Loading...
HomeMy WebLinkAboutSW3141103_Supplement-EZ Form_20240416 SUPILEMENT-EZ COVER PAGE rI ORMS lr)AQ:Q PROJECT INFORMATION 1 !Project Name Agility-Building Expansion 2 Protect Area-(cc) 32.5486 3 Coastal Wetland Area Lac) 4 Surface Water Area(ac) 5 Is this_projiect High or Low Density? High 6 O es this project use an off-site SCM? No COMPLIANCE WITH 02H1:1003(4)._� 7 W dth of vegetated setbacks provided(feet) - - - t_ __8 Will the vegetated setback remain vegetated? _ NIA 9 If BUA is proposed in the setback,does it meet NCAC 02H 1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? I No NUMBER AND TYPE OF SCMs: 11 Infiltrat on System a _ 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wet and _ N+ 15 Permeable Pavement 16 Sand Filter 2 IIRainwater Harvesting(RWH) Green Roof 19 Level S.reader-Filter Stri. LS-FS 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale i 22 Dry Pond — _ _23 StormFilter 24 'Silva Cell _ 25 B: liter 26 Fillerra -_- FORMS LOADED DESIGNER CERTIFICATION ®Name and Title: 1- Carlton T Burton,Principle _ EllOrganization: Burton Engtneerina Associates Street address: I 5950 Fairview Rd.Suite 100 30 C ,State.Zip. Charlotte,NC 28210 31 Phonenumber(s) 704 533 8881 32 Email_ cburton@burtoneng.com Certification Statement: I certify,under penalty of law that this Supplement.EZ form and all supporting Information were prepared under my direction or supervision;that the information provided In the form is,to the best of my knowledge and belief,true,accurate,and complete,and that the engineering plans, specifications,operation and maintenance agreements and other supporting Information are consistent w th the nformation provided here. Designer N01t1t11111111111//#1�' OI��......,oil,,,,, .•••OFESS/O. 9 VI SEAL Signature of Designer 12557 z• •.F l N T.13 �;``\`�� ' 20 a If tl Dale % • d+ 2 DRAMAGE AREAS 1 l Is this a high density project? Yes 2 It so,number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 It so,number of low density drainage areas 0 1s all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM Sandlilter Sandfilter ~5 Total drainage area(sq ft) 127195 1 230868 6 Onsite drainage area(sq ft) 114127 230868 7 Offsite drainage area(sq ft) 13068 8 Total BUA in project(sq ft) I 114127 sf 175547 sf _, New BUA on subdivided lots(subject to 9 permitting)(sq ft) New BUA not on subdivided lots(subject to ` 10 permitting)(sf) 1 114127 st 175547 sf 11 Offsite BUA(sq ft) 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) — 54886 sf 116274 sf -Sidewalk(sq ft) 2573 sf -Root(sq ft) 56700 sf 56700 sf -Roadway(sq ft) _ -Future(sq ft) _ , -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) _� _ — + Existing BUA that will remain(not subject to 15 permitting)(sq ft) _. 16 Existing BUA that is already permitted(sq ft) __._T 17 Existing BUA that will be removed(sq ft) _. 18 Percent BUA 90'0 76°- 19 Design storm(inches) 1.0 in 1.0 in 20 Design volume of SCM(cu ft) _ 7072 cf 17472 cf _ 21 Calculation method for design volume Stage Storage Stage Storage ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 ldrainage area(s): SAN( FILTER 1 Drainage area number _ 1 2 2 Minimum required treatment volume(cu ft) 6818 sf I 10592 sf RALMDC Mebili2MAN MI. lit 3 Is the SCM sized to treat the SW from all surfaces at build-out? i Yee Yas 4 Is the SCM located away from contaminated soils? _ Yes Yes •5 What are the side slopes of the SCM(H:V)? _ 3:1_ 3:1 6 Does the SCM have retaining walls,gabion walls or other No No engineered side slopes? _ 7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes Yes design volume? �__ 9 What is the method for dewaterin4 the SCM for maintenance? Other Other 10 If applicable,will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC(8)? Yes - Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes If the SCM is on a single family lot,does(will?)the plat comply with 13TTGeneral MDC(10)? NIA N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes _ 15}1 Is there an O&M Plan that complies with General MDC(12)? Yes Yes _ 16 Does the SCM follow the device specific MDC? Yes Yes 17t Was the SCM designed by an NC licensed professional? t Yes Yes NECILTLR MDC FROM Q2NJag 18 SHWT elevation(fmsl) not encountered not encountered 19 Type of sand filter(open or closed) _ Open Open _ 20 If closed,will the filler will be pre-cast or pour-in-place? 21 If closed,top of Irate elevation(fmsl) — 22,Is this sand filter designed to attenuate peak flows? Yes i Yes Sediment Chamber 23 Volume that can be retained in the sediment chamber(cubic feet) 3349 cf 5177 cf - 24 Will there be a permanent pcol in the sediment chamber? No No 25,Bottom of the sediment chamber(fmsl) 790.00 _ 788.00 26 Area of the sediment chamber(square feet) _ 5986 sf 7639 sf 27 Physical depth of the sediment chamber(inches) _24 in 24 In 28 Ponding depth In the sediment chamber,above any permanent gin 15 in pool(inches) _ 29 Elevation of top of weir between chambers(fmsl) 792 790 Sand Chamber 30 Volume that can be retained in the sand chamber(cubic feet) 3443 cf _ 5410 cf 31 Bottom of the sand chamber ifms' 789.00 — 787 00 32 Area of the sand chamber I scuare leeti 3062 sf — 3944 sf 33 Physical de;Jth of the sand chamber{inches; _ 36 in 36 in _. 34 Ponding depth in the sand chamber above the sand surface 9 in 15 in (inches) __ 35 Elevation of the bypass device(fmsl) 790.7 — _- 790 36 Type of bypass device nser — riser 37 Mechanism for distributing f ow over the sand surface Rip Rap , R_p Rap 38 Sand specification for sand chamber f C33 C33 39 Depth above underdrain pipe(inches) 18 in _ 18 n 40 Will the media be maintained to drain at least two in:hes per hour at Yes Yes the sand surface? _ 41 Is at least one clean-cut pipe prov ded at the low point of each Yes Yes underdrain ine? 42 Will clean-out pipes be capped? J Yes Yes ADDITIONAL INFORMATION 43' 1 Please use this space to prov de any additional information about i the sand filteqs;7. Snnc$a otter 3 10:52 AM 2/1/2024