Loading...
HomeMy WebLinkAbout20052116 Ver 2_More Info Letter_20170227K; Ira. Water Resources Environmental Quality February 27, 2017 BOMA North Carolina LLC Attn: Kory Reimann 1668 Ridge Point DR Bountiful, UT 84010-1054 Subject: REQUEST FOR ADDITIONAL INFORMATION Caleb's Creek Development Dear Mr. Reimann: ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director DWR # 2005-2116 v2 Forsyth County On January 26, 2017, the Division of Water Resources — Water Quality Programs (Division) received your application dated January 4, 2017, requesting a 401 Water Quality Certification from the Division for your project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. Please provide the Division a copy of your response to the February 24, 2017 letter from the US Army Corps of Engineers requesting additional information. [15A NCAC 02H .0502(c)] 2. Please submit your site plans on full plan sheets at a scale of no smaller than 1"=50' with topographic contours shown. In addition, please provide an electronic copy to sue.homewood@ncdenr.gov. If this project is to be proposed in phases you may provide detailed site plans for Phase 1 and conceptual site plans for future phases. [15A NCAC 02H .0502(b)] 3. Please enumerate all wetland and stream impacts including fill slopes/dissipater pads/other impacts on the site plan and clearly label impacts (Wetland/Stream Impact 1, etc.). The Division recommends highlighting by hatching or shading all impacts areas for temporary impact areas and permanent impact areas. [15A NCAC 02H .0502(g)] 4. Please provide a detailed engineering plan, profile view, and cross-section of all proposed culverts. These drawings must include details regarding stream alignment in relation to pipe alignment, pipe slope, pipe burial, and dissipater pad. [15A NCAC 02H .0502(b)] State of North Carolina I Environmental Quality 450 W. Hanes Mill Road, Suite 300, Winston-Salem, North Carolina 27105 Phone: 336-776-98001 FAX: 336-776-9797 BOMA North Carolina LLC DWR# 2005-2116 v2 Request for Additional Information Page 2 of 4 Please clarify whether the Division of Energy, Mineral and Land Resources will require riprap within any stream channels or wetlands as part of the Erosion & Sedimentation Control Plan or Dam Safety plan approval. If riprap is required, please enumerate and clearly label the temporary and permanent impacts on the site plan and submit a channel restoration detail for any temporary impacts. Riprap must be located below the stream bed elevation. [15A NCAC 02H .0506(f) 6. Per conditions of the General Certifications "all culverts must be placed below the elevation of the stream bed by one foot for all culverts with a diameter greater than 48 inches and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches." Please revise your plans to meet this Condition or request an exemption from this Condition and provide justification for the exemption request. [15A NCAC 02H .0506(b)(2) and .0502(b)] 7. Per conditions of the General Certifications, all work must be done "in the dry". Therefore, dewatering methods will be necessary to temporarily dewater the stream channel during pipe installation. Please provide a construction sequence that details the method of dewatering to be utilized at the site and the sequence of construction events to be followed to ensure compliance with this condition. In addition, please ensure that the location of the temporary impacts are shown on the construction drawings and clearly indicated in the revised impact table. [15A NCAC 02H .0502(b)(3)] 8. Please provide a plan sheet that indicates the location of proposed stormwater measures for this project. If this project is to be proposed in phases, please provide a stormwater management plan approval for Phase 1 that includes information regarding stormwater treatment for all roadways as well as residential/commercial built upon area. [15A NCAC 02H .0506(b)(5) and (c)(5)] Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending one copy of all of the above requested information to my attention at the address below. Please be aware that you have no authorization under the Water Quality Certification Rules for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. BOMA North Carolina LLC DWR# 2005-2116 v2 Request for Additional Information Page 3 of 4 Please contact me at 336-776-9693 or Sue. Homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Sue Homewood Winston-Salem Regional Office cc: Perry Isner, Wetlands & Waters Inc (via email) Jean Gibby, USACE Raleigh Regulatory Field Office (via email) DWR WSRO 401 files DWR 401 & Buffer Permitting Unit BOMA North Carolina LLC DWR# 2005-2116 Q Request for Additional Information Page 4 of 4