Loading...
HomeMy WebLinkAboutNCC241084_ESC Approval Submitted_20240410 BUR¢ C a ,c ) C. R � w ORc, )•• CAR° MECKLENBURG COUNTY Land Use & Environmental Services Agency Storm Water Services 3/21/2024 Email: chris@dnawolverine.com Cameron Helms PO Box 2758 Indian Trail,NC 28079 Re: COM-452284-Stevens Mill Storage Approval of Plan as noted Denuded Area:7.5 Acres Dear Sir/Madam: Please be advised that the above referenced plan has been approved by this Office for both Stormwater Management Permit and for Erosion Control. This approval is required prior to applying for the Construction Stormwater General Permit(NCG010000). As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage(COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the applicable annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form and fee details may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. This approval is also required prior to the initiation of land development activities and is good for 3 years from the approval date. Please contact Chanell Hatch(980-505-5775),Erosion Control Inspector to set up a pre-construction meeting after obtaining your Certificate of Coverage(COC)from NCDEQ.Refer to the attached Fact Sheet for additional information. Also,this letter serves as notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules. In addition,local,city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. The Planning Department of the Town of Matthews is being notified of this approval by copy of this letter. Plans that are stamped approved will be held within Accela's"approved package"for printing out as needed. Please always keep one set of stamped approved plans onsite. If you have any questions,please give me a call at 980-314-3240. Sincerely, 19k—I Jonathan Rett,PE Mecklenburg County Project Manager CC: Town of Matthews Planning Department—Rob Will Project Manager—Christopher Fleck—D&A Wolverine PLLC Water Quality Inspector—Chanell Hatch Land Development Inspector—Tom Tasselli PEOPLE • PRIDE • PROGRESS • PARTNERSHIPS • 2145 Suttle Avenue • Charlotte,North Carolina 28208-5237 • www.mecklenburgcountync.gov