HomeMy WebLinkAbout20231675 Ver 1_Revised PCN_20240311PCN revision March 11, 2024
UT Three Top Creek, Ashe County, NC
Lead Federal Agent: Laura Fogo, USFWS
D. Proposed Impacts Inventory
Impacts Summary
❑ Wetlands ❑x Streams - tributaries
la. Where are the impacts associated with your project ❑ Buffers ❑ Open Waters
(check all that apply):
❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, complete this table for each wetland area impacted.
2a.
Site #*
2a1.
Impact
Reason/Type*
2b.
Impact
Duration*
2c.
Wetland Type*
2d.
Wetland Name*
2e.
Forested
?*
A
Jurisdiction
Type*
2g.
Impact Area
(ac)*
W1
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W2
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W3
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W4
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W5
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W6
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W7
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W8
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W9
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W10
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W11
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W12
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W13
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W14
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
W15
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
2g1. Total temporary wetland impacts
0. ac
2g2. Total permanent wetland impacts
0 ac
2g3. Total wetland impacts
0 ac
Page 1 of 4 PCN Form Version 4.3- April 20, 2022
2h. Type(s) of material being discharged and the amount of each type in cubic yards:
Click to enter text.
2i. Comments:
Click to enter text.
3. Stream Impacts
If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site,
complete this table for all stream/ tributary sites impacted.
** All Perennial or Intermittent streams must be verified by DWR or delegated local government
Site #*
3a
Impact
Reason*
3b.
Impact
Duration*
3c.
Impact Type*
3d.
Stream Name*
3e.
Stream
Type*
3f.
Jurisdiction
Type*
3g.
Stream Width
(avg ft) *
3h.
Impact length
(linear ft)
S1
Restoration
Permanent
Restoration/
Enhancement
UT Three Top
Creek
Perennial
Both
25
636
S2
Enhancement
Permanent
Enhancement
UT Three Top
Creek
Perennial
Both
25
765
S3
Streambank
grading and
Permanent
Bank
Stabilization
UT Three Top
Creek
Perennial
Both
25
2138
S3
S4
S5
S6
S7
S8
S9
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S10
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S11
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S12
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S13
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S14
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S15
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S16
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S17
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S18
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S19
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
S20
Click to enter
Temp/ Perm
Choose one
Click to enter
Per/Int
Choose one
Click to enter
Click to enter
3i1. Total jurisdictional ditch
impact:
0
Page 2 of 4 PCN Form Version 4.3- April 20, 2022
3i2. Total permanent stream
3,539 linear ft
impacts:
3i3. Total temporary stream
0 linear ft
impacts:
34. Total stream and ditch
0 linear ft
impacts:
3j. Comments:
-The permanent impact numbers are adjusted.
-There will be no temporary impacts (temporary diversion) outside the restoration permanent impact length.
-Access to the stream on the north and south ends are only allowed within the existing filled area from the past. The
access roads will not be expanded. Wetland areas will be flagged "Do Not Enter" and be understood with the contractor
upfront. There will be no impacts to wetlands outside of the footprint of the existing access roads. Mud mats will be used,
and silt fencing along each side of the access road on the north side. Mud mats will also be used on the south side
access.
-Please find the attached map for the alternative lower stockpile area to be moved uphill in red.
UT Three Top Creek revised stockpile in red polygon
•
— ;,
,� _ .fie. s-- _
1
N,
.e
March 11, 2024 1:1,017
0 0.0075 0.015 0.D3 rri
Hoteis '��j airport paint — Secondary Roads/Drives — Main River & Creeks i 1. . , I
P� County Boundary — River Points Parcels 0 0.0125 0025 0.05wn
L�
sees. EST, FERE, Gemiin, IJSM. Inb-1. INCREMENT P, WC—
Esd Ap.R MER, E CW. E' K.—. E - CM.1.,d).
• Address Points — Roads e-=
Page 3 of 4 PCN Form Version 4.3- April 20, 2022
H. Miscellaneous
Comments:
Click to enter.
I. Signature *
❑ By checking the box and signing below, I, as the project proponent, certify to the following:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete, to
the best of my knowledge and belief;
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time;
• The project proponent hereby agrees that submission of this PCN form is a "transaction" subject to Chapter
66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act');
• The project proponent hereby agrees to conduct this transaction by electronic means pursuant to Chapter 66,
Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act');
• The project proponent hereby understands that an electronic signature has the same legal effect and can be
enforced in the same way as a written signature; AND
• As the project proponent, I intend to electronically sign and submit the PCN/online form.
Full Name: * Laura Fogo,
USFWS
Signature: * GO
LAA�ic o�n eOGO Datea202 03.11b18:45:45- �oo
Date: * March 11, 2024