Loading...
HomeMy WebLinkAboutShoreline - Eagle Creek Renewable EmergyROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Dtrector NORTH CAROLINA State of North Carolina Environmental Qualtty Department of Environment Quality Division of Water Resources 1SA NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization Shoreline Stabilization Application Form FORM: SSGP 09-2020 Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service Paul Wojoski DWR-401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski DWR-401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. \ Attach documentation v re-Filin eeting Request to this application. Date of Pre -filing Meeting R st: �� (required) DWR ID # Ve ion (if applicable) A. Applicant Information [15A NCAC 02H .0502(a)1 1. Owner Information Name: Eagle Creek Renewable Energy Mailing Address: 293 Hwy 740 Badin, NC 28009 Telephone Number: 910/975-1576 Fax Number: E-mail Address: 1eff.Henley@eaglecreekre.com w North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh. North Carolina 27699-1617 919,707.9000 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http:/Iwww.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.Pdf) Name: N/A Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information f15A NCAC 02H .0502(a) & (b)1 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Montgomery Nearest Town: New London Lake/ river/ ocean adjacent to property: Narrows Reservoir / Badin Lake Property size (acres): 18.5 acres Subdivision name or site address (include phase/lot number): 711 Tuckertown Road, New London, NC Directions to site - please include road names and numbers, landmarks, etc.: 1-85 to Innes St. exit Salisbury, south on US Hwy 52, left on NC Hwy 49, right on Tuckertown Rd., dam site and fishing access area is on the right. Latitude (in decimal degrees) 35.29.0602 Longitude (decimal degrees) 80.10.2658 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Undeveloped area below Tuckertown Dam with existing improved gravel access drive adiacent to shoreline FORM: SSGP 09-2020 Page 2 of 6 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Proposed shoreline stabilization is needed to provide erosion protection for fishing area access drive that is near the existing dam. 7. Will work be conducted from land? ® From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 1000 SF Temporary impacts (temporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Existing vegetation and several trees will be removed by the proposed grading and stabilization project. 11. Signature By signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time 3 -do Owner g s si at e" [15A NCAC 02H .0502(f)1 Date Age 's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: FORM: SSGP 09-2020 Page 3 of 6 a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation FORM: SSGP 09-2020 Page 4 of 6 r La ke (At Full Pond/ Normal Wt Side Vievv 75 LL- lake lu rwiExisting Dock /30fi�llt Rip.p ;; : . EXAMPLE Plan View 3Pa150fl FORM: SSGP 09-2020 Page 5 of 6 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing 'if necessary Existing bank 10 ft. bank a height ESQ' �OQ Q Side Vi A IVI PLE FORM: SSGP 09-2020 Page 6 of 6 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Eagle Creek Renewable Energy, c/o Jeff Henley Tuckertown Lower Fishing Access Area STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 100 LF of proposed shoreline stabilization measures. Detail 3 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope =100'xVx2 = 200 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 100 LF of Shoreline = 5 ft. Above Normal Pool Area of Impact = Length x Height x Slope =(100'x5'x2) = 1000 sq. ft. Impact From Construction Above Shoreline Stabilization Assume 5 ft. Wide Zone Area of Impact = 100' x 5 ft. = 500 sq. ft. Total Area of Impact Above Normal Pool Level = 1500 sq. ft. �Bldg Inv. 522.31' 24RCP (SE) NO in base of tree ' _ Elevation: 534-71' Inv. 524.59 NAVD88 (r'w) r — 24- RCP (NPR) ._ NEW cuGuERT / MF �P - 75_�ua �T g �F PER)T�TiotV IL 3 T SITE MAP - ECRE TUCKERTOWN SCALE V=40' LOWER FISHING ACCESS AREA VEGETATION AND EROSION %T\ CONTROL FABRIC /X// EXISTING GRADE I � I CLASS 2 RIP RAP I Approx. 5 ft.. 1 t I 2 I EROSION CONTROL FABRIC----�' Assume 1 ft. _ LAKE BOTTOM TYPICAL CONDITIONS 36" TO 72" ERODED CUT WAVE EXPOSURE FOR: EAGLE CREEK RENEWABLE ENERGY LOCATION: 711 TUCKERTOWN ROAD BADIN LAKE RESERVOIR: PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: DETAIL MODERATE RIP RAP STABILIZATION 3 S T E WA R T March 11, 2024 REPORT — PHASE 1 SHORELINE EVALUATION Applicant — Jeff Henley Eagle Creek Renewable Energy 293 Hwy 740 Badin, NC 28009 Location - Tuckertown Lower Fishing Access Area Reservoir — Narrows, Badin Lake A shoreline evaluation of the subject property was completed on 2/27/2024. A copy of the field notes and shoreline map are attached to this report. A set of photographs of the shoreline taken during the site visit have been sent to Eagle Creek Renewable Energy for the permit file. The applicant has a need to Install shoreline stabilization on a section of shoreline approximately 75 to 100 feet in length that is adjacent to a gravel access road. The shoreline on the subject property has an existing slope that is approximately 6 fM in height above the lake at the at the location adjacent to an existing gravel access road. The section of shoreline has some existing trees and brush undergrowth. Some temporary rip rap stabilization has been placed on a small section of the eroded shoreline to protect the gravel access road for getting undermined. An old concrete slab was observed with some eroded undercut within the limits of the area to be stabilized. No lap trees were observed on the shoreline during the site visit. The shoreline appears to have significant exposure to erosion from dam discharge currents, wind driven waves and boat wakes. Recommendations for Stabilization Based on the site evaluation of the property, we recommend that maintenance access ramp and shoreline stabilization be completed as follows: 1. The existing temporary rip rap located on the shoreline should be removed and stockpiled for re -use prior to clearing and excavation for installation of any stabilization measures. STRONGER BY DESIGN 101 NORTH TRYON Sr. CHARLOTTE, NC T 704,334.7925 SUITE 1400 28202 F 704.334,7926 2. Most of the existing trees and undergrowth located on the S T E WA R T shoreline will be removed in order to Install the recommended stabilization measures. The concrete slab can be removed as needed to accommodate the shoreline stabilization measures. 3. Contractor shall carefully excavate and slope the shoreline to receive the non -woven filter fabric and rip rap. Grade the shoreline to provide a 2:1 face slope prior to Installing the fabric and stabilization. The fabric should be burled into the lakebed and Into the grade at the top of the slope above the rip rap. Install stabilization as indicated on the enclosed site map, and Detail 3 Moderate Rip Rap Stabilization (copy attached). 4. The contractor will be allowed to import suitable soil backfill to the site In order to build out the road shoulder and slope down to the lake prior to Installation of the stabilization measures. 5. Upon completion of the shoreline stabilization, the applicant will be required to revegetate the disturbed areas above the rip rap slope and adjacent to the ravel access road with Eagle Creek Renewable Energy approved ground cover plant materials and/or other approved stabilization measures. Attachments - Field Notes Site Plans Detail 3 STRONGER BY DESIGN 101 NORTH TRYON ST. CHARLOTTE, NC T 704.334.7925 SUITE 1400 28202 F 704.334.7926 YADKIN SHORELINE MANAGEMENT PROGRAM PHASE I - SITE EVALUATION DATE: 'L '7 .�: A. APPLICANT NAME: 'ECM Lot No.: '71 ( 1 uckzricti.rv, dower �,s�;� /�ueff B. LAKE: N avY o u; 5/�a�u.. Shoreline Length: TS +c 10D I,F pp C. LOCATION/ORIENTATION: lri ", -Cove: N/A -Open Water Exposure: V/Y_N -Point:_ IZ -Face Direction: _N �,S_E_W D. EXISTING VEGETATION: NffriS o6atrv4 r, Lit "Oro Lap Trees: _Y ✓N E. SHORELINE CONDITIONS: -Rock: (Zoc� e�ereGVLQ Undercut depth: fo Z�H -Ht. of eroded bank: 6 -Slope above bank: 01,1, 60fe F. CONSTRUCTION ACCESS: G. OTHER OBSERVATIONS: -Lake bottom slope: w�C�tcrv�, -Lake bottom material: �m ilmc— 1 Y,\ ! �Y 1 � ♦N -4z "4._ ikt , iv I 4e r� V bing maps 711 Tuckertown Rd, New London, NC 28127 Location: 35.4857933,-80,1751433 Y 1 1 ti 1 1\ \\1 1 1 711 Tuckertown Rd, New London, NC 28127 TUCKERTOWN ruOel�n Rd 500 � 200 m ® 2024 TOMTOM, ®Opan5be M