HomeMy WebLinkAboutSW8201006_Current Permit_20210304 . Zr ROY COOPER .-e . Governor .4 MICHAEL MICHAEL S.REGAN . Secretary ° a _ BRIAN WRENN NORTH CAROLINA Director Environmental Quality March 4,2021 Seamist Properties,LLC Attn:McKinley D.Dull,Manager 3807 Peachtree Avenue, Suite 200 Wilmington,NC 28403 Subject: State Stormwater Management Permit No.SW8 201006 Wilmington Trade Center High Density Project New Hanover County Dear Mr.Dull: The Wilmington Regional Office received a complete State Stormwater Management Permit Application for the subject project on October 13,2020 with final additional information received on January 27,2021. Staff review of the plans and specifications has determined that the project,as proposed,complies with the Stormwater Regulations set forth in Title 15A NCAC 02H.1000 amended on January 1,2017(2017 Rules). We are hereby forwarding Permit No. SW8 201006,dated March 4,2021,for the construction of the built-upon areas(BUA)and stormwater control measures(SCMs) associated with the subject project. This permit shall be effective from the date of issuance until March 4,2029 and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. Failure to comply with these requirements will result in future compliance problems.Please note that this permit is not transferable except after notice to and approval by the Division. This cover letter,attachments,and all documents on file with DEMLR shall be considered part of this permit and is herein incorporated by reference. If any parts,requirements,or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty(30)days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee(if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714,or via telephone at 919-431-3000,or visit their website at www.NCOAH.com.Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit,please contact Steve Pusey in the Wilmington Regional Office, at(910)796-7215 or steven.pusey@ncdenr.gov. Sincerely, X Brian Wrenn,Director Division of Energy,Mineral and Land Resources Enclosures: Attachment A—Designer's Certification Form Application Documents DES/sgp: \\\Stormwater\Permits&Projects\2020\201006 HD\2021 02 permit 201006 cc: Jason Clark,PE—Norris&Tunstall Consulting Engineers,PC New Hanover County Building Safety Department New Hanover County Engineering Department NCDOT District Engineer Wilmington Regional Office Stormwater File North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources Z-U73 ) Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington,North Carolina 28405 °eiwi°a�"a"' 910.796.7215 State Stormwater Management Permit No. SW8 201006 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO Seamist Properties, LLC Wilmington Trade Center 4104 US Hwy 421 North, Wilmington, New Hanover County FOR THE construction, management, operation and maintenance of built-upon area (BUA) draining to one (1) infiltration trench and one (1) infiltration basin ("stormwater control measures" or"SCMs") as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until March 4, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking, and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 1. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 978,591 square feet. The runoff from all BUA within the permitted drainage areas of this project must be directed into the permitted SCMs. The BUA requirements and allocations for this project are as follows: a. SCM BUA LIMITS. The SCMs labeled DA1 (infiltration basin) and DA2 (infiltration trench) have been designed using the runoff treatment method to handle the runoff from 839,423 square feet and 139,168 square feet of BUA, respectively, within the delineated drainage areas. This permit does not provide any allocation of BUA for future development within the delineated drainage area(s). 2. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. Page 1 of 5 State Stormwater Management Permit No. SW8 201006 3. SCM REQUIREMENTS. The SCM requirements for this project are as follows: a. SCM DESIGN. The SCMs are permitted based on the design criteria presented in the sealed, signed and dated supplement and as shown in the approved plans and specifications. These SCMs must be provided and maintained at the design condition. b. PRETREATMENT. The following pretreatment device(s) has (have) been provided to prevent clogging in the infiltraion SOMs: sumps in catch basins, filter strips, grassed swales, forebays for pretreatment. 4. STORMWATER OUTLETS. This project has demonstrated that the on-site stormwater system will not discharge from the 10-year storm event and therefore will not have the opportunity to cause erosion during the 10-year storm event. 5. VEGETATED SETBACKS. A 50-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. a. BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback except as shown on the approved plans. b. RELEASE OF STORMWATER NOT TREATED IN AN SCM. Stormwater that is not treated in an SCM must be released at the edge of the vegetated setback and allowed to flow through the setback as dispersed flow. 6. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. ACCESS AND/OR EASEMENTS. The entire stormwater conveyance system, including any SCMs, and maintenance accesses must be located in public rights-of-way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS. The final recorded plats_must reference the operation and maintenance agreement and must also show all public rights-of-way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. 7. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on-site stormwater system will be repaired immediately. a. UNDERGROUND SCMs. It is recommended that during the installation of the underground SCM, photos be taken documenting the construction and demonstrating that the constructed SCM meets the approved design. It is further recommended that these photos be submitted with the required Designer's Certification. b. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment-Erosion Control devices are converted to SCMs or no longer needed. Once the device is converted to a SCM, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. c. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved state stormwater design condition prior to close-out of the erosion control plan and/or project completion and/or transfer of the state stormwater permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. Page 2 of 5 State Stormwater Management Permit No. SWB 201006 8. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 9. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights-of-way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 10. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation arid maintenance necessary, as listed in the signed operation and maintenance agreement, to assure that all components of the permitted on-site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on- site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11 PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(3). Page 3 of 5 State Stormwater Management Permit No. SW8 201006 12. CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee. 13. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2) and must be submitted upon occurrence of any one or more of the following events: i. The sale or conveyance of the project and/or property area in whole or in part; ii. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; iii. Bankruptcy; iv. Foreclosure, subject to the requirements of Session Law 2013-121; b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 14. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. c. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. d. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. Page 4 of 5 State Stormwater Management Permit No. SW8 201006 f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit issued this the 4th day of March 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION OLL0 I`/C Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 201006 Page 5 of 5 s DEMLR USE ONLY Date Received Fee Paid Permit Number (a 113 f ao an) I 8-69 $ sod ! Sr,J B. 02 o !'D o a Applicable Rules: ❑Coastal SW-1995 0 Coastal SW-2008 ❑Ph II-Post Construction (select all that apply) 0 Non-Coastal SW-HQW/ORW Waters ❑Universal Stormwater Management Plan 0 Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy,Mineral and Land Resources I�I STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): Wilmington Trade Center 2. Location of Project(street address): 4104 US Hwy.421 North City:Wilmington County:NC Zip:28401 3. Directions to project(from nearest major intersection): 5,200'North of the intersection of US 421&I-140. Proceed North on US 421. The site is on the East side of US 421. 4. Latitude:34°18'07.6"N Longitude:77°58'40.5"W of the main entrance to the project. II. PERMIT INFORMATION: 1.a.Specify whether project is(check one): //New ['Modification ❑Renewal w/Modificationt tRenewals with modifications also requires SWU-102-Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit,list the existing permit number ,its issue date(if known) ,and the status of construction: ONot Started ['Partially Completed* ❑Completed* *provide a designer's certification 2. Specify the type of project(check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ['Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application,list the stormwater project number, if assigned, and the previous name of the project,if different than currently proposed, 4.a.Additional Project Requirements(check applicable blanks;information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control:29.3 ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit:Proposed Impacts b.If arty of these permits have already been acquired please provide the Project Name,Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ['No If yes,see S.L.2012-200,Part VI:http://portal.ncdenr.org/web/lr/rules-and-regulati E C OCTpp 1 3 Z023 BY: Form SWU-101 Version Oct.31,2013 Page 1 of 6 III. CONTACT INFORMATION 1.a.Print Applicant/Signing Official's name and title(specifically the developer,property owner,lessee, designated government official,individual,etc.who owns the project): Applicant/Organization:Seamist Properties,LLC Signing Official&Title:McKinley D.Dull,Manager b.Contact information for person listed in item la above: Street Address:3807 Peachtree Avenue,Suite 200 City:Wilmington State:NC Zip:28403 Mailing Address(if applicable):Same as Above City: State: Zip: Phone: (910 ) 395-6036 Fax: ( ) N/A Email:kdull@mckinleybuilding.com c.Please check the appropriate box.The applicant listed above is: ®The property owner(Skip to Contact Information,item 3a) ❑Lessee*(Attach a copy of the lease agreement and complete Contact Information,item 2a and 2b below) ❑Purchaser*(Attach a copy of the pending sales agreement and complete Contact Information,item 2a and 2b below) ❑Developer*(Complete Contact Information,item 2a and 2b below.) 2.a.Print Property Owner's name and title below,if you are the lessee,purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official&Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address(if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 3.a. (Optional)Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:McKinley Building Corporation Signing Official&Title:Pete Avery b.Contact information for person listed in item 3a above: Mailing Address:3807 Peachtree Avenue,Suite 200 City:Wilmington w. .._ State:NC Zip:28403 Phone: (910 ) 395-6036 Fax: ( ) N/A Email:pavery@mckinleybuilding.com 4. Local jurisdiction for building permits:New Hanover County Building Safety Point of Contact:Nicholas Gadzekpo,Director Phone#: (910 ) 798-745 E C q7� st 1 3 2112.3 Form SWU-101 Version Oct.31,2013 Page 2 of 6 BY: IV. PROJECT INFORMATION NI \a' I 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. C�Q,iy c oi454,01 Wilmington Trade Center(aka I-140 Phase V Development)is treated in Infiltration Basin#1 and an underground infiltration basin. 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: ❑Approval of a Site Specific Development Plan or PUD Approval Date: ❑Valid Building Permit Issued Date: ❑Other: Date: b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with: ❑Coastal SW—1995 ❑Ph II—Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area:27.899 acres 5. Total Coastal Wetlands Area:0 acres 6. Total Surface Water Area:0 acres 7. Total Property Area(4)—Total Coastal Wetlands Area(5)—Total Surface Water Area(6)=Total Project Area+: 27.899 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures,the area between the banks of streams and rivers,the area below the Normal High Water(NHW)line or Mean High Water (MHW)line,and coastal wetlands landward from the NHW(or MHW)line. The resultant project area is used to calculate overall percent built upon area(BUA). Non-coastal wetlands landward of the NHW(or MHW)line may be included in the total project area. 8. Project percent of impervious area:(Total Impervious Area /Total Project Area)X 100 =80 0/0 9. How many drainage areas does the project have?2(For high density,count 1 for each proposed engineered stormwater BMP. For low density and other projects,use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an a ; ' sA it,heet th the information for each area provided in the same format as be �'� L. Basin Information ainage Area 1 Dra age Area 2 Drainage Area_ Drainage Area_ Receiving Stream Name NE CF River NE CF River Stream Class * SC;Sw SC;Sw Stream Index Number* CFP17 18-74-61 CFP17 18-74-61 Total Drainage Area(sf) 992,541 155,107 On-site Drainage Area(sf) 984,280 155,107 Off-site Drainage Area(sf) 8,261 0 Proposed Impervious Area**(sf) 839,423 139,168 %Impervious Area**(total) 84.6% 89.7% Impervious**Surface Area Drainage Area 1 Drainage Area 2 Drainage Area_ Drainage Area_ On-site Buildings/Lots(sf) 425,250 0 On-site Streets (sf) 0 0 On-site Parking (sf) 264,785 118,045 On-site Sidewalks (sf) 762 14,341( c E C ; Other on-site csf) \& 145,281 6,782 Future(sf) 0 0 r « Off-site (sf) 3,345 0 Existing BUA***(sf) 0 0 BY: Total (sf): 839,423 139,168 * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classifications ** Impervious area is defined as the built upon area including,but not limited to,buildings,roads,parking areas, sidewalks,gravel areas,etc. ***Report only that amount of existing BUA that will remain after development.Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version Oct. 31,2013 Page 3 of 6 11: How was the off-site impervious area listed above determined?Provide documentation.N/A Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened& Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance(O&M)forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy,Mineral and Land Resources(DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item.All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. als 1. Original and one copy of the Stormwater Management Permit Application Form. '�- 2. Original and one copy of the signed and notarized Deed Restrictions&Protective Covenants Form.(if required as per Part VII below) 3. Original of the applicable Supplement Form(s)(sealed,signed and dated)and O&M I 1 agreement(s)for each BMP. f� 4. Permit application processing fee of$505 payable to NCDENR. (For an Express review,refer to . http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative(one to two pages)describing the stormwater treatment/management 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within'mile of the site boundary,include the1 mile radius on the map. _ 7. Sealed,signed and dated calculations(one copy). 8. Two sets of plans folded to 8.5"x 14"(sealed,signed,&dated),including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures,the banks of streams and rivers,the MHW or NHW line of tidal waters,and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impo d structures,the banks of streams or rivers,and the MHW(or NHW)of tidal waters .' i. Dimensioned property/project boundary with bearings&distances. '�'r 1 3 �+^� j. Site Layout with all BUA identified and dimensioned. �d�� k. Existing contours,proposed contours,spot elevations,finished floor elevations. By. 1. Details of roads,drainage features,collection systems,and stormwater control measures. m.Wetlands delineated,or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations. o. Drainage areas delineated(included in the main set of plans,not as a separate document). p. Vegetated buffers(where required). Form SWU-101 Version Oct. 31,2013 Page 4 of 6 9. . Copy of any applicable soils report with the associated SHWT elevations(Please identify elevations in addition to depths)as well as a map of the boring locations with the existing elevations and boring logs.Include an 8.5"x11"copy of the NRCS County Soils map with the % • \ project area clearly delineated. For projects with infiltration BMPs,the report should also (�Q, include the soil type,expected infiltration rate,and the method of determiningthe infiltration rate. xP (Infiltration Devices submitted to WiRO:Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910)796-7378.) II 10. A copy of the most current property deed.Deed book: 5 g ii Page No: `i st' c,3�u, 11. For corporations and limited liability corporations(LLC):Provide documentation from the NC Secretary of State or other official documentation,which supports the titles and positions held by the persons listed in Contact Information,item la,2a,and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State,otherwise the application will be returned. http:/iwww.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions,outparcels,and future development,the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary,a table listing each lot number,lot size,and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/lr/state- stormwater-forms docs.Download the latest versions for each submittal. In the instances where the applicant is different than the property owner,it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s)below,the permit holder(s)certify that the recorded property restrictions and protective covenants for this project,if required,shall include all the items required in the permit and listed on the forms available on the website,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR,and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm(such as a consulting engineer and/or firm)so that they may provide information on your behalf for this project(such as addressing requests for additional information). Consulting Engineer:John S.Tunstall,P.E.or T.Jason Clark,P.E. Consulting Firm:Norris&Tunstall Consulting Engineers,P.C. Mailing Address:2602 Iron Gate Drive,Suite 102 City:Wilmington State:NC Zip:28412 Phone: (910 ) 343-9653 Fax: (910 ) 343-9604 Email:jtunstall@ntengineers.com or jclark@ntengineers.com &anorris@ntengineers.com IX. PROPERTY OWNER AUTHORIZATION(if Contact Information,item 2 has been filled out,complete this section) I,(print or type name of person listed in Contact Information,item 2a) ,certify that I own the property identified in this permit application,and thus give permission to(print or type name of person listed in Contact Information,item la) with(print or type name of organization listed in Contact Information,item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal,which indicates the party responsible for the operation and maintenance of the stormwater system. 11 flEcEv. OC r 13 2023 ' Form SWU-101 Version Oct.31,2013 Page 5 of 6 By. As the legal property owner I acknowledge,understand,and agree by my signature below,that if my designated agent(entity listed in Contact Information,item 1)dissolves their company and/or cancels or defaults on their lease agreement,or pending sale,responsibility for compliance with the DEMLR Stormwater permit reverts back to me,the property owner.As the property owner,it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days;otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to$25,000 per day,pursuant to NCGS 143-215.6. Signature: Date: I, ,a Notary Public for the State of County of ,do hereby certify that personally appeared before me this_day of ,and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I,(print or type name of person listed in Contact Information,item la)McKinley D.Dull,Manager certify that the information included on this permit application form is,to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans,that the required deed restrictions and protective covenants will be recorded,and that the proposed project complies with the requirements of the applicable sto wat es under 15 CAC .1000 and any other applicable state stormwater requirements. Signature: ql..... Date: j 11'(14 d I, larN st.l_VCg ! ,a,N�ottary Public for the State ofJO&4'hCfLQi(('ffl..çounty of J) O1( - 1,do hereby certify that 11d(i IN It.ti b.b(J I personally appeared before me this 10 day of*Aember a(bo,and cknowled e e e execution of the application for a stormwater permit. Witness my hand and of . ' Mt, SEAL NOTARY PUBLIC 0 Q, z 2 = ..4jitisitivits6ii otts 612 pop0a5 "..,,, fti11i11N%N AECt E BY• Form SWU-101 Version Oct.31,2013 Page 6 of 6 SUPPLEMENT-EZ COVER PAGE I - FORMS LOADED tI 1\ 3 PROJECT IINFORMATION - - ---- ' `""__._._ ..,______..--.---._._-_____ _____� 1 Project Name ��,,•�w_".._,...__._.__s:-�.�_���: _ - zY Wllmingfon Trade Center 2 Project Area(ac) IF - 27 6gQ----- 3 Coastal Wetland Area(ac) j---- 0 ----— 4- Surface Water Area(acy I -- -- — - 0 5 Is this project High or Low Density? -------•--- High.---- 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H 1-003(4) ! 7 Width of vegetated setbacks provided(feet) i N/A__ 8 Will the vegetated setback remain vegetated? 9 Is BUA other that as listed in.1003(4)(c-d)out of the setback? --_�� N/A 10 Is streambank stabilization proposed on this project? � No - -- -_j NUMBER AND TVPE OF Sells: 11 infiltration System 12 Biccr ter7ticr ill 1�+ ��Vet Pond ---------- -��.- ..._-_.__-__...._ 14 Sternmater Wetland -T.--- 15 Permeable Pavement --------__._ 0_.. 16 Sand Filter 0 17 Rainwater Harvesting(RWH) _----0_--- - - ---_ --� 18 Green Roof - 0 19 Level Spreader-Filter Strip(LS-FS) I - -, 0 - -- 20 Disconnected Impervious Surface(DIS) i 0 21 Treatment Swale 22 Dry Pond 3 23 Stomvvizr filter __--- —__ 0 - ---_ _. 24 SElvo Cell - 25 16a [ter - 0 -—T--- 26 Altura --_ 0 -�_ ----• FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: —_- T.Jason auk, - ---- 28 Organization: _- Norris 8:Tunstall Consulting Engineers,P.C. 29 Street address: 2602 Iron Gate Drive,Suite 102 30 City,State,Zip: __- Wilmington..NC 28412 31 Phone number(s): 32 Email: jclark@ntengineers.com Certification Statement, !certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision,that the information provided in the form rs,to the best of my knowledge and belief,true,accurate,and complete;and that the engineenng plans,specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here Pesioner rq ' S• O I •�•• Signature signer +•- = SEAL r. _ �:• 03086 _ LIt 13 2020 •!�GfNEE�•�� BY: 'Z ON CV S Id -a'-2d hh,/1/x11111t11111111\1�\\\\\ Seal Date DRAINAGE AREAS ..,11 Is this a high density project? Yes 1 NT 11131 • 2 If so,number of drainage areas/SCMs tt _ 2 _ Is all/part of this project subject to previous rule I _ - ( tiM' ir ,�.3 versions? _ No »>uuu+++��� FORMS LOADED DRAINAGE AREA INFORIIAATION - F---7 Entire Site � '31- 2 --I� A1s�:Jn�:Y_5...._.c.r.,--.1.-- a"......_.an—_-tea:—__.�_-_ ��di..s. t.— afl •s_- 9.-.. f_� .-S aws•a v_ UG Infiltration11 4 Type of SCM N/A Infiltration Basin Trench 5 Total BUA in project(sq ft) 978591 sf_ L _ 839423 sf _ —139168 sf_ New BUA on subdivided lots(subject to permitting)! I- - - 11 6 (sq ft) {__ 0 sf ___I _ 0 sf I. 0 sf _ { New BUA outside of subdivided lots(subject to I -' r --' - 7 permitting)(sf) _ 978591 sf 839423 sf ' 139168 sf 8 Offsite-total (sqareaft) �� � 11 I- 8261 sf 8261 sf 0 sf Y 9 Offsite BUA(sq ft) Ir^-_0 sf 0 sf !i 0 sf I 10 Breakdown of new BUA outside subdivided lots: ., �: _ _ _ �i -Parking(sq ft) 386175 sf_ {• 268130 sf118045 sf -Sidewalk(sq ft) _15703 sf - _____4_--_ 762 sf 14341 sf -Roof(sq ft) 425250 sf_ ,: 425250 sf_ } 0 0 -Roadway(sq ft) ____0_sf -'_ 0 sf l4L� __D DAL__ j -Future(sq ft) � 0 sf-- 0 sf f _0 sf -Other,pleases city-n the m t box b i___ "' 1 below(sq ft) cb kW(' I 152063 sf ' 145281 sf C� 6782 sf j New infiltrating permeable pavement on I'_— __ ___-___�-_ 11 subdivided lots(sq ft) _ 0 sf __1 __0 sf.__ __'_0_s _f __ New infiltrating permeable pavement outside of (I � '- 12 subdivided lots(sq ft) 0 sf NI 0 sf 0 sf I Exisitng BUA that will remain(not subject to -� �I tF 13 permitting)(sq ft) 0 sf '� _ 0 sf -- ;� 0 sf I 14 Existing BUA that is already permitted(sq ft) L 0 sf _ 0 sf ji 0 sf 15 Existing BUA that will be removed(sq ft) 0 sf I -0 sf I 0 sf i 16 Percent BUA � 80%%-r � '8'4'H6 �r�_0%___ j =1 :I __ 17 Design storm(inches) _1.5 in i 1.5 in 1.5 in _ 18 Design volume of SCM(Cu ft) 1 0 cf i 100638 cf I� 16B18 cf 19 Calculation method for design volume Simple �j SimpleJ Simple ADDITIONAL INFORMATION __ Please use this space to provide any additional information about the 20 drainage area(s): *Parking impervious includes 3,345 SF of impervious from off-site. li• ' E7) JAN 2 r :;.,:°"411 BY: INFILTRATION SYSTEM N A-I1 Is I ,1 Drainage area number 1 (Basin) IL— 2(Trench) P 2 Design volume of SCM(Cu ft) �_' 100638 cf _ it �16618 cf T' �(�Af k 01,q �_�Il ERAL MDC FROM 02H.1050 _- — 1�[J 1f r .L 1 3 Is the SCM sized to treat the SW from all surfaces at build-out? !-- Yes _ Yes V 4 Is the SCM located away from contaminated soils? I Yes -Yes 5 What are the side slopes of the SCM(H:V)? 3 1 I 1:1 6 Does the SCM have retaining walls,gabion walls or other engineered side slopes? No No i • 7 Are the inlets,outlets,and receiving stream protected from erosion(10-year storm)? I Yes HYes r i 8 Is there an overflow or bypass for inflow volume in excess of the design volume? I Yes L_ Yes _ _ _ 9 What is the method for dewateringthe SCM for maintenance? Pump _. -• rr , (preferred) . Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes Yes_ 11 Does the maintenance access comply with General MDC(8)? Yes _i _ - Yes 1 12 Does the drainage easement comply with General MDC(9)? Yes (( --Yes If the SCM is on a single family lot,does(will?)the plat comply with General MDC 13 (10)? N/A N/A 14 14 Is there an O&MAgreement that complies with General MDC 11 ? - "--p ( ). Yes �^-_ Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes I Yes 16 Does the SCM follow the device specific MDC? Yes �, Yes i 17 Was the SCM designed by an NC licensed professional? { Yes '_- .Yes NFILTRATION SYSTEM MDC FROM 02H 1051 18 Proposed slope of the subgrade surface(%) 7_ 0% — �' —0%a---_.� 19 Are terraces or baffles provided? j No i^� No jr- 4. 20 Type of pretreatment - - -Sum (ft DI hSump CD DI \ 7 W1 Solis Data Was the soil investigated in the footprint and at the elevation of the infiltration ___filt JOIA) 11:8"jkld 21 system? Yes SHWT _Yes9.8 22 elevation(fmsl) 9.50 1 1 23 Depth to SHWT per soils report(in) {� *69.57 i$ *60 24 Ground elevation at boring in soils report(fmsl) 15.30 i__ 13.97 r { 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? Yes No 26 Soil infiltration rate(in/hr) 24 92 14.44 -._ Elevations 27 Factor of safety(FS) (2 is recommended): ---J__ 1,56 _ __ 2.00 _ .l -"29 Bottom elevation(fins!) -T- - 10.5 ft_ 12 ft 30 Storage elevation(fmsl) 1435 ft 17 ft 31 Bypass elevation(fmsl) -"'14..35 ft 17 ft For Basins Only 32 Bottom surface area,ft2: 28925 ft 1-:___ N/A 33 Storage elevation surface area(ft2) 70150 ft NIA -� For Trenches Only_34 Length(ft) - ---- --~- N/A 1990 ft 35 Width(ft) - N/A 7 5 ft 36 Perforated pipe diameter,if applicable(inches) N/A __- 36 in_^ 37 Number of laterals N/A • 1 38 Total length of perforated piping _-N/A 1990 ft 39 Stone type,if applicable _ N/A -_-#57 40 Stone void ratio(%) -N/A 40% 41 Is stone free of fines? _-_ N/A --__ Yes 42 Is the stone wrapped in geotextile fabric? N/A Yes' _ 43 Has at least one infiltration port been provided? --- N/A, Yes - VolumeslDrawdown - -_ _-_-- 44 Design volume of SCM(cu ft) - -- yy- 1DG638 of ;.._._..16618 cf_ 45 Time to drawdown(hours) 2.78 hrs _ .... 1 85 hrs _. _ �7——:!�.-wine_+e:rasaa-�.�r-.mow+.�R+ns:a�r-._-- 'ADDITIONAL INFORMATION� _ Ile e this any S-dditi n_.__.f _�i n-- rat�_- Please use this space to provide any additional information about the infiltration 46 system(s): 1 Borings 11-17 average to find SHWT&Rate for Basin. I 2 Borings 18-110 average to find SHWT&Rate for Trench. 3. ECS did report to allow Infiltration Basin#1 to have 1 foot separation between �l - � I ; t bottom&SHWT. BY: Infiltration 1 2:46 PM 1/25/2021 6 Operation & Maintenance Agreement Project Name: Wilmington Trade Center Project Location: 4104 US Hwy.421 North i!iainteranca records shall be kept cn the following aliiMP(s). This mainterance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired,or replaced immediately. These deficiencies can affect the integrity of structures,safety of the public,and the pollutant removal efficiency of the BMP(s). The IBMP(s)on this project include(check all that apply&corres:•onding O&M tables will be added automatically): Bioretention Cell Quantity Mil Location(s). Dry Detention Basin Quarrtiy:WM Locatiorrls). Grassed Swale Quantity: Location(s): Green Roof Quantity: Location(s):. Infiltration Basin Quantity: f Location(s):,See Plans Infiltration Trench Quantity:NMI Lo ion(sy See Plans Level SpreaderNFS Quantity � Ixr�it�n(s): Permeable Pavement Quantity:Mi. Location(s): Proprietary System Quantity:NMI Loc ation(s)- Rainwater Harvesting Quantity:NM Location(s): ». Sand Filter Quantity:MS Locations) __ Stormwater Wetland Quantity:MEN Location(s): Wet Detention Basin Quantity: 0 Location(s): Disconnected impervious Area Present. No Location(s): i User Defined 8MP Present: No Location(s): I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above,and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. *Responsible Party: McKinley D.Dull Title&Organization: Manager I Seamil st Properties,LLC Street address: 3807 Peachtree Avsnae,Suite 200 City, state,zip. INilrnbnoton,NC 20403 w Phone number(s): 8111E-33954036 Email: kdultirnckinteybultding.00m Signature: '1 1_- { /Date: / 4' ' l I. A(Y1ck ' idiuG13 ,a Notary Public for the State of .,,,1,1 I 0 (r`Itt k— County of 3 y O 1 r IC ,do hearty certify that 1 0 Icr_len b. . AI I personally appeared before me this I 0 . day of avientberd eQO O .asstiflewu% acknowledge the due execution of Operate rid aintenance Agreement- `l HATg4y�` Witness my hand and offal seal. VIJ WaSI On I l'eS CO 0-6/49°a-4 NOTARY co PUBLIC v 1 "..C'iit'"1'VAC:"\itiCK C0‘1...a4t/ k fl V 3 2U2j 20 :rsion 1.4 O&M.Manua! nsrao Pan*1+,td Seal My commission expires RECEive-7 :i. 13 2023 BY• STORM-EZ 9/9/2020 Version 1.4 O&M Manual Page 2 of 4 Infiltration S stem Maintenance Requirements important maintenance procedures: - The drainage area will be carefully managed to reduce The sediment load to The infiltration basin. - Immediately after the infiltration basin is established,the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. - The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it shall be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches(or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a infiltration basin erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the sediment off-site. swale applicable). The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale(if applicable). control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated Search for the source of the sediment and remedy the problem if and reduced the depth to 75% possible. Remove the sediment and dispose of it in a location where it of the original design depth. will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion protection such as reinforced turf matting or riprap is displaced. riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the sediment and remedy the problem if has accumulated. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than 5 Replace the top few inches of filter media and see if this corrects the days after a storm event. standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants Remove the plants by hand or by wiping them with pesticide(do not are growing in the main spray). treatment area. The embankment Shrubs or trees have started Remove shrubs or trees immediately. to grow on the embankment. ' re, An annual inspection by an Make all needed repairs. C ,1 ; appropriate professional shows that the embankment BY. needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. STORM-EZ 9/9/2020 Version 1.4 O&M Manual Page 3 of 4 The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. 1....,"...„. , , ., . ,,,„, eJ BY STORM-EZ 9/9/2020 Version 1.4 O&M Manual Page 4 of 4