Loading...
HomeMy WebLinkAboutSW6191204_CEI_20240401 5FA ROY COOPER Governor ELIZABETH S.BISER ` Secretary ` M WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality April 01, 2024 CERTIFIED MAIL:7018 0040 0000 4772 0134 RETURN RECEIPT REQUESTED Freddie Stancil Stancil Builders Inc. 466 Stancil Rd Angier, NC 27501 Subject: Compliance Evaluation Inspection-Non-Compliant State Stormwater Management Permit SW6191204 Windy Hill Farm Subdivision Harnett County Dear Mr. Stancil: On March 21, 2024, I, Bailey Taylor and Tabytha Smith from the.Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources(DEMLR)„conducted a Compliance Evaluation Inspection at the Windy Hill Farm Subdivision located in Harnett County, North Carolina. The purpose of the inspection was to ensure compliance with State Stormwater Management Permit SW6191204 that was issued on April 01, 2020. A copy of the Compliance Inspection Report is enclosed for your review. As a result of the inspection and subsequent file review, it has been determined that the facility is Not Compliant with the conditions of the subject permit and approved plans. The required actions that are necessary to bring this site into compliance are noted under the Inspection Summary and Comments sections of the report. You are asked to provide this office a written/typed response within 30 calendar days from receipt of this letter. Your response should specify actions that will be undertaken and the time frame that will be required to correct the deficiencies. Failure to provide the requested information may constitute the issuance of a Notice of Violation,which is subject to the assessment of a civil penalty of up to$25,000 per day, per violation. If you have any questions or this office can be of any assistance, please contact me at(910)433-3300 or by e-mail at bailey.taylor@deq.nc.gov. Sincerely, Bailey Taylor Senior Environmental Specialist Enclosure Ec: Keith M Roberts, PE-Timmons Group :. James F Chandler Jr., PE-Timmons Group Jim Farkas-State Stormwater Program Engineer Lance Sandler-Highland Grove Homeowners Association /Resident. Cc: FRO—DEMLR, State Stormwater Files, SW6191204 North Carolina Department of Environmental Quality 1 Division of Energy,Mineral and Land Resources ) Fayetteville Regional Office 1225 Green Street.Suite 714 I Fayetteville,North Carolina 28301 NORTH cnacunua Depsrbnent at Eirrfroemente WM el 910,433,3300 Compliance Inspection Report Permit: SW6191204 Effective: 04/01/20 Expiration: 03/31/28 Project: Windy Hill Farm Subdivision Owner: Stancil Builders Inc County: Harnett Adress: Christian Light Rd Region: Fayetteville CitylState/Zip: Fuquay Varina NC 27526 Contact Person:Freddie Stancil Title: President Phone:919-639-2073 Directions to Project: Project located on Christian Light Road, north of intersection of Christian Light Road and Hardee Road. Type of Project: State Stormwater-HD-Bioretention Drain Areas: 1 -(Avents Creek) (03-06-07)(WS-IV;HQW) 2-(Avents Creek) (03-06-07)(WS-IV;HQW) 3-(Avents Creek) (03-06-07)(WS-IV;HQW) 4-(Avents Creek) (03-06-07)(WS-IV;HQW) 5-(Avents Creek) (03-06-07)(WS-IV;HQW) On-Site Representative(s): Related Permits: Inspection Date: 03/21/2024 Entry Time 11:30AM Exit Time:02:00PM Primary inspector: Bailey LTaylor l�j Phone:910-433-3300 Secondary inspector(s): Reason for Inspection: Routine Inspection Type: Transfer Renewal Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant NI Not Compliant Question Areas: State Stormwater (See attachment summary) page 1 Permit: SW6191204 Owner-Project: Stencil Builders Inc Inspection Date: 03/21/2024 Inspection Type Transfer Renewal Reason for Visit: Routine Inspection Summary: Inspection conducted in response to submittal of permit transfer application. At the time of inspection, SCM 1,and 2 appeared to constructed/maintained per the original permit and certified as-built drawings by Timmons Group. SCM 3 has gully erosion forming at the corrugated outlet pipe and requires additional riprap to prevent further erosion. SCM4 has a plunge pool forming at the inlet swale, causing a settling area and erosion of the southeastern slope is occuring. Permanent ground cover has not been established in SCM4 and sections of slope remain bare with dead sod. Gully erosion has occured at the outlet pipe of SCM4 and requires maintenance. SCM5 does not appear to have accurate elevations on the spillway height and top of berm height, according to the as-built plans. There is settling in the bottom of pond SCM5 near the spillway, creating a unlevel elevation that may cause issues with infultration rates.The backside slope of SCM5 has erosion occuring at the time of inspection. SCM5 requires additional ground cover/stablization along slopes and top of berm. SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ❑ • ❑ 0 Are the inlets located per the approved plans? • ❑ ❑ ❑ Are the outlet structures located per the approved plans? 0 0 ❑ Comment: SCM 5 does not appear to have proper elevations on spill way and top of berm. SCM5 has low lying area (uneven bottom of pond)where water will settle, near the southeast portion of the SCM and the spillway, reducing the available infultration square footage. SMC5 has evidence of erosion occurinq on the south side (back side)of the berm, below the spillway. SCM4 has a plunge pool forming at the inlet swale to the SCM. SCM4 has erosion occurinq at outlet pipe and along southeast slope of SCM. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ■ ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? • 0 0 0 Is the BUA(as permitted) graded such that the runoff drains to the system? • ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? 0 • 0 0 Are the SW BMP inspection and maintenance records complete and available for review or ❑ ❑ ❑ ■ provided to DWQ upon request? Comment: Maintenance of SCM 4 and 5 are required.Additional ground cover is required. SCM3 requires additional rip rap at outlet pipe to reduce velocity of discharge and prevent further erosion and gullys from forming. page 2