HomeMy WebLinkAboutNCC241128_(ARPA) DWI Letter of Intent to Fund_20240412 ROY COOPER `� °`, Governor 7' r .%_---' ELIZABETH S.BISER `` Secretary _, SHADI ESKAF NORTH CAROLINA Director Environmental Quality February 16,2022 Mr.Brad Cornwell, General Manager Cleveland County Water PO Box 788 Lawndale,NC 28090 Subject: Letter of Intent to Fund Casar-Lawndale, Sandy Hills, and Will Dixon Road Water Lines American Rescue Plan-Earmark Project No.: SRP-D-ARP-0036 Dear Mr. Cornwell: The Division of Water Infrastructure has reviewed your Request for Funding, and determined your project is eligible to receive American Rescue Plan(ARP)funding from the State Fiscal Recovery Fund established in S.L.2021-180.Projects funded from the State Fiscal Recovery Fund must meet applicable federal law and guidance for the ARP funds. The ARP Project Grant will be one hundred percent of eligible project costs up to a maximum of $5,550,000. The first milestone is the submittal of a Bid and Design Package by August 1,2022. Please note that this intent to fund is contingent on meeting all of the following milestones: _Milestone Date Apply for all Necessary Permits* ASAP Bid and Design Package Submittal(obtain all permits) August 1,2022 Bid and Design Package Approval December 1,2022 Advertise Project,Receive Bids, Submit Bid Information, April 3,2023 and Receive Authority To Award Execute Construction Contract(s) May 1, 2023 Receive last reimbursement-Statutory December 31,2026 *An engineering alternatives analysis(EAA)may be required on certain projects. Failure to meet any milestone may result in the forfeiture of funding for the proposed project. ANorth Carolina Department of Environmental Quality ll Division of Water Infrastructure '�/�//lg 512 N.Salisbury Street 11633 Mail Service Center I Raleigh,North Carolina 27699-1633 NORTH CAROIJNA Del="Milt at Einkortmeata m� /"� 919.707.9160 Mr. Brad Comwell, General Manager February 16,2022 Page 2 of 2 Note that the Division will make no reimbursements of ARP funds after December 31,2026 The State Environmental Policy Act exempts projects funded by the State Reserve(such as this project) from state-mandated environmental review. Federal requirements may still apply. [NCGS 113A-12(2)h.] Upon detailed review of the project during the funding process, it may be determined that portions of your project are not eligible for funding. US Treasury Requirements Projects with an expected total cost of ten million dollars or more must meet US Treasury requirements for prevailing wage rates,project labor agreements,and related requirements. Recipients can either certify meeting the requirements or provide plans and reports as the SLFRF Compliance and Reporting Guidance Update 2.1 final (treasury.gov) specifies. Drought Bill Requirements In accordance with G.S. 143-355.4, a project"for the purpose of extending waterlines or expanding water treatment capacity"must document numerous requirements during the review process.You can find additional information at the following link: http://www.ncleg.net/enactedlegislation/statutes/html/bysection/chapter 143/gs 143-355.4.html If you have any questions,please contact Michelle McKay,by phone at(919)707-9171 or by email at michelle.mckay@ncdenr.gov. Sincerely, ?-frp Ayet..a.4..df Jon Risgaard, Chief State Revolving Fund Section CC: Charles A. Willis,Jr. PE,BCEE,Willis Engineers,Charlotte Vincent Jude Tomaino,PE (DWI,via email) V Michelle McKay (DWI,via email) Mark Hubbard,PE(DWI,via email) ARP Project File(COM_LOIF)