)(3)]
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition
with the office of Administrative Hearings within six .ty (60) days of receipt of this notice. A petition is considered
filec.! �x�her. it ic.recPived in the �ffire of Admin�stra+ive Hearir.�s d��ring !�erma! offce ho��rs. The Offce of
Administrat►ve Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except
for official state holidays. The original and one (1) copy ofthe petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business.days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919) 431-3000, Facsimile: (919) 431-3100
A copy of the petition must also be served on DEQ as follows:
Mr. Sam M. Hayes, General Counsel
Department of Environmental Quality
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you
have any questions, please contact Rob Ridings at 919-707-8716.
Sincerely,
��r,
, . Jay Z,immerman, Jirector �
Division of Water Resources
Electronic copy only distribution:
Eric Alsmeyer, US Army Corps of Engineers, Raleigh Field Office
Chris Murray, Division 5 Environmental Officer
Heather Montague, Division 5 Environmental Specialist
File Copy
����_
��: ;
�;,
�.,
�; ` >
�:�. -
�', -
Water Resources
ENVIRONMENTAL OUALITY
NCDWR Project No.:
Applicant:
Project Name:
Date of lssuance of 401 Water Quality Certification:
COUIIij':
PAT MCCRORY
c�,��������,r
DONALD R. VAN DER VAART
Secrelm��r
S. JAY LIMMERMAN
Uh'ec'!or
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting
Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form �
may be .eturned to NCDWR by the applicant, the applicant's authorized agent, or the proje�t engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials. ,
Signatu� e: �ate:
�g�nf's Ce; t��icatioit
(, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and cther supporting materials.