SPPP TIER RESPONSE LOG
Outfall No. 1 Tier one Response Documentation for Stabilus-Gastonia,NC
- tfall No. 1 Tulip Drive Ar-a (North Side
Maintenance Maintenance
Sample Period I Benchmark Benchmark Exceeded Tier Status and Person(s) Required? Completed Report
Requirement Sample Date Limits Red Text Date Conducting Inspection Results/Comments Updated Update by:
Inspection
Actions Taken (Date)
Tier Ill S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/
Jul-22 No Sample Taken 8/4/2021 Ledford measureable rain event occurred during this period. None required 8/9/2022 T.Ledford
Tier Ill S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/
Aug-22 No Sample Taken None required 9/3/2022 T.Ledford
8/4/2021 Ledford measureable rain event occurred during this period.
Tier Ill S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/
Sep-22 No Sample Taken 8/4/2021 Ledford measureable rain event occurred during this period. None required 10/3/2022 T.Ledford
Oct-22 10/1/2022 Zn:0.198mg/L Tier Ill S.Parris Outfall service area inspected.Conditions found unchanged. None required 10/31/2022 M.Ellington
8/4/2021
Copper Cu:0.0151 Zinc Tier III
Nov-22 11/15/2022 8/4/2021 S.Parris Outfall service area inspected.Conditions found unchanged. None required 12/12/2022 M.Ellington
Zn:0.368
Dec-22 12/15/2022 Copper Cu:0.0553 Zinc Tier Ill S.Parris/ T. Outfall service area inspected.Conditions found unchanged. None required 1/16/2023 J.Shrewsberry
Zn:0.296 T55:358 8/4/2021 Ledford
Cu:0.0050mg/L Tier Ill S.Parris/ T.
Jan-23 1/25/2023 Zn:0.191mg/L 8/4/2021 Ledford Outfall service area inspected.Conditions found unchanged. None required 1/16/2023 J.Shrewsberry
Tier Ill S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/
Feb-23 No Sample Taken None required 1/16/2023 J.Shrewsberry
8/4/2021 Ledford measureable rain event occurred during this period.
Tier Ill S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/
Mar-23 No Sample Taken 8/4/2021 Ledford measureable rain event occurred during this period. None required 1/16/2023 J.Shrewsberry
Apr-23 4/28/2023 Cu:ND Tier Ill S.Parris/ T. Outfall service area inspected.Conditions found unchanged. None required 6/5/2023 T.Ledford
Zn:0.034mg/L 8/4/2021 Ledford
May-23 No Sample Taken Tier Ill S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/ None required 7/6/2023 T.Ledford
8/4/2021 Ledford measureable rain event occurred during this period.
Jun-23 No Sample Taken Tier Ill S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/ None required 8/2/2023 T.Ledford
8/4/2021 Ledford measureable rain event occurred during this period.
1 of 3 Submittal Copy of Stormwater Monitoring&Reports Jul 2021-Jun 2026.xlsx
4/1/2024 V:\DEP\Environmental-Health-Safety-US1\Internal\Stormwater\
STABILUS STORM WATER PERMIT REQUIREMENTS USSE
SPPP TIER RESPONSE LOG
Stabilus-Gastonia, NC
Tier One Response Documentation for Outfall # 2
Person(s) Maintenance Maintenance
Sample Period Benchmark Benchmark Exceeded Tier Status Required? Completed Report
Requirement Sample Date Limits Red Text and Date Conducting Inspection Results/Comments Updated
Update by:
e
p p Inspection Actions (Date) p
Taken
Jul,Aug,Sep S. Parris/ Outfall service area inspected. Conditions found None
2022 No Sample Taken None T. Ledford unchanged. No Collectable/measureable rain event required 10/4/2022 T.Ledford
occurred during this period.
Oct,Nov,Dec 10/1/2022 In Compliance None S. Parris/ Outfall service area inspected. Conditions found None 10/31/2022 M.Ellington
2022 T. Ledford unchanged. required
12/15/2022 In Compliance Outfall service area inspected. Conditions found
unchanged.
1/25/2022 In Compliance Outfall service area inspected. Conditions found
unchanged.
Jan,Feb,Mar None
None S. Parris/ Outfall service area inspected. Conditions found 1/16/2023 J.Shrewsberry
2023 T. Ledford unchanged. No Collectable/measureable rain event required
occurred during this period.
No Sample Taken
Outfall service area inspected. Conditions found
unchanged. No Collectable/measureable rain event
occurred during this period.
Apr,May,Jun 4/28/2023 In Compliance None S. Parris/ Outfall service area inspected. Conditions found None 8/2/2023 T.Ledford
2023 T. Ledford unchanged. required
2 of 3 Submittal Copy of Stormwater Monitoring& Reports Jul 2021-Jun 2026.xlsx
4/1/2024 V:\DEP\Environmental-Health-Safety-US1\Internal\Stormwater\
STABILUS STORMWATER PERMIT REQUIREMENTS USSE
SPPP TIER RESPONSE LOG
Stabilus-Gastonia, NC
Tier One Response Documentation for Outfall # 2
Maintenance Maintenance
Sample Period Benchmark Benchmark Tier Status Person(s) Required? Completed Report
Exceeded Conducting Inspection Results/Comments Update by:
Requirement Sample Date and Date Updated
Limits Red Text Inspection Actions Taken (Date)
I Outfall service area inspected. Conditions found
Jul,Aug,Sep Parris/
NA No Sample Taken None S. unchanged. No Collectable/measureable rain event None required 10/3/2022 T.Ledford
2022 T. Ledford
occurred during this period.
Oct,Nov,Dec 10/1/2022 In Compliance None S. Parris/ Outfall service area inspected. Conditions found None required 10/31/2022 M.Ellington
2022 T. Ledford unchanged.
Jan,Feb,Mar 1/25/2022 In Compliance S. Parris/ Outfall service area inspected. Conditions found None required 1/16/2023 J.Shrewsberry
2023 T. Ledford unchanged.
1
Apr,May,Jun 4/28/2023 In Compliance None S. Parris/ Outfall service area inspected. Conditions found None required 8/2/2023 T.Ledford
2023 T. Ledford unchanged.
3 of 3 Submittal Copy of Stormwater Monitoring& Reports Jul 2021-Jun 2026.xlsx
4/1/2024 V:\DEP\Environmental-Health-Safety-US1\Internal\Stormwater\