HomeMy WebLinkAboutP1584 Culvert X-ing Exhibit.pdfLEGEND CLASS II RIP RAP COUNTERSUNK 1.5' IN STREAM BED, NOT EXCEED ORIGINAL STREAM BED ELEVATION, SUPPLEMENT WITH CLASS I RIP RAP TO FILL VOIDS PERMANENT STREAM/WETLAND IMPACTS ® TEMPORARY STREAM/WETLAND IMPACTS (38 LF/0.006AC) JURISDICTIONAL FEATURE BOUNDARY — — TEMPORARY FLEXIBLE PUMP HOSE IMPERVIOUS DIKE ■ BYPASS PUMP • SILT BAG OUTFALL RIP RAP INSTALLATION DETAIL O om v yy wiz D CA10 r OT iw m z 1 = D 0010, z xI z ,.., o � -n n DyD r, CD ~ 7 z L� C C7 m z o c1 9 r N M y 31 Do a� a N z � z A O o„ C r m co co OUTLET W/DITCH OUTLET W/O DITCH D CLASS V RIP RAP CLASS I RIP RAP CLASS V RIP RAP CLASS I RIP RAP TONS F y S.Y. TONS TONS F S.Y. TONS F IF' 2 5x 5 2 5 1 4 2 1 4 15" 2 7 7 3 7 1 5 3 2 6 18" 3 10 9 4 10 2 7 4 2 8 24" 5 14 15 7 15 3 11 7 4 12 30" 8 21 21 11 22 5 16 11 7 17 36" 11 28 29 15 30 7 22 16 10 23 42" 15 37 1 39 20 39 1 10 28 22 13 30 48" - 49 26 50 28 17 38 54" 60 33 62 36 21 47 60" 73 40 75 44 26 56 66" 87 48 1 89 1 54 1 32 1 67 72" 102 57 1 104 1 64 1 38 1 78 NUTE: FOR CALCULATION PURPOSES CLASS 'BRIP RAP --- -- -- CLASS I RIP RAP = A�j PLAN D SLOPE 111:1 OR FLATTER H ® T FILTER FABRIC SECTION A -A PIPE OUTLET WITH DITCH H= RIP RAP TO TOP OF PIPE (MAX. H = D + T) T= 15" CLASS I RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS T= 12, CLASS 'B' RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS aXD B u IT SECTION B-B PIPE OUTLET WITHOUT DITCH IA I.- Lu J I- 0 0 0 c7 W z o_ M a CL fr �a 0 o a ¢ 0 N C C J z 0 w LL W in 0 STREAM DIVERSION AND PUMP AROUND GENERAL NOTES 1. ALL STREAM WORK TO BE PERFORMED "IN THE DRY" OUT OF STREAM FLOW BY PUMP -AROUND. 2. CONTRACTOR SHALL USE A "SILENT PUMP" FOR All PUMP -AROUND WORK ASSOCIATED WITH THIS PROJECT. 3. IMPERVIOUS DIKES OR COFFER DAMS ARE TO BE USED TO ISOLATE WORK FROM STREAM FLOW. 4. MAINTENANCE OF STREAM FLOW OPERATIONS SHALL BE INCIDENTAL TO THE WORK. THIS INCLUDES PUMPS AND HOSES. 5. GRADED STREAM BANKS SHALL BE STABILIZED, WITH MATTING, PRIOR TO PREDICTED RAIN FALL EVENTS, UNLESS ALL RAIN EVENT FLOW CAN BE PUMPED AROUND FOR PREDICTED EVENT. 6. PUMPS AND HOSES SHALL BE SUFFICIENT SIZE TO DEWATER THE WORK AREA. P1584 PARACHUTE TOWER ROAD 72" CULVERT EXTENSION 20' TOP OF BANK O m mi Lu 0 LLI I NN r__1 u II � 4 -<-w, TOP OF BANK SEQUENCE OF CONSTRUCTION FOR TYPICAL STREAM WORK AREA GRAPHIC SCALE IN FEET 0 25 50 100 i 1. CONTRACTOR SHALL DETERMINE A PROPOSED SIZE AND LOCATION OF GEOTEXTILE DEWATERING SILT BAG FOR APPROVAL BY THE ENGINEER PRIOR TO INSTALLATION. 2. INSTALL GEOTEXTILE DEWATERING SILT BAG, AS APPROVED. 3. INSTALL BYPASS PUMP AND DEWATERING PUMP AND NECESSARY TEMPORARY FLEXIBLE HOSE. CONNECT DEWATERING PUMP TO GEOTEXTILE DEWATERING BAG. 4. PLACE UPSTREAM IMPERVIOUS DIKE AND COFFER DAMS TO ISOLATE THE WORK AREA. BEGIN BYPASS PUMPING FOR STREAM PUMP AROUND OPERATION. 5. PLACE DOWNSTREAM IMPERVIOUS DIKE FOR STREAM PUMP AROUND OPERATION. BEGIN DEWATERING THE ISOLATED WORK AREA. AREA TO BE DEWATERED SHALL BE EQUAL TO ONE DAY'S WORK. 6. PERFORM WORK WITHIN STREAM IN ACCORDANCE WITH THE PLANS. 7. EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERVIOUS DIKES AND/OR COFFER DAMS. REMOVE IMPERVIOUS DIKES, COFFER DAMS, PUMPS, AND TEMPORARY FLEXIBLE HOSE, (DOWNSTREAM IMPERVIOUS DIKES COFFER DAM FIRST), 8. PUMP AROUND AREA TO BE STABILIZED WITH MATTING AT THE END OF EACH WORK DAY. THE IMPERVIOUS DIKE LOCATIONS AS SHOWN ON THIS SHEET ONLY SHOW THE UPPER AND LOWER EXTENT OF WORK FOR EACH STREAM SEGMENT. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE LOCATION OF THE IMPERVIOUS DIKE(S) FOR EACH DAY'S WORK 9. REMOVE SILT BAG AND PROPERLY DISPOSE OF CAPTURED SEDIMENT AND SILT BAG. STABILIZE DISTURBED AREA WITH SEED AND MULCH. PLAN VIEW Kimley*Horn March 25, 2024 LEGEND CLASS II RIP RAP COUNTERSUNK 1.5' IN STREAM BED, NOT EXCEED ORIGINAL STREAM BED ELEVATION, SUPPLEMENT WITH CLASS I RIP RAP TO FILL VOIDS PERMANENT STREAM/WETLAND IMPACTS PROFILE - INLET CHANNEL IMPROVEMENTS LOOKING DOWNSTREAM EXISTING EDGE OF GRADED SHOULDER PROPOSED ROADWAY E STREAM r ELEVATION AT CROSSING ELEVATION AT CROSSING / 18.14' EXISTING 18.63' GROUND r- - - - - - I I r' 6.4 3.3 PROPOSED CULVERT TO BE BURIED MINIMUM 1 FT BELOW NATURAL STREAM BED 72" RCP UPSTREAM EXTENSION INV 5.80 PARACHUTE TOWER CONNECTOR ROAD CROSS SECTION STA. 302+44.82 ROAD CONSTRUCTION M 00 J 00 00 c6 W .. C. EXISTING o 0 GROUND 0 / / / /I i � I L--J-====____ P1584 PARACHUTE TOWER ROAD I EXISTING 72" 72" CULVERT EXTENSION n n -7' PROFILE & CROSS SECTION VIEW z GRAPHIC SCALE IN FEET 0 5 10 20 Kimley)))Horn March 25, 2024