Jamie,
Medlin, Kenneth N
Thursday, September 04, 2014 4:15 PM
Lancaster, Jamie J
Gray, Jared S; Frazer, Mary E
RE: Div. 7 Express Design Build Bridge Replacement Year 4- Request for Environmental
Studies
Only one project - 17BP.7.R.87, structure #670073 — had potential T& E aquatic species issues. Although the project is
located in Orange County and the Cape Fear shiner is not listed by USFWS as occurring there, Cane Creek is a tributary of
the Haw River where the species has been documented. However, the project site is located above a small reservoir
(Cane Creek Reservoir) that isolates it from the river and any existing Cape Fear shiner population. Therefore, this
project will have No Effect on the species.
Dwarf Wedgemussel is listed by USFWS as potentially occurring in Orange County, but only for that portion of the
county located in the Neuse River Basin. The project is located within the Cape Fear River Basin and Dwarf
Wedgemussel has never been recorded from that river basin. Therefore, completion of this project will have No Effect
on this species.
Please note that all of the projects on your referenced spreadsheet will need to be evaluated for potential effects on the
Northern Long-eared Bat due to its proposed listing effective as early as April 2015.
Let me know if you have questions or need any additional information.
Neil
From: Lancaster, Jamie J
Sent: Monday, August 25, 2014 12:19 PM
To: Medlin, Kenneth N
Cc: Williams, Pamela R; Mabry, Virginia G; Powers, Tim
Subject: FW: Div. 7 Express Design Build Bridge Replacement Year 4- Request for Environmental Studies
Neil,
Due to changes in legislation, some of the Division 7 bridges originally planned for Year 4 will not be able to be pursued
at this time. Due to this, 6 additional bridges have been selected to be included in the Year 4 Express Design Build
Bridges for Division 7.
Please survey and prepare a survey report if necessary for all aquatic species for the attached list of Bridge
Replacement Projects in Division 7. The APE is 300' from each end of the bridge and 75' from the centerline
of the roadway. The requests for T&E species, wetland delineation & forms, riparian buffer determination and
completion of the data sheets has already been made to Rachelle's group.
Please provide this information by September 30, 2014.
If this is not feasible, have any questions or need additional information, please let me know.
Thanks,
Jamie
Jamie J. Lancaster, PE
Transportation Program Management — Priority Projects Office
919-707-6620 (office)
919-212-5711 (fax)
From: Lancaster, Jamie J
Sent: Monday, August 25, 2014 12:12 PM
To: Beauregard, Rachelle
Cc: Williams, Pamela R; Mabry, Virginia G; Powers, Tim
Subject: Div. 7 Express Design Build Bridge Replacement Year 4- Request for Environmental Studies
Rachelle,
Per our conversation, due to changes in legislation, some of the Division 7 bridges originally planned for Year 4 will not
be able to be pursued at this time. Due to this, 6 additional bridges have been selected to be included in the Year 4
Express Design Build Bridges for Division 7.
I would like to request that all environmental studies (i.e. T&E species, wetland delineation and forms, riparian buffer
determination, completion of data sheets, etc.) be completed for the attached list of bridges. Attached is an example
data sheet with areas highlighted in yellow to be completed. The actual impact will be completed by the Design-Builc
Team. The limits of the project are 300 feet from each end of the bridge and 75 feet from each side of the centerline.
Per our conversation, we will be holding on-site Field Scoping meetings on either September 17 or 18 and Dave Bailey
would like to do the verifications at that time. If possible, please complete your work prior to those meetings and have
someone available to attend the meeting. I will notify you as soon as I determine the meeting date.
If this is not feasible, have any questions or need additional information, please let me know.
Thanks,
Jamie
Jamie J. Lancaster, PE
Transportation Program Management — Priority Projects Office
919-707-6620 (office)
919-212-5711 (fax)
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
WBS # DIV Str # COUNTY ROUTE ACROSS Lat/Long
17BP.7.R.86 7 400189 Guilford SR 2719 UT Reedy Fork 36.18819533 /-79.60141783
17BP.7.R.86 7 400207 Guilford SR 2808 UT Rock Creek 36.07146937 /-79.6159973
17BP.7.R.86 7 400258 Guilford SR 3351 South Prong Stinking Quarter Creek 35.95346894 /-79.55495367
17BP.7.R.86 7 400272 Guilford SR 3368 Climax Creek 35.94589033 /-79.65890941
17BP.7.R.86 7 400431 Guilford SR 2719 UT Reedy Fork 36.20324141 /-79.58971761
176P.7.R.87 7 670073 Orange SR 1115 Cane Creek 35.99861149 /-79.19389246
Lancaster, Jamie J
From:
Sent:
To:
Cc:
Subject:
Attachments:
Neil,
Lancaster, Jamie J
Monday, August 25, 2014 12:19 PM
Medlin, Kenneth N
Williams, Pamela R; Mabry, Virginia G; Powers, Tim
FW: Div. 7 Express Design Build Bridge Replacement Year 4- Request for
Environmental Studies
Div. 7 Year 4 Express Design-Build Species_wetland Request 8-25-14.xlsx; Checklist for
DB bridges.xls
Due to changes in legislation, some of the Division 7 bridges originally planned for Year 4 will not be able to be pursued
at this time. Due to this, 6 additional bridges have been selected to be included in the Year 4 Express Design Build
Bridges for Division 7.
Please survey and prepare a survey report if necessary for all aquatic species for the attached list of Bridge
Replacement Projects in Division 7. The APE is 300' from each end of the bridge and 75' from the centerline
of the roadway. The requests for T&E species, wetland delineation & forms, riparian buffer determination and
completion of the data sheets has already been made to Rachelle's group.
Please provide this information by September 30, 2014.
If this is not feasible, have any questions or need additional information, please let me know.
Thanks,
Jamie
Jamie J. Lancaster, PE
Transportation Program Management — Priority Projects Office
919-707-6620 (office)
919-212-5711 (fax)
From: Lancaster, Jamie J
Sent: Monday, August 25, 2014 12:12 PM
To: Beauregard, Rachelle
Cc: Williams, Pamela R; Mabry, Virginia G; Powers, Tim
Subject: Div. 7 Express Design Build Bridge Replacement Year 4- Request for Environmental Studies
Rachelle,
Per our conversation, due to changes in legislation, some of the Division 7 bridges originally planned for Year 4 will not
be able to be pursued at this time. Due to this, 6 additional bridges have been selected to be included in the Year 4
Express Design Build Bridges for Division 7.
I would like to request that all environmental studies (i.e. T&E species, wetland delineation and forms, riparian buffer
determination, completion of data sheets, etc.) be completed for the attached list of bridges. Attached is an example
data sheet with areas highlighted in yellow to be completed. The actual impact will be completed by the Design-Builc
Team. The limits of the project are 300 feet from each end of the bridge and 75 feet from each side of the centerline.
Per our conversation, we will be holding on-site Field Scoping meetings on either September 17 or 18 and Dave Bailey
would like to do the verifications at that time. If possible, please complete your work prior to those meetings and have
someone available to attend the meeting. I will notify you as soon as I determine the meeting date.
If this is not feasible, have any questions or need additional information, please let me know.
Thanks,
Jamie
Jamie J. Lancaster, PE
Transportation Program Management — Priority Projects Office
919-707-6620 (office)
919-212-5711 (fax)