No preview available
HomeMy WebLinkAbout20240489 Ver 1_Site Plan_20240401Full Ponrl/ IV Lake (AtFUll Prod/Normal VllatapL�v®ij 2 'rri nva IRS IVb 7MEFS j26AAO NL,-NlJik L Disrule T & z. bS )NL� j5 Please approximately sketch the following information on this plan Item, such a$ I0 ftx J00 ftJ+�: i, l,®�®vide d/nyensionsforeach All proposed vegetation clearing Z. Location of rip rep or fill to be placed above the Full P S. Location Of rip and/Normal Water Level eI vatlon 4• Location ofan rep or fill to ru pureed below the Full Pond/Normal Water level elevation 5, y proposed structural such as buildings, n Location of any excavation or dyed n Ss, retaining walls, docks, etc. 6. Location Of Constr'uctlon a g below the Full Pond/ Normal Water Level elevation access corrldors FORM: SSGP 10.2013 Page of 5. Describe the existing land use or condition of the site at the time of t undeveloped, etc.): plication (residential, o LF l'6L.c vA L 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 6V Ly A,�J 7. Will work be conducted from land? From water? I 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: — 4�0 Temporary impacts in square feet: J�E�h 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land- wa rd Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: g44C), Temporary impacts (temporary �err g, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 11. Signature By signing below, I, as the project proponent, certify to the following: The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time Owner/Agen Signature' [15A NCAev 02H _Q502kf:1 Date 'Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation linxJz xnt;.�IPscit_ntdntu l r t Gi iyccffrbtatsdutn& _512\c=�ars�b�u�Stiaf Full Ponrl/ IV Lake (AtFUll Prod/Normal VllatapL�v®ij 2 'rri nva IRS IVb 7MEFS j26AAO NL,-NlJik L Disrule T & z. bS )NL� j5 Please approximately sketch the following information on this plan Item, such a$ I0 ftx J00 ftJ+�: i, l,®�®vide d/nyensionsforeach All proposed vegetation clearing Z. Location of rip rep or fill to be placed above the Full P S. Location Of rip and/Normal Water Level eI vatlon 4• Location ofan rep or fill to ru pureed below the Full Pond/Normal Water level elevation 5, y proposed structural such as buildings, n Location of any excavation or dyed n Ss, retaining walls, docks, etc. 6. Location Of Constr'uctlon a g below the Full Pond/ Normal Water Level elevation access corrldors FORM: SSGP 10.2013 Page of LAO 1%4001 - ---------- ------- $i � '4 �� \ \ ����- Beg \�_ _ // `� x P a° M lop 01 F ar fix PHI fill F if gill. -out sit, - All if I NT of Is zz gli 5 a I s g g I c5 J1 v_ 1------'. 's_� v / i! A xii e'• g 71 A ol- ° -�ii it spit,Mf e x =4s e Jr�lI3 imk�' vl! X I I it A x!F a it Q t� x0°![s E_i1Eef_diE r l�xd"9 '.S:EQ_ if a'eQQ, Ea pill, sa. •{' ix xz; El eA;x� pqP t5- .e 9 y 9A ` e A ttDD if vy �°_. A� �'.op E°Mi i � Ii �'< � n _ •.x aQ�A � R � � F�� as 9"9 � EI' zRn g ��� Via; r¢�e � ��i: �•'�! t� N e @! AGENT AUTHOILIZA RON FORM PROEM }!M-Tlf LEGAL DESCRIPTION: '07- �'C` / PLAN NO. — -- PARCEL ID:��- p9ene;e fir+Plt.: registered property owners of the above noted property, do hereby authorize �t N awn ter 1 red — , of _ La P (ILon(� actor I Agent) (Name of consulting flan) �:U:J rre &svnaif drId @te all actions necessary for the processing, issuance and acceptance of Deb spit or certification and any and all standard and special conditions attached. Akddress (if different than property above): Wehereby cardy the above information 5ubrillded M this application as tt ue and accurate to the .iw� -If MPF ir;r ;,Arledge. d b]cipare Authorized Signature Date: CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project IN Owner: Contract The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 an , 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. E.ception, those trees that are severely undermined along the immediate shoreline can be removed. (Minimal shaping alga sipping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, imper.ious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. Tnere are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work -i:o be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be o,:tsiae the puffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must ce at the natural elevation and discharged prior to entering the buffer directed as diffuse or sleet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowlealagernent q;-, Notification 1, —rPJG,/1 !'.Gr p )?�f , LL(_ , hereby state that I have been informed of the Catawba Riparian . '. r;, vvork conducted in the buffer, not specifically stated in the application and approved by the Division of vva• er Resources (DWR), is a violation and subject to enforcement. Due diligence will be zai•:e.: such -ci:ac cE:e c3:.s : uc�iar. v✓ill be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer RuI the approved plan(s) and specification(s), and other supporting rnaterials. _ , /l % ."ignaiure ;3JV"1e6i / l �! ��/ DateA i 3 Z