HomeMy WebLinkAboutNCC221190_Annual Fee NOD Letter (2024 Fee)_20240416 e
154"
ROY COOPER
Govemor
ELIZABEIH S.BISER N.. 0
Secrehuy
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Inter"Director EnWonmental Qual ty
4/16/2024
Moseley Real Estate Advisors, Inc.:William K. Moseley
Attn:William Moseley
1100 Kenilworth Avenue, Suite 210
Charlotte, NC 28204
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC221190-2024
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit
NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee
was billed on 3/1/2024 and was due on 4/1/2024.The annual fee applies to the following construction site:
Multi-Tenant Retail
10771 US 15-501 HWY,Town of Southern Pines, NC
Moore County
Certificate of Coverage No. NCC221190
NC Reference No. NCG01-2022-1190
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Kieu Tran at kieu.tran@deq.nc.gov.
Sincerely,
William E.Vinson,Jr., PE,CPESC,CPM
Interim Director
Division of Energy, Mineral,and Land Resources
D_E Q� Nrnlh Cara7ina Deparlmenl of Cnvroament:J Qwlily Drvisirr ul Cnrryy.Mineral urwl Lancf Frsorrccs
Sl2 Nur R,Salisbury Slrrel I Iol2 Mail Se s,ceCmter Rork iyh.Nurlh Caroline Tiboo I612