Loading...
HomeMy WebLinkAboutSW3141103_O&M Agreement/Plan_20240416 1111 If 11111111111 III II 1111 1111111111 Doc ID: 015501140004 Type: CRP Recorded: 04/05/2024 at 09:10:04 AM q Fee Amt: $26.00 Page 1 of 4 4 Rowan, NC J. E. Brindle Register of Deeds BK 1 4 3 9 PG930 • 1)S‘kt • DOCUMENT COVER SHEET DOCUMENT TYPE: 7'1 PREPARED BY: • - - GRANTOR(S): t\IC- GRANTEE(S): tl141%. „ BENEFICIARY: • IF APPLICABLE: TAX MAP PARCEL NUMBER BRIEF DESCRIPTION: RETURN TO: Operation & Maintenance Agreement Project Name: Agility - Building Expansion (formerly Project Marley) Project Location: 1010 Coporate Center Drive, Salisbury, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s)on this project include (check all that apply&corresponding O&M sheets will be added automatically): Infiltration Basin Quantity: Location(s): Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: Location(s): Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantity: Location(s): Sand Filter Quantity: 3 Location(s): Rainwater Harvesting Quantity: Location(s): Green Roof Quantity: Location(s): Level Spreader- Filter Strip Quantity: Location(s): Proprietary System Quantity: Location(s): Treatment Swale Quantity: Location(s): Dry Pond Quantity: Location(s): Disconnected Impervious Surface Present: No Location(s): User Defined SCM Present: No Location(s): Low Density Present: No Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Donald Ruddy Jr Title& Organization: VP Operations-Agility North Carolina LLC Street address: 1010 Corporate Center Drive City, state, zip: Salisbury,NC 28146 Phone number(s): 704-870-3643 Email: don.ruddy@hexagonagility.com Signature: / Date: /34 l, J /n► ,r �drr�)l , a Notary Public for the State of -- County of A.() )4/1 , do hereby certify that /1)444I —1/ personally appeared before me this _514_ day of Qraaryg1de� /and acknowledge the due execution of the Opera 'ons a d Maintenanc reemen . Witness my hand and official seal, • tc>°NOTARy��,:� --.— ▪ PUBLIC43 f _ Seal °41'44616°1. My commission expires STORM-EZ 2/5/2024 Version 1.5 O&M Agreement Page 1 of 1 Sand Filter Maintenance Requirements Important operation and maintenance procedures: - Manage the drainage area to reduce the sediment load to the sand filter. - Clean out the sedimentation chamber or forebay whenever sediment depth exceeds six inches. - At least once a year, skim the sand media - Replace the sand filter media whenever it fails to function properly after maintenance. After the sand filter is established, it shall be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches(or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Entire sand filter Trash/debris is present. Remove the trash/debris. Adjacent pavement(if Sediment is present on the applicable) pavement surface. Sweep or vacuum the sediment as soon as possible. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, plant ground cover The perimeter of the sand erosive gullies have formed. and water until it is established. Provide lime and a one-time fertilizer filter application. Vegetation is too short or too Maintain vegetation at an appropriate height. long. The structure is clogged. Unclog the structure and dispose of sediment in a location where it The flow diversion will not cause impacts to streams or the SCM. structure (if applicable) The structure is damaged. Make any necessary repairs or replace if the damage is too much for repair. The inlet pipe is clogged (if Unclog the pipe and dispose of sediment in a location where it will not applicable). cause impacts to streams or the SCM. The inlet pipe is cracked or otherwise damaged (if Repair or replace the pipe. applicable). The inlet device Regrade the swale if necessary and provide erosion control devices Erosion is occurring in the such as reinforced turf matting or riprap to avoid future problems with swale(if applicable). erosion. Stone verge is clogged or covered in sediment(if Remove sediment and clogged stone and replace with clean stone. applicable). Sediment has accumulated Search for the source of the sediment and remedy the problem if to a depth of greater than six possible. Remove the sediment and dispose of it in a location where inches. it will not cause impacts to streams or the SCM. Sediment chamber (forebay) Provide additional erosion protection such as reinforced turf matting Erosion has occurred. or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Sand Filter Maintenance Requirements(continued) SCM element: Potential problem: How to remediate the problem: Sand chamber and Water is ponding on the Check to see if the collector system is clogged and flush if necessary. underdrain collection surface for more than 24 If water still ponds, remove the top few inches of filter bed media and system hours after a storm. replace. If water still ponds, then consult an appropriate professional. Clogging has occurred. Clean out the outlet device and dispose of sediment in a location ogg g where it will not cause impacts to streams or the SCM. The outlet device The outlet device is Repair or replace the outlet device. damaged. Erosion or other signs of damage have occurred at the Repair the damage and improve the flow dissipation structure. outlet. The receiving water Discharges from the sand filter are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receiving water.