Loading...
HomeMy WebLinkAboutNCC241119_ESC Approval Submitted_20240415 ROY COOPERa Governor ELIZABETH S. BISER t 1tt Secretary 't WILLIAM E.TOBY VINSON,JR. "" * Interim Director NORTH CAROLINA Environmental Quality March 28, 2024 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Carolinas, LLC Attention: Issa J. Zarzar, General Manager, CCP Project Management 411 Fayetteville Street,NC03 Raleigh,North Carolina 27601 RE: Project Name: Buck Main and Additional Soil Stockpile E&SC Acres Approved: 10.5 Project ID: ROWAN-2024-0101 County: Rowan, City: Salisbury Address: Dukeville Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: John Bove, PE, AECOM Date Received by LQS: March 8, 2024 Plan Type: New Dear Mr.Zarzar: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval,if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the four is reviewed and found to be complete,you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI foirii may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources iMooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 704-235-2100 Letter of Approval with Modifications Duke Energy Carolinas, LLC March 28, 2024 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is perfoiinance-oriented,requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notified this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Ai Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet c: Inspection Department ec: John Bove, PE Letter of Approval with Modifications Duke Energy Carolinas, LLC March 28, 2024 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Buck Main and Additional Soil Stockpile E&SC Project ID: ROWAN-2024-0101 County: Rowan 1. Temporary diversion berms shall be installed to direct all runoff from soil stockpiles to the ash basin at all times. 2. Adequate temporary and permanent seeding specification must be used. See attached specifications.