HomeMy WebLinkAbout20151215 Ver 1_Email_20151210Carpenter,Kristi
From: Alsmeyer, Eric C SAW <Eric.C.Alsmeyer@usace.army.mil>
Sent: Friday, December 11, 2015 10:03 AM
To: Murray, Christopher A; Ridings, Rob; Carpenter,Kristi
Cc: erin.thompson@kimley-horn.com; Kneis, Michael J
Subject: RE: NCDOT Division 5 permit application for widening of SR 1838/SR 2220 from US 501
in Orange County to SR 1116 in Durham County (TIP No.: EB-4707 A& B; WBS:
38664.1.1)
Follow Up Flag: Follow up
Flag Status: Flagged
Chris: As we discussed today, I would like to visit the project to look at the impact sites and confirm the JD areas, since it
has been more than 5 years since my site visit.
The best date for me the week of 21 December is Mon., 21 December, in the afternoon. I could meet you and Kimley-
Horn wherever you choose at 1 PM. If that date is a problem for Kimley-Horn, I could try to re-arrange some
appointments I have on Tues, 22 December, and fit it in then.
I apologize for the delay in contacting you about this.
Please reply or call if you have any questions or if I may serve you in any other way.
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0.
Thank you,
�M�
Eric Alsmeyer
Project Manager
Raleigh Regulatory Field Office
US Army Corps of Engineers, Wilmington District
3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587
Tel: (919) 554-4884, x23
Fax: (919) 562-0421
Regulatory Homepage: http://www.saw.usace.army.mil/Missions/Re�ulatoryPermitPro�ram.aspx
(If you need information that is not yet available on our new website, please let me know)
�
From: Murray, Christopher A [mailto:cmurray@ncdot.gov]
Sent: Monday, November 23, 2015 9:23 AM
To: Alsmeyer, Eric C SAW <Eric.C.Alsmeyer@usace.army.mil>; Ridings, Rob <rob.ridings@ncdenr.gov>; Carpenter,Kristi
<kristilynn.carpenter@ncdenr.gov>
Cc: erin.thompson@kimley-horn.com; Kneis, Michael J<mkneis@ncdot.gov>
Subject: [EXTERNAL] NCDOT Division 5 permit application for widening of SR 1838/SR 2220 from US 501 in Orange
County to SR 1116 in Durham County (TIP No.: EB-4707 A& B; WBS: 38664.1.1)
Eric and Rob,
NCDOT Division S proposes to widen SR 1838/SR 2220 from US 501 in Orange County to SR 1116 in Durham County. The
following information is attached as part of this permit application:
-EB-4707AB Signed and scanned copy of PCN form
-EB-4707 In-lieu fee mitigation acceptance letter
-EB-47078 FINAL Buffer Determination Request
-EB-4707 FINAL PreJD Request and NCWAM form
-EB-4707 FINAL Permit Drawing Package
Please contact me if you need additional information.
Thanks,
Chris Murray
Christopher A. Murray, PWS
Division Environmental Supervisor
Division 5
(919) 220-4633 office
cmurray@ncdot.gov
NCDOT-Division 5
2612 N. Duke Street
Courier: 17-27-03
Durham, NC 27704
�;.
�e:i*y .�W'*'R��"!fl�� �4f*`,i '�'�%' ��4VW�
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.