Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
October 2, 2023 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes No
Is this project a public transportation project?*
Yes No
Change only If needed.
Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or
fuel, including natural gas, diesel, petroleum, or electricity?
Yes No
BIMS # Assigned Version# *
20240522 1
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Reviewing Office*
Raleigh Regional Office - (919) 791-4200
Information for Initial Review
1a. Name of project:
Mid Pines Townhomes
la. Who is the Primary Contact?*
Deborah Shirley
1b. Primary Contact Email:*
dshirley@sandec.com
Date Submitted
4/3/2024
Nearest Body of Water
Unnamed Tributary to Swift Creek (Yates Mill Pond)
Basin
Neuse
Water Classification
WS-III;NSW
Site Coordinates
Latitude:
35.7434
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Wake
Is this a NCDMS Project
Yes No
Longitude:
-78.6978
What amount is owed?*
$240.00
$323.00
Select Project Reviewer*
Kristina Morales: Kristina.Morales
1c. Primary Contact Phone:*
(919)846-5900
$570.00
$767.00
Is this project a public transportation project?*
Yes No
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
29 - Residential Developments
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application? *
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
ISLAMIC ASSOCIATION OF RALEIGH
2b. Deed book and page no.:
DB: 015810; DP: 00377
2c. Contact Person:
2d.Address
Street Address
3020 Ligon Street
Address Line 2
City
Raleigh
Postal / Zip Code
27607
401 Water Quality Certification - Express
Riparian Buffer Authorization
State / Province / Region
NC
Country
USA
Yes No
Yes No
2e. Telephone Number:
(919)291-6364
2g. Email Address:*
julie@blueheeldevelopment.com
3. Applicant Information (if different from owner)
3a. Name:
Julie Gavaghan
3b. Business Name:
Blue Heel Development, LLC
3c.Address
Street Address
2300 Rexwoods Dr.
Address Line 2
Suite 120
city
Raleigh
Postal / Zip Code
27607
3d. Telephone Number:
(919)291-6364
3f. Email Address:*
julie@blueheeldevelopment.com
4. Agent/Consultant (if applicable)
4a. Name:
Deborah Shirley
4b. Business Name:
Soil and Environmental Consultants, Inc.
4c.Address
Street Address
8412 Falls of Neuse Road
Address Line 2
Suite 104
city
Raleigh
Postal / Zip Code
27615
4d. Telephone Number:
(919)846-5900
4f. Email Address:*
dshirley@sandec.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
Raleigh, NC
2. Project Identification
2f. Fax Number:
State / Province / Region
NC
Country
USA
3e. Fax Number:
State / Province / Region
NC
Country
USA
4e. Fax Number:
2a. Property Identification Number: 2b. Property size:
0792050145 13.26
2c. Project Address
Street Address
2523 Mid Pines Road
Address Line 2
City
Raleigh
Postal / Zip Code
27606
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Unnamed Tributary to Swift Creek (Yates Mill Pond)
3b. Water Resources Classification of nearest receiving water:
WS-III;NSW
3c. What river basin(s) is your project located in?"
Neuse
3d. Please provide the 12-digit HUC in which the project is located.
030202011002
4. Project Description and History
State / Province / Region
NC
Country
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: *
Existing conditions consist of one parcel of land, partially wooded with some impervious areas (i.e. asphalt & concrete) and a 50' wide CP&L Co. overhead power line bisecting the
property. There are three streams (i.e. SA, SB, and SC), one wetland (W1) and one abandoned stormwater basin within the project boundaries. This property is bound by Mid Pines Road
to the west, rural residential to the north and northeast, and wooded land to the south and southwest. General land use in the vicinity consists of rural residential, and wooded land.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
Approximately 0.26 acres
4g. List the total estimated linear feet of all existing streams on the property:
Approximately 1,126 LF of stream
4h. Explain the purpose of the proposed project:"
The purpose of this project is to construct a residential development and its necessary infrastructure.
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
The overall project consists of a mulit-family residential development and the construction of roadway infrastructure, utilities, lots, mailbox kiosk and Stormwater Control Measures (SCM).
Specifically, there are stream and riparian buffer impacts associated with a road crossing, a culvert extension and buffer impacts associated with an SCM discharge. Equipment typically
used for construction and earthwork such as backhoes, bulldozers, excavators, graders, pavers etc. will be utilized for this project.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?"
Yes No Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2023-00577
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
AJ Kamal
Soil & Environmental Consultants, Inc.
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
USACE: JD request submitted on 3-13-2023, site visit with Lyle Phillips on 9-14-2023. No JD issued to date.
NCDWR: Neuse Buffer Determination completed on 3-24-2024 with Dorothy Robson on 3-31-2023 (NBRRO #23-097)
—preliminary/approved box checked so that this data box is activated, PJD/AJD not verified—
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
It is my understanding that there are no intended future phases beyond the property boundaries shown. Therefore, no additional NWP, Regional General Permits, or IP are anticipated.
D. Proposed Impacts Inventory O
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
3. Stream Impacts
3a. Reason for impact (?)
3b.lmpact type"
3c. Type of impact*
3d. S. name* ��3e.
Stream Type*
3f. Type of
3g. S. width
3h. Impact
❑
(?)
Jurisdiction*
length*
g1
Impact A: Culvert Extension-
Permanent
Culvert
A
Perennial
Both
40
Culvert
Average (feet)
(linear feet)
gy
Impact A: Culvert Extension-
Temporary
Other
A
Perennial
Both
6
22
Temporary Construction
Average (feet)
(linear feet)
Access
S3
Impact B: Road Crossing-
Permanent
Culvert
�13
Intermittent
Both
80
Culvert
Average (feel)
(linear feet)
S4
Impact B: Road Crossing-
Temporary
Other
B
Both
2
16
Temporary Construction
ff
Average (feet)
(linear feet)
Access
31. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts: 31. Total temporary stream impacts:
120 38
31. Total stream and ditch impacts:
158
3j. Comments:
Total permanent loss stream = 120 LF (0.009 acres); Total temporary stream = 38 LF (0.004 acres).
Temporary stream impacts will be brought back to pre -construction stream bed elevations and the stream banks will be stabilized.
6. Buffer Impacts (for DWR)
6a. Project is in which protect basin(s)?
Check all that apply.
Neuse Tar -Pamlico
Catawba Randleman
Goose Creek Jordan Lake
Other
6b. Impact Type
6c. Per or Temp
6d. Stream name
6e. Buffer mitigation required?
6f. Zone 1 impact
6g. Zone 2 impact
Impact A: Culvert Extension
P
A
No
2,747 1
1,286
Impact B: Road Crossing
P
B
No
4,707
2,677
6h. Total buffer impacts:
Zone 1 Zone 2
Total Temporary impacts: 0.00 0.00
Zone 1 Zone 2
Total Permanent impacts: 7,454.00 3,963.00
Zone 1 Zone 2
Total combined buffer impacts: 7,454.00 3,963.00
6i. Comments:
Impact C-Per 15A NCAC 02B .0714(9)(a)(i) - Deemed Allowable activity.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
S&EC completed a wetland & stream delineation and Neuse River Buffer evaluation for the entire property in order to identify natural resources so that
impacts could be avoided & minimized to the maximum extent practicable. Proposed impacts include one (1) road crossing, one (1) culvert extension
and one (1) Stormwater Control Measures (SCM) discharge outlet. Impact A is a proposed culvert extension. Proposed impacts include permanent (i.e.
culvert & headwalls), and temporary (i.e. construction access) stream impacts, and associated riparian buffer impacts. This culvert extension is being
required by the City of Raleigh for road widening. Stream and riparian buffer impacts have been minimized by utilizing head walls and wingwalls. Impact
B is proposed road crossing. Proposed impacts include permanent (i.e. culvert & headwalls) and temporary (i.e. construction access) stream impacts
and associated riparian buffer impacts. This road crossing is necessary to provide access to the southern portion of the property. Stream and riparian
buffer impacts have been minimized by crossing the stream and riparian buffers at a near perpendicular angle. Impact C is an SCM discharge through
the riparian buffer. Per 15A NCAC 02B .0714(9)(a)(i), this impact is a Deemed Allowable activity.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Per the project engineer: Coffer dams and a pump around will be utilized for the proposed stream crossing, and silt fence, sediment basins, energy
dissipators, etc. will be implemented.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Permanent loss stream impacts are less than 0.02 acres. Impacts have been avoided to the maximum extent practicable. Therefore, compensatory mitigation in the form of mitigation
payment has not been proposed.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
What type of SCM are you providing?
Level Spreader
Vegetated Conveyance (lower SHWT)
Wetland Swale (higher SHWT)
Other SCM that removes minimum 30 % nitrogen
Proposed project will not create concentrated stormwater flow through the buffer
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program?
Yes No
N/A - project disturbs < 1 acre
2d. Which of the following stormwater management program(s) apply:
Local Government State
Local Government Stormwater Programs
Phase II NSW USMP Water Supply
Please identify which local government stormwater program you are using.
City of Raleigh
Comments:
BMP proposed: Stormwaterwetland
G. Supplementary Information
1. Environmental Documentation
8
a
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality? *
Yes No
3b. If you answered "no," provide a short narrative description.
We have reviewed the "Draft Internal Policy, Cumulative impacts and the 401 Water Quality Certification and Isolated Wetlands Programs' document
prepared by the NC Division of Water Quality on April 10, 2004, version 2.1. The draft states that many private developments are unlikely to cause
cumulative impacts, including projects such as urban in -fill, most residential subdivisions and small commercial developments as well as agricultural and
silvicultural operations. The Mid Pines Townhomes project is a residential development. Additionally, the project is located within the City of Raleigh
jurisdiction, therefore the adjacent properties that have potential for development will have the following regulations to protect downstream waters: 1) the
Neuse River Basin Riparian Buffer Protection regulations, these regulations require limited development within the riparian buffer area, in addition Best
Management Practices may be required that control nitrogen if diffuse flow cannot be achieved; 2) the Phase II NPDES Stormwater Permit Program, this
program includes permitting requirements for Municipal Separate Storm Sewer Systems (MS4s) in addition to post -construction stormwater
management requirements; and 3) the Water Supply, Watershed Protection Program which limits development densities as well as requires protective
riparian buffers. We anticipate that the DWR will advise us if any additional information is needed.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project? *
Yes No N/A
4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a
treatment plant, list the capacity available at that plant.
non -discharge; City of Raleigh Treatment Facility
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts? *
Yes No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
Yes No
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
Unknown
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
S&EC completed a Threatened & Endangered Species Report, to include a Self -Certification letter through the US Fish & Wildlife Service (USFWS), a
query through the NC Natural Heritage Program database, and an official Species List through the iPac. A formal request was sent to the USFWS on
November 14, 2023. The USFWS has 30 days to respond from the date of the sent request. S&EC received no response from USFWS within the 30
days which in their interpretation means that they concur with the determinations made by S&EC. The S&EC determinations were that the proposed
project is not likely to adversely affect any federally -listed endangered or threatened species, their formally designated critical habitat, or species
currently proposed for listing under the Endangered Species Act (ESA). Please see attached S&EC Threatened & Endangered Species report.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? *
The NOAA Habitat Conservation/Habitat Protection: National Marine Fish Service; Essential Fish Habitat Mapper website was referenced. No Essential
Fish Habitat was identified near the project.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? "
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources? *
The NC State Historic Preservation Office HPOWEB GIS Service interactive map was referenced on March 6, 2024, no historic listings or study list
entries or determined eligible listings were identified within the property boundaries. Additionally, no structures exist within the property boundaries.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? *
Yes No
8c. What source(s) did you use to make the floodplain determination?*
NC Flood Risk Information System Floodplain Mapping Program and confirmation from the project engineer.
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
PCN Attachments_ Mid Pines Townhomes.pdf 16.95MB
File must be PDF or KMZ
Comments
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Deborah Shirley
Signature
0) �fi'tlnJ
Date
4/3/2024