Loading...
HomeMy WebLinkAbout20151022 Ver 1_General Correspondence_20160105ELECTRICAL CONSULTIN6 ENGINEERS December 16, 2015 North Carolina Department of Cultural Resources Division of Water Resources 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Re: EnergyUnited — Distribution Line Relocation on Lake Norman Permitting Review To Whom it May Concern: p ������ ti;� ,.__.._ _�..�,� DEC 2 9 2015 _� DENR - WATER RESOURCES EnergyUnited of Statesville, North Carolina plans to relocate a span of a distribution power line located in Mooresville (Iredell County), North Carolina. The planned facilities must be relocated due to a NCDOT project. Description of this project and a reference map showing the proposed location is enclosed. In order to expedite securing the Duke Energy crossing permit, we would appreciate your written comments concerning this work within thirty (30) days. Received comments will be included in a Duke Energy Crossing Permit. If you have any questions or need additional information, please advise. Respectfully Submitted, ELECTRICAL CONSULTING ENGINEERS, INC. c �BY • Michael C. Bynum Encl. cc: Mr. Steve McCachern , EnergyUnited � ������ �� � J � _; ;�, `:�1 � � 7 016 �� � i�� . v� ;?F��: ! :::SOUZ�ES T��SpO,� �„i IOtJ P�RininIPJG UNIT 2407 North Tryon Street Charlotte, NC 28206 Teleph o ne: 704-372-6673 www.ECEpower.com Project Contact Information: Consulting Engineer: Mr. Michael Bynum _, ECE 2407 N Tryon St Charlotte, NC 28206 704-372-6673/m bvnum(a�ecepower.com Utility: EnergyUnited Mr. Steve McCachern 567 Mocksville Hwy. Statesville, NC 28625 704-873-5241 /Steve. McCachern(c�enerqyu nited.com Proposed Distribution Line Relocation on Cornelius Road (NCDOT Iredell B-5142): Approximate Address of Relocation 711 Cornelius Rd. Mooresville, NC Iredell County This project involves the relocation of a 12.47/7.2kV Distribution Line. This relocation is due to the construction of a new bridge on Cornelius Road, by the NCDOT. As shown in the attached diagram the existing distribution line is located on the east side of the bridge. The proposed line will be installed on the west side of the existing bridge. The proposed line will take the place of an existing fiber/cable line, which is also shown on the diagram. The existing fiber/cable line will be removed and new fiber/cable will be installed on the proposed distribution line as underbuild. Once the proposed relocation is complete there will only be one power line crossing over Lake Norman, instead of the current two lines. The consolidation of the power and fiber/cable lines should lessen the environmental impact caused to the lake and surrounding areas. LOCATION MAP MOORESVILLE, NORTH CAROLINA IREDELL COUNTY N.T.S. PLAN VIEW STREET VIEW NOTE: �ate ALL POLES ARE SHOWN IN APPROXIMATE LOCATION THE INFORMATION ON THIS DRAWING IS PROPRIETARY AND IS NOT TO BE USED, REPRODUCED, OR COPIED WITHOUT THE WRITTEN CONSENT OF ELECTRICAL CONSULTING ENGINEERS, INC. Revision VICINITY MAP NOT FOR CONSTRUCTION BY ENERGYUNITED NCDOT PROJECT IREDELL Scale:NTS B-5142 - CORNELIUS ROAD DISTRIBUTION LINE RELOCATION Date: DEC. 2015 VICINITY MAP Drawn By: DAM ����2107 NOR7H TRYON ST APProved: MCB CHARLOTTE, NC 2620C TEL: 701-372-6673 �ob No.: 10-85 FIRh1 NO. F-0429 ELECTRICAL CONSULTING ENGWEERS '�"+`�'��ECEpower.com Sheet 1 Of �