HomeMy WebLinkAbout20231675 Ver 1_Revised PCN_20240329PCN revision March 29, 2024
UT Three Top Creek, Ashe County, NC
Lead Federal Agent: Laura Fogo, Asheville Ecological Services Field Office, USFWS
D. Proposed Impacts Inventory
Impacts Summary
❑ Wetlands ❑x Streams - tributaries
la. Where are the impacts associated with your project ❑ Buffers ❑ Open Waters
(check all that apply):
❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, complete this table for each wetland area impacted.
2a.
Site #*
2a1.
Impact
Reason/Type*
2b.
Impact
Duration*
2c.
Wetland Type*
2d.
Wetland Name*
2e.
Forested
?*
A
Jurisdiction
Type*
2g.
Impact Area
(ac)*
W1
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W2
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W3
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W4
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W5
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W6
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W7
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W8
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W9
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W10
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W11
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W12
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W13
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W14
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W15
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
2g1. Total temporary wetland impacts
0. ac
2g2. Total permanent wetland impacts
0 ac
2g3. Total wetland impacts
0 ac
Page 1 of 4 PCN Form Version 4.3- April 20, 2022
2h. Type(s) of material being discharged and the amount of each type in cubic yards:
Click to enter text.
2i. Comments:
N/A
3. Stream Impacts
If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site,
complete this table for all stream/ tributary sites impacted.
** All Perennial or Intermittent streams must be verified by DWR or delegated local government
Site #*
3a
Impact
Reason*
3b.
Impact
Duration*
3c.
Impact Type*
3d.
Stream Name*
3e.
Stream
Type*
3f.
Jurisdiction
Type*
3g.
Stream Width
(avg ft) *
3h.
Impact length
(linear ft)
S1
Voluntary
Restoration/
Enhancement
Permanent
Restoration/
Enhancement
UT Three Top
Creek
Perennial
Both
25
1,975
S2
S3
S3
S4
S5
S6
S7
S8
S9
S10
S11
S12
S13
S14
S15
S16
S17
S18
S19
S20
Page 2 of 4 PCN Form Version 4.3- April 20, 2022
3i1. Total jurisdictional ditch
0
impact:
3i2. Total permanent stream
1,975 linear ft
impacts:
32. Total temporary stream
0 linear ft
impacts:
34. Total stream and ditch
0 linear ft
impacts:
3J. Comments:
- Final permanent impact numbers are adjusted in the impact table.
-There will be no temporary impacts (temporary diversion) outside the restoration
permanent impact length.
-Access to the stream on the north and south ends are only allowed within the
existing prior filled areas from the past. The access roads will not be expanded.
Wetland areas will be flagged "Do Not Enter" and be understood with the
contractor upfront. There will be no impacts to wetlands outside of the footprint of
the existing access roads. Mud mats will be used, and silt fencing along each side
of the access road on the north side. Mud mats will also be used on the south side
access.
-Update: There will be only one stockpile area located in uplands on TNC property
in a graveled area near the powerline off William T. Calloway Road.
I apologize for impact number confusion double counting enhancement. There are
various interpretations of restoration and enhancement. I wanted to be sure I
included it all and learned later I over counted. Also, the other numbers are
specifics for contractors and are not total impacts. The permanent impact
numbers are the totals given in the table above. I agreed to be the permitting
applicant because the costs for this task were not in our partner budget. The
design plans I sent you are true and confirmed on the ground as of our onsite
meeting on March 28, 2024. We do not have funding available to replace the
contractor impact table with the permit impact table in the January 2024 plans.
The remaining funding is needed for restoration. Please use the permit impact
table in this PCN above and below. The plans have been revised several times
since 2020 as this project grew to try to stabilize the historically mined and altered
stream system to re-establish stability in the stream banks and riparian buffers to
help prevent sedimentation and erosion to improve water quality, protect the
wetlands, and to benefit the aquatic resources and the landowners.
UT Three Top Creek PCN permanent impacts
table final update:
Restoration/Enhancement 1 1,975
Page 3 of 4 PCN Form Version 4.3- April 20, 2022
H. Miscellaneous
Comments:
None.
I. Signature *
® By checking the box and signing below, I, as the project proponent, certify to the following:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete,
to the best of my knowledge and belief.
• The project proponent hereby requests that the certifying authority review and take action on this CWA
401 certification request within the applicable reasonable period of time.
• The project proponent hereby agrees that submission of this PCN form is a "transaction" subject to
Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act").
• The project proponent hereby agrees to conduct this transaction by electronic means pursuant to Chapter
66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act").
• The project proponent hereby understands that an electronic signature has the same legal effect and can
be enforced in the same way as a written signature; AND
• As the project proponent, I intend to electronically sign and submit the PCN/online form.
Full Name: *Laura Fogo, USFWS
Asheville Ecological Services
Field Office
Signature: * LWRAnte'fD URtally A signed by
RA FOGO
FOGO 111 31 20 0-0409
Date: *March 29, 2024
Page 4 of 4 PCN Form Version 4.3- April 20, 2022