HomeMy WebLinkAbout20151287 Ver 1_920003 Permit Stream and Wetland Package_20151211Hi�;hWay North Carolina Department of Transportation �
Stormw�ter M
,,,,,.,,�,,, Highway Stormwater Program �_�
STORMWATER MANAGEMENT PLAN
(Version 2.02; Released April 2015) FOR NCDOT PROJECTS
WBS Element: 17BP.5.R.56 TIP No.: County(ies): Warren Page 1 of 1
General Project Information
WBS Element: 17BP.5.R.56 TIP Number: Project Type: Brid e Replacement Date: 9/3/2015
NCDOT Contact: W. Galen Cail, PE Contractor / Designer: Brandon Barham, PE - Ecological Engineerin
Address: 1000 Birch Ridge Drive Address: 1151 SE Cary Parkway
Ralei h, NC 27610 Suite 101
Car , NC 27518
Phone: 919-707-6711 Phone: 919-557-0929
Email: cail@ncdot. ov Email: bbarham@ecolo icalen .com
Cit /Town: Ralei h Count (ies : Warren
River Basin(s): Tar-Pamlico CAMA Count ? No
Wetlands within Project Limits? Yes
Pro'ect Descri tion
Pro'ect Len th lin. miles or feet): 0.135 Miles Surroundin Land Use: Rural area with forest and agricultural landuses
Pro osed Pro'ect Existin Site
Pro'ect Built-U on Area ac. 0.60 ac. 0.40 ac.
Typical Cross Section Description: 2@ 12.0 ft lane with 4.9 ft shoulders and 1.1 ft guardrail with total bridge width of 36.0 ft 2@9.5 ft lane with 3 ft shoulders with total bridge width of 25.0 ft and total bridge
and total bridge length of 150.0 ft length of 120.5 ft.
Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 3500 Year: Existin : 3000 Year:
General Project Narrative: State Project 178P.S.R.56 involves the replacement of the existing NCDOT Bridge #920003 on SR 1001 over Fishing Creek. Bridge #920003 consists of 1@40.5', 1@40',
(Description of Minimization of Water 1@40' steel plank deck on steel I-beams with timber piles, caps, and abutments. The proposed bridge at #920003 will be 1@90', 1@60'; 33" Box Beam with 4'-0" caps and
Quality Impacts) sloping abutments. The proposed bridge is located in Zone AE of FIRM Map number 3720294400J and was studied by "Limited Detailed" methods. The proposed bridge will
provide more hydraulic opening than the exising bridge. No Deck drains are proposed. One stormwater outfall is proposed which will be placed at a distance to minimize
disturbance to adjacent wetlands. Rip Rap pads will be utilized to dissipate the energy.
Waterbod Information
Surface Water Body (1): Fishing Creek NCDWR Stream Index No.: 28-79-(1)
NCDWR Surface Water Classification for Water Body Primary Classification: Class C
Su iemental Classification: Nutrient Sensitive Waters (NSW)
Other Stream Ciassification: None
Impairments: None
A uatic T&E S ecies? No Comments:
NRTR Stream ID: Buffer Rules in Effect: Tar-Pamlico
Project Includes Bridge S anning Water Bod ? Yes Deck Drains Discharge Over Buffer? No Dissi ator Pads Provided in Buffer? No
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
6
6
\
�
9
�
�
�
•�
�
V
�
�
O
V
OFFSITE DETOUR ROUTE
See Sheet 9-A For Index of Sheets
See Sheet 1-B For Conventional Symbols
� J1 � l 1�A `\! � ��� J1 � �/��' �1����d11
�������� �� ��`�J�'��d11 JS �
WARREI� CO U1�lTY
LOCATION: BRIDGE N0.3 OVER FISHI11lG CREEK 0111
SR 1001 (MARTIN LUTHER KI11tG BLVD.)
TYPE OF WORK GRADING, DRAINAGE, PAVING, AND STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
BEGIN STATE PROJECT 17BP5.R.56
—L— POT STA 12t35.00
CLEARING ON THIS PROJECT SHALL BE TO LIMITS ESTABLISHED USING METHOD III.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
PERMIT DRAWING
SHEET OF
tPSRS6
laRELIMINARY ]PLt�N�
DO NOT USE FOR (:ONSTRUCTION
=�
'�.
S T EWART
�__:.,.. i s�isEc�vr�kw�ws�ieioi
wry, nc z�;�e
��i�l,szo��9
� ECOLOGICAL
- ' ENGINEERING
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH �eQ6Yed �" `h` �'�" f FI1'DRAULICS ENGINEER
STEWART
LENGTH ROADWAY STATE PROJECT 176P.5.R.56 = 0.106 mi. F��
5Q 25 Q 50 ��0 ADT = 3500 NORTH CAROLINA �� �����
DEPARTMENT OF TRANSPORTATION
- LENGTH STRUCTURES STATE PROJECT 17BP.5.R.56 = 0.029 mi. 4� �°�q
r r � DHV = WA zmz srn:vnnen srEciFrcar�ous �e �
PLANS p= ryq TOTAL LENGTH STATE PROJECT 17BP.5.R.56 = 0.135 mi. P.E. � ��
ANDY YOUNG, PE srcxArunF: �
50 25 0 50 100 T= wA * RIGHT OF WAY DATE: rno�scz ENcrn�EEn � g
ROADWAY DESIGN ElYGINEER � �
�k (TfST N/A + DUAL WA) JUNE 7. 2015 MICHAEL BURNS. EI �� �
PROFILE (HORIZONTAL) V— 55 MPH vko�Ecz nesrcx E,vc�xesx ��� ���
l0 5 0 l0 Zp CLASS = MAJOR LETTIIVG DATE: LISA GILCHRIST EI �� 8�����
COLLECTOR
M A RC H 15, 20 16 xcnoz coxr ncr
PROFILE (VERTICAL) REGIONAL TIER P•E
SIGNATURE:
SI I �
L '" �
DETAII 2 DETAIL 1
CUT DITCH SPECIAL CUT DITCH
( N t ta Scalel I N � m Smle)
��i a�� � on�ti o on�n
G�ound 7l F\o\te' Slape Na�ural � p� Slope
d D Ground ?.� p F\o��e�
Min. D=1.5 Ft.
Geo�ex��ie Min. D=i Ff.
Type ofLiner� CLASS B Ri�Rap Mor.d=1 Fi_
FROM STA. 13+00 TO STA. 14+30 L RT
FROM STA. 17+10 TO STA. 19+50 -L- LT
DETAIL 3
BANK STABILIZATION
�No��o s<oie�
3,0'min
l.0'
r�ws
�
GEOTE%TILE
Type ol Lincr-� CIA55 II RIPRAP
FROM STA 15+68 TO STA 16+10 –L-
SITE I
rur�� �., �,.: ';
I�A 12+35.OQ'� ��-<,�� s rRu�r� .�s:
'-�JODS
�
��P _
O-iAYW00���
-: MCDOUGLE .
_.. .
� : �:,. � ��lr�+__ .
� F
�P_
. . � . . — — --- _ —
� ----- SR I001- 24B"
.. �R. MAR(lN i i r . . �
.. _. .. .. .. " �
_ _' " " � �.—�
1
1
;
\s �
� � � � �-
v
35
�M1'
�r
� BEGIN �� �\ \ \er\
SBG i 55
" " " " ' " " " " " " " _ _ _ _ . _ _ " ' . " _ "
15" kCP-1V�' ".� , �' T �'
&7$'RT SPECIAL CUT DITCH
SEE DETAIL 1
F / ��l S' V.k
� � �LBOW��e
C BEGINJ le
SBG - 65
R
CL4S5 B RIP RAP CLA55 RIP
EST 3 TONS 5T 1 TO
EST 10 SY . ST 5 SV
GEOTE%TILE GEOTEXTIL
O
\
DETAIL SHOW/NG PAVEMENT—BRIDGE RELATIONSH/P (NTS)
SITE 2
PERMIT DRAWING
SHEET _ OF _
50' 0' 100'
GRAPHIC SCALE
PROJECT REFERENCE NO. SHEEf NO.
l7BP.5.R.56 4
'.OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
FE3E]LIMIN.9�RY PLANS
DO NOT VSL FO CONSTIIVCTION
� �sEtv 9i��iW'o'9z.9����
IJ I E VV�, :( � I �NG�INOEEIRING
��z.5� �� z25� �
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
INSET GRAPHIC SCALE
•,� •� *� • DENOTES MECHANIZED
• • � • CLEARING
"""--- DENOTES PERMANENT
� � ���_+ P STREAM IMPACT
- � S I T E 2 ``----
0 0
3
CLASS B RIP RAP
�EST 3 TONS
�n\ EST 10 SY GEOTEXTILE
/ /C \
/ � � _ I
� �
���T7'N�hr��,-r ti,-r'�iLL1111 i� � .
�'
S.R. 1001 (DR. KING BLVDJ i
� --_ � — � --�—
�� R
m
+75
� a�s� Rr
�BANK STABALIZATION
SEE DETAIL 3
CLASS II RIP RAP
E57 70 TONS
E5T 80 SY GEOTEXTILE
\
CUT DITCH
SEE DETAIL 2 ��OT SfO. 2f �
+50
EX157 R/W
&�a �r � STATE
sP5R56
, �. �� � 19t50.00
—y--� � _ E%ISiING R/�^�,
1\ \
�
'— SR I00/– 24'BST ----
N�r'," _i a„ �.. :
I 15`.
� J
TEMPORARY CAUSEWAY
SEE DETAI� 4
DETAIL 4
TEMPORARY CAUSEWAY
(NOT TO SCALE�
MIN ELEV=248.3'
� CLA55 B RIP RAP
1, �
NG "` � i
NG
GEOTE%TILE CLASS II RIP RAP
FOR —L— PROFILE,SEE SHEET 5
SEE S—ITHRU S-2/FOR STRUCTURE PLANS
N
o �
N �
�
SI I �
L '" �
�_-�IIV JI HI L 1�,rvJLi.t�
�, -�- r s
�. �
DETAII 2 DETAIL 1
CUT DITCH SPECIAL CUT DITCH
( N t ta Scalel I N � m Smle)
��i a�� � on�ti o on�n
G�ound 7l F\o\te' Slape Na�ural � p� Slope
d D Ground ?.� p F\o��e�
Min. D=1.5 Ft.
Geo�ex��ie Min. D=i Ff.
Type ofLiner� CLASS B Ri�Rap Mor.d=1 Fi_
FROM STA. 13+00 TO STA. 14+30 L RT
FROM STA. 17+10 TO STA. 19+50 -L- LT
DETAIL 3
BANK STABILIZATION
�No��o s<oie�
3,0'min
l.0'
r�ws
�
GEOTE%TILE
Type ol Lincr-� CIA55 II RIPRAP
FROM STA 15+68 TO STA 16+10 -L-
SITE I
___ BLAND B PRUITT JR - ...
��1� � E.�/� \.
� � &�a cr `�
�_ � � � _ ..�
µAYW�� BEGIN �
�q�y �p R SBG i 5�
MC_DOL1G�� =sz� ' �
_ � :� ++
— -- ---�—_ f� 2 : � r *
— � _ �� � �
3,_ -- �
- sa ioo� za es- -��
. OR.MAHCIb'-tt1TFER ,' . " _ _ ' " " _ _ ' ' " _ _ ' _ _ _ ' ' 15" RCP.IV�
ii � � � xr r
�--� -� /REGIN—
�; � SBG=66
�.� � ��— £k��77/w �
-- SPECIAL CUT-DITCH CLASS e RIP RAP •
/ � -- &75'RT esr 3 TONs ' ',
-_-�/ / / � SEE DETAI� i EST 10 SY �
/
.. ✓ GEi37�X71LE .
�''�� �� ___-_..�_ — _.�� _. .. -- _�� — - _. � � .... �\
" ,� 09��— �� �z. �J
_-
.'_ � — - __ __ - __.
, ____ __
__—
-- __ _ ___ _ c.,
�
DETAIL SHOW/NG PAVEMENT—BRIDGE RELATIONSH/P (NTS)
S�TE 2
PERMIT DRAWING
SHEET _ OF _
50' 0' 100'
GRAPHIC SCALE
PROJECT REFERENCE NO. SHEEf NO.
l7BP.5.R.56 4
'.OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
FE3E]LIMIN.9�RY PLANS
DO NOT VSL FO CONSTIIVCTION
� �sEtv 9i��iW'o'9z.9����
IJ I E VV�, :( � I �NG�INOEEIRING
��z.5� �� z25� �
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
INSET GRAPHIC SCALE
•,� •� *� • DENOTES MECHANIZED
• • � • CLEARING
"""--- DENOTES PERMANENT
� ���_+ P STREAM IMPACT
- SITE 2 `--
�� -___ , � ,
�
� l �P �, ,,�� � O ;,,_ ,--
�- / ' O
, �
, �, � �i � � 3 ' �'�
� ��� � , ,
/ MON � � �
�-� � —� �� � ,
. - � � - / ; � � i / � ;
: i
� \ /o� ,/�//� - seE o�ai z OT �Sfi4. 2/-�3 .�
� /
l � � ' � � _ W _ "f.JO � i /�
�x� &ia �r EN,U �ATCq��y.�
\ � � � CLA55 B RIP� RAP - �BP R..]O / ;
E5T 3 TONS � S�A �Q�/-50A)/1
& R EST 10 SV GEOTEXTILE � % %���� /
� �\. A � � ti �W / � � _ _ —�, (�1 _ � xsrirv eiw ��. .
�'„, m ' — �1'�, _—_
.0
� �
•.. � F �� � ` _� —
� � � � �,.>> , � � ��,� � �
.., , ,,, ' — _� � u —� . � r . �, � � �� � -�
. � �
—
� ��—T
e �6 ?in _ _ _ _ _ _S.R._1001_(DR._KIN� BLVD.)_ _ _ _ _ _ sRv$oi- aesr I
�i
'� r"''"' i'IyA' •'AIPR7yf/ LUi R KlA(G JR.Bl�VO. a. . �
CLA55 RIP
�si i ro
ST 5 SV
` \ .\ JS
�, ��\� � \
�
�
&75' RT
`�ANK STABALIZATI�QN � O � \ �`�
SEE DETAIL 3 \� �
CL'ASS� II RIP RAP �. ,\ � \ �
ES'Y 70 TONS ' ��
� ES�i AO SY GiOTE%TILE , � \ \ \
� ���,��� ���� ��� � �� ��'��
\ \ '\
� � � �\ ��
TEMPORARY CAUSEWAY
SEE DETAI� 4
--�no�s -- — = �
DETAIL 4
TEMPORARY CAUSEWAY
(NOT TO SCALE�
MIN ELEV=248.3'
� CLA55 B RIP RAP
1, �
NG "` � i
NG
GEOTE%TILE CLASS II RIP RAP
FOR —L— PROFILE,SEE SHEET 5
SEE S—ITHRU S-2/FOR STRUCTURE PLANS
z
0
.1
r
'
�
290
280
270
260
250 .
240
230
220
21� .
200
BRlD6E HYDRAULIC DATA
DESIGN DISCHARGE = 6600 CFS
DESIGN FREQUENCY = 50 YR
DESIGN HW ELEVATION = 258A fT
BASE 0/SCHARGE = 85/0 CFS
BASE FREQUENCY = l00 YR
BASE HW ELEVATION = 259.80 FT
OVERTOPPING DISCHARGE = 8920 CFS
OVERTOPPING FREQUENCY= 100+ YR
OVERTOPPING ELEVATION = 260.5 FT
PROIECT REFERENCE NO. SHEET NO.
l7BP.5.R.56 5
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
� : ... ... ��. �= � li: ..: : � "r'.'.
�, � i i �.-- FRE]LIMIN RY PLANS
.. .... �. I Iu. i. i.__ I I L pp NOT VSL FO CONSTIIVCTION
I. . . . ..1._ , u li.. . . � �: .
;.:. ; � ; � � �:
, _ _., � , ,
� �... , _T .� ,
— -- . . ;—..
�� � I' � � �
. 1 � � . . . ..i �J ... .- � 4! l...l . i. _' 1 .
�
.. ��I � si:i .._ .
�� � � � � ��.o
� � `"' �ECOLOGICAL
S T E Vu`; ���ENGINEFRING
� �
_ _ _ __
DATE OF SURVEY = 07/07/20/4 -
, ,I, ,,
WS. ELEVATION �'i � �
AT DATE OF SURVEY = 245.3 FT — ,f �, _ 'I 'I
_ � ,_
� �I�
— II� —
� , �, � �
--� — � - — — "� �_ — , � � � � �
_, �
�— -- --- , ,
� �� � �� � �
�
� _ -•— - '
� -- — -- — — -- — f END GRADE
Pl = 13+50A0 � . —L— STA 19+50.00
EL = 260.43' '
� �
VC = l00' — — —� - : , --, . EL 2763/ � �
� r ��_
K = /24
BEGIN GRADE '� END BRIDGE
—L— STA 12+35A0 ! BEGIN BRIDGE —L— STA /6t36.23 Pl = 16+60A0 �
EL260.77 � i —L— STA 14t83.77 � VC = 520'� �
� � . �'� — -- K = //7
�
_ �,,
_ __ _ �
�
— � . � � � �
---------- -- - —�+���aoo� ---- -- � �' � �
— r- .�000i r+�o �� , ' �� � ,
� —
- - - �-i o.sasi - - - �' � �� -
EL=24 .3',
___ "_ �_ r ; �
— -- -- --- - � ---- -
�
i'ii �ii
�i _
I � I �' � y �. i i
�
m rr
,
1 ,�� -
I T i
. . . - O . . _ ..
� �
,rw �i i li i i i i i i
' o m i
� . �� �, ��� � . . i i � �
�
. ... .. .... . . N f � ��,.i i i ,.i,, �,i��: i
N
`�' r i
_ � � i
II Ill�i . II r � .
i i
Q . ,_� � � �
Q � � � � ��� �� �
� ��
J..I . J � �� .... ...... ...... ...... ...... .... ... �i �i i �i �
,
t� �W � i TEMPORARY �
BM* l N=958794' E=2240774' i CAUSEWAY
RR SPlK6E �� ld' SYCAMORE I i� BM" 2 N=959823' E=2240986' , ,', ,',
_ _ I � ELEV.=267.30,
i
i RR SPIKE lN 34" OAK i� i �:� i
, �� �
. WS ftEV = 245.3'--� �.
. . DATE OFSURVEY ... ........................ ..
- . _ . . . . . . . _ . . . . . -. . . . . . . 07N72014 ��=-� � .�� �.._ .- .
-_ - - _ -. _ - _ _ __,. _ -. .
.. .. .ii i � . ,, �,.
-- -
.
� �
� �
�� ,
, - _
_ � � � � � � � -� ,- —�- ,-� �
�� � � - ,
� � � � � � �,� ,,, � , ; � ; _
FOR —L— PLAN VIEW,SEE SNEET 4
, , —
� � �
' — — — — — — — — -- ' =— �
10 11 12 13 14 15 16 17 18 19 20 21
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 14+16/14+75 -L- LT 1@90', 1@60', 33" 0.02
BOX BEAM
2 15+55/16+03 -L- LT 1@90', 1@60', 33" 0.01 < 0.01 0.03 70 70
BOX BEAM
TOTALS: 0.03 < 0.01 0.03 70.00 70.00
Mechanized Temporary Fill
Temp. Surface In Wetlands Surface Water
Water Clearing in Due to EC Impact
Wetlands
Impacts: �sa. Ft> (Sq. Ft) DeviceFt) (Sq. (Sq. Ft)
Site 1 0 1000 0 0
Site 2 1324 463 0 244
Total 1324 1462 0 244
Revisetl 3/31/05