February 16,2022
Mr.Brad Cornwell, General Manager
Cleveland County Water
PO Box 788
Lawndale,NC 28090
Subject: Letter of Intent to Fund
Casar-Lawndale, Sandy Hills, and Will
Dixon Road Water Lines
American Rescue Plan-Earmark
Project No.: SRP-D-ARP-0036
Dear Mr. Cornwell:
The Division of Water Infrastructure has reviewed your Request for Funding, and
determined your project is eligible to receive American Rescue Plan(ARP)funding from the
State Fiscal Recovery Fund established in S.L.2021-180.Projects funded from the State Fiscal
Recovery Fund must meet applicable federal law and guidance for the ARP funds. The ARP
Project Grant will be one hundred percent of eligible project costs up to a maximum of
$5,550,000.
The first milestone is the submittal of a Bid and Design Package by August 1,2022.
Please note that this intent to fund is contingent on meeting all of the following milestones:
_Milestone Date
Apply for all Necessary Permits* ASAP
Bid and Design Package Submittal(obtain all permits) August 1,2022
Bid and Design Package Approval December 1,2022
Advertise Project,Receive Bids, Submit Bid Information, April 3,2023
and Receive Authority To Award
Execute Construction Contract(s) May 1, 2023
Receive last reimbursement-Statutory December 31,2026
*An engineering alternatives analysis(EAA)may be required on certain projects.
Failure to meet any milestone may result in the forfeiture of funding for the proposed
project.
ANorth Carolina Department of Environmental Quality ll Division of Water Infrastructure
'�/�//lg 512 N.Salisbury Street 11633 Mail Service Center I Raleigh,North Carolina 27699-1633
NORTH CAROIJNA
Del="Milt at Einkortmeata m� /"� 919.707.9160
Mr. Brad Comwell, General Manager
February 16,2022
Page 2 of 2
Note that the Division will make no reimbursements of ARP funds after December 31,2026
The State Environmental Policy Act exempts projects funded by the State Reserve(such
as this project) from state-mandated environmental review. Federal requirements may still apply.
[NCGS 113A-12(2)h.]
Upon detailed review of the project during the funding process, it may be determined that
portions of your project are not eligible for funding.
US Treasury Requirements
Projects with an expected total cost of ten million dollars or more must meet US Treasury
requirements for prevailing wage rates,project labor agreements,and related requirements.
Recipients can either certify meeting the requirements or provide plans and reports as the SLFRF
Compliance and Reporting Guidance Update 2.1 final (treasury.gov) specifies.
Drought Bill Requirements
In accordance with G.S. 143-355.4, a project"for the purpose of extending waterlines or
expanding water treatment capacity"must document numerous requirements during the review
process.You can find additional information at the following link:
http://www.ncleg.net/enactedlegislation/statutes/html/bysection/chapter 143/gs 143-355.4.html
If you have any questions,please contact Michelle McKay,by phone at(919)707-9171
or by email at michelle.mckay@ncdenr.gov.
Sincerely,
?-frp Ayet..a.4..df
Jon Risgaard, Chief
State Revolving Fund Section
CC: Charles A. Willis,Jr. PE,BCEE,Willis Engineers,Charlotte
Vincent Jude Tomaino,PE (DWI,via email) V
Michelle McKay (DWI,via email)
Mark Hubbard,PE(DWI,via email)
ARP Project File(COM_LOIF)