HomeMy WebLinkAboutNCC232468_NOT Supporting Documents (3)_20240409 D0YC00PE&
Governor
GL[[AB2T8S.8IS8l
Secretary
VV[LL(AK4G.T08YVlNS(}N, NnRTHcARoum4
mtorimoirector Environmental Quality
yJovecoher29, 2033
SEDIMENT AND EROSION CONTROL @& CONSTRUCTION STORMWATGR
INSPECTION REPORT
Halstead Elizabeth, LLC
Attn: Mr.James Leach, Member
2950SVV27 m Avenue, Suite 3OD
Miami, Florida 33133
Dear Sir:
Attached is a copy of the inspection report prepared following an onsite inspection of the project
referenced on the report. This report is intended to inform you of the p ject'scornp|iancevvith
the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES
Stornoxvater General Permit.
Please review this report carefully as it may contain corrective actions needed and/or comments
which will assist you in meeting the required performance standards.
It is our desire that any and all possible problems be discussed and resolved at the earliest
possible time. To facilitate this effort, please contact me at the address/phone number below
should you have any questions.
Sincerely,
ZI
Richard Peed, CPESC
ARPA Environmental Specialist ||
(352) 946-6401
TI� � DEC �r ��--_-' �— °`� °� ^°^*
North Carolina Department vrsnv/mnmema/Quality Div!.io^wcncrg»Mineral and Land xrsvv,cvu
E �� xlau/mumooenona/o�o **zwmsun«wn square Mail
iu�s�ne�m'.wvo`�amxnazmmw
Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington,NC 27889 (252) 946-6481
County: Pasquotank Project: Wawa-Elizabeth City River basin: Pasquotank
Person financially responsible:Halstead Elizabeth,LLC-James Leach,Memeber Project#: PASQU-2023-007
Address: 2950 SW 27th Ave.,Suite 300,Miami,FL 33133
1. Project Location: Halstead Blvd.,Elizabeth City
Pictures: No
2. Weather and soil conditions: cool,rainy,damp Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Randy Title:
Inspection report: Sent Report Date given/sent: November 29,2023
9. Corrective action needed:
10. Comments: Project has started.Existing features have been removed.Measures installed. Site now being
graded.Please remember to install and maintain erosion and sedimentation control measures
as per the approved plan.Discussed site with Randy.
Reported by: Richard Peed Others present:
Date of inspection: November 21,2023 Time arriving on site: 1:20 PM Time leaving site: 1:35 PM
CC: