Loading...
HomeMy WebLinkAbout20151018 Ver 1_Application_20151130 Carpenter,Kristi From:Rivenbark, Chris Sent:Monday, November 30, 2015 11:44 AM To:Andrew Williams (Andy) Cc:Al-Ghandour, Majed N; Chapman, Amy; gary_jordan@fws.gov; King, Art C; Koch, Thomas K; Carpenter,Kristi; Lauffer, Matthew S; Mellor, Colin; Midkiff, Eric; Ridings, Rob; Staley, Mark K; Jones, Brandon H; Thomas, Roger D; Wilson, Travis W.; Twisdale, John W; Wilkins, Ronald B; Qubain, Joseph; Cashin, Gordon E Subject:Revised Permit Application for B-4967, Hoke and Scotland Counties Follow Up Flag:Follow up Flag Status:Flagged A revised permit application for B-4967 has been prepared. The electronic copy can be viewed/downloaded at https://connect.ncdot.gov/resources/Environmental/ This email serves as our permit application submittal to the U.S. Army Corps of Engineers and the N.C. Division of Water Resources. Chris Rivenbark | Eastern Regional Manager | Environmental Coordination & Permitting Group Natural Environment Section | PDEA | N.C. Department of Transportation (919) 707-6152 office | (919) 212-5785 fax | crivenbark@ncdot.gov Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1 iransportatian November 30, 2015 Mr. Andy Williams U.S. Army Corps of Engineers Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Dear Mr. Williams: Subject: Additional information Drowning Creek on SF Counties, North Carolina. TIP Project B-4967. PRT McCRC7RY Covernor N[CHQ�.AS J. TEI'JNYSQN Secretary regarding the replacement of Bridge No. 8 over : 1203/1412 (Turnpike Road), Hoke and Scotland Federal Aid Project No. BRZ-1203(2), Reference: National Park Seroice letter to the U.S. Army Corps of Engineers dated November 4, 2015 As you are aware, the North Carolina Department of Transportation (NCDOT) proposes to replace the existing Bridge No. 8 over Drowning Creek on SR 1203/1412 (Turnpike Road) in Hoke and Scotland Counties, North Carolina. NCDOT has received a copy of the November 4, 2015 letter from the National Park Service (NPS) to the U.S. Army Corps of Engineers requesting additional information about the proposed bridge. The exisring Bridge No. 8 was built in 1951, and is considered in poor condition and structurally deficient with a sufficiency rating of 27.46 out of 100 for a new structure. This project is scheduled to be let for construction on June 21, 2016 due to its age and deteriorated condition. Specifically, the NPS requested additional information regarding 1) justification for placement of bridge abutments (i.e. width of the new span), 2) a description of impact avoidance measures associated with the removal of the old span, 3) a description of how the bridge design and aesthetics minimize the contrast of the structure with the surrounding environment, and 4) an evaluation of the potential recreational access to the river. These issues are addressed below: 1) Bridge abutment placement: The existing bridge is a 6 span structure (6 @ 35' - overall length=210'). Presently there are 3 bents within the normal water surface/ordinary high water. The new bridge will be a 3 span structure (1 @ 70'; 1@ 85 ; 1@ 70' box beam - overall length=225') and will have no bents within the normal water surface. Based on modeling the new bridge will result in minimal impact to backwater with slight decreases in 10, 25, and 100 yr storm events. 2) Impact avoidance measure associated with demolition: The existing bridge has a timber deck. Demolition will involve removal of the exiting beams, and under normal BMP's very little if �Nothing �Cornpares�,� State of North Carolina I Department of Transportation � PDEA-Natural Environment Section 1020 Birch Ridge Drive, 27610 I 1598 Mail Service Center � Raleigh, North Carolina 27699-1598 919-707-6000 T 919-212-5785 F any debris would fall into the creek. If it is absolutely necessary that no debris be allowed in the creek, tarps would have to be installed under the bridge to catch any small splinters of wood that fall during the removal of the deck. 3) Bridge design and aesthetics: No aesthetic treatments are planned for this structure. The Lumber River State Park indicated by e-mail dated February 24, 2014 that the proposed project "will not have any adverse effect on Lumber River State Park". The bridge is on a bike route so the bridge design includes 2-bar metal rails. According to the current state budget, we have been instructed that any aesthetic treatment above standard treatment will have to be paid for by the requesting party. 4) Recreational access: In addition to being bicycle route, there is a boat access just southwest of the project limits, and we are not impacting the access entrance during construction or after completion. Additionally, NCDOT also has updated information regarding the impacts of proposed utility work on B-4967. The relocation of power transmission poles will involve handclearing 0.03 acre of wetlands. Enclosed you will find the permit drawings depicting this work. If you have any questions or need additional information, please contact Gordon Cashin at (919) 707-6107. Sincerely, �r Richard W. Hancock, P.E., Manager Project Development and Environmental Analysis Unit cc: NCDOT Permit Application Standard Distribution List �f � � � �� �' �u, �ww � �, � Q o z � �--w �-� o�� z�� N� ��, OYW � � � � � � � � � � � � � � � � � � � � � � � � � � �� � � � � � I� � TO US 15-501 -- _L- SR 141 � " I � . �� " I � 1: (�)1 � \ (�) i'� " I � I-I � � . �� I'� (�)1.1 \ -� 11�I��I�I(�)\ (�>l� I-ll�il-I\\".�����; UTILITIES PERMIT PLA1�S SCOTLAI�D � HOI�E CO U1�lTY LOCATI0IV: BRIDGE 11t0.8 OVER DROW11tI11tG CREEK 011� SR 1412�SR 1203 (TURII�PIKE ROAD) l Yl'� V!' W Vl�lt: L l(HL�( JLV11 J Jl Vl�( L V WC1C l(CLV l.H 1 l VLV STA.13+75.00 -L- BEGIN TIP STATE PROJECT B-4967 STA.20+00.00 -L- END TIP STATE PROJECT B-4967 DROWNING CREEK � � � � � � � � � � / � � � � � � � � � � �,-�l I � � � � � I � � � � � , � � � � � - � j � � � �, -' , � � � � � � � eb�'�, i � . _ � _ , � � � � � ,,,, � � � i � Z� � � � ----- ` � a' � � � i �k I i Z _ _ _aw— — �I � � � � / s� j z�" �h ,� �' � T.LP. NO. seE�°� �vm. B-4967 U E-1 UTILITY PERMIT DRAWING SHEET 1 OF 3 NOV. 2, 2015 � I ' � �^' `?!=/ � Q; Y � � / / � � � �/ � � '�� ,�/ o = / / / � � � / � / � � � �� NI � � �� /��'��e`�/ z � � � ���� � ��f.s � �� � � .�l � � � � � � � , 4, / / � `k ,e � W � i � Y J � ,,, �/ / � �� l� i � � � ♦ (TURNPIKE ROAD) � �� � I _ -L- SR 1203 (TURNPIKE ROAD) �. � _.,.- ---- -----av-----------� --au__ -'-'--___ . . _____ --- � � � � � y ��� � �� /��- � � � '� � � � � � '� �- � � olz � � '��------- � � `� '.e U '� `k `k � � � � � � � � � B�GIN � BRIbGE � � � � k � ��Y � �� �� � � � � E / D BRIDGE �4B � � � -L- �STA. 15�+ 60.75 � � � � g�� � � � � � � -L- STA. 17 + . � � � � � � � �, � � � � ' � � � � � � � � � � � � � � a � � � � � � � � � � � � � � � � ( ,� � ��� � � � � � � � . �� i � � � � � � � � � � � . � � � DROWNING CRE�K � � r GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) � I11lDEX OF SHEETS SHEET NO. DESCRIPTIOIV UE-1 TITLE SHEET UE-2 UTILITY RELOCATION PLAN SHEETS � UTILITY OWNERS ON PROJECT (A) POWER ; LUMBER RIVER EMC // �, ii I/f/ I � ________ TO RqEFORD INCOMPLETE PLANS DO NOT I;SE FOR R/W ACQUISITION PRELIMINARY PLANS DO NOT U6& FOR CONSTRUCT[ON PREPARED IN THE OFFICE OF: DIVISION OF HIGHWAYS UTILITIES UNIT UTILITIES ENGINEERIIVG �O I555 MAIL SERVICES CENTER RALEIGH NC 2I699-I555 �g. PHONE (919) 707-6690 � OF THPNS� FAX (919) 250.-0/51 Roger Worthington, A.E. UTILITIES SECTION ENGlNEER Steve McKee, P.E. UT/L7TIES SQUAD LEADER PROfECT ENGINEER J.T. Yoon, P.E. UTILITIES PROJECT DESIGNER N Z O > W � HAND CLEARING FOR POWER TRANSMISSION LINE 0.018 / 0.0144 ACRE �� � � � � � � � � � � � I � � � m � � � � .---�, ``3 � � � � � ,� ' � 1 m � � � `� � � ' �g � � � � �, i m ��T ' ' , � � i � � . � � � � � � ,� � � ,� I ' � � ,� �k � � i � � � � � . ,� ,� � �PRO�OSED � , . - , , - - , , , � � ; ,�m � � � , �9�M � � � 30' �CLEARANCE ,, ' -." �'� � � � � � _ _ _ , — � � � � � �. � � z � � — — \ � � �� � �' I `� I �„ � —,M—� \ �EXI�,STING / ��R� �� ,—��e�� � zi �� � ,,�------ �� ,� '� ,� 25 CLE�ARANCE ;��' � — ,� � i �0 Q;w � ' PROJECT REFERENCE NO. B-4967 R�W SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. UE-2 HYDRAUUCS ENGINEER ][�]E�]E�,�iyl[�I�T�IEg� Il��,�I�T� I�� N�'JC U5E F��$ C�NS'J['RUCTd�N UTILITY PERMIT DRAWING SHEET 2 OF 3 NOV. 02, 2015 � `� � � W00 ' � � � Y � / , � � � �Q � � � �I � 50��, � �k � � ��/ � U = / . WOODS J� / � ¢ � i � � .' v� � i0�� � ,� `� `K ,� � i��� � ' � ' ' � � ~ � i ��i � . � � � � � � � WO�DS � � `K � � '� ��� � � ��� � ; � � �Pi i . � C� i � � � � � � � � � � � � � ���i � �K � � � — � � / / � � "fRANSI / ' � � � � PROP 0/H POW LINES � ��\/ �K `K � `� � `K `K � � WLB — — �` — — -� � / / POW IINES l � � J m `� E (TRANS /� P ' �8� , / `K — � � � � � ,� � � � — — ' / � �EXISTING R/W � i i F EXISTING R/W PR P 0/H POW LINES (TRANS) — — — ��WLB� ��� /'/ � � -----� m _ —� �------ � I IO � � � �NE��ANSI o � � ` i � --- ~ --- -- m ---- � o i , PROP 0/H POW I I(�, TURN KE ROAD (SR 1203 & l4/2J � TO US 15-50/ pp OIN P�W E#8 = W D& STEEL BRIDG WIT AVED DECK O— ` LINES (TRANS)� �— .3.3� .3 � 4 .7�� � l9' PAVED ROADWAY sl I Io � --- --- — ---- � � T0 RAEFORD �PROP OIH POW LINES I�RAN F — — — — -� \ il _ _ — � � _ F .. - F ' ' � ► _ I� EXISTING R/W �� � F �— — — — — — — 9�M � 8lM � LL�� — m / � � `k -�i1' � �_ -. � ---- --- \ _ _-� F � � � � E-�7� F � \ r ODS � `K � �' rn � � � � ,� � � � ,� � � � � — E P D —�+i � ,� ��D E � E �^K � � � �K . z I �- � � / � ,� ��f- m . ,,� -w�a------- � `K � o z `K —L— STA. 1�3 + 75'� 00 B�€GI N � ST TE PRkOJ ECT 6-4967 � � � � � � � � o � � � � � i� W000s � z � � � \��e � ,� � � � � `� � � � Q � � � : � � '� / \ � �K � � � � � � � o I o `� ,� � � ,� / � � � � �K �K � � � � `� ,� � m � '' . 'x � '� \ \ � � � � � � � � � � � � � i � � � � � ; m � � �� � � � `� `� `� `� � � `� � m� I II ' � � � � I � � � � � � � � � � �� UTILITY COMPANY ALREADY CLEARED THIS AREA FOR EXISTING LINE'� r���� . . . . � � �� EXISTING R/W �- -L— STA. 20 + 00.00 END STATE PROJECT B-4967 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 15+33.49 TO 15+87.56 LT POWER TRANSMISSION LIN 0.02 -L- 17+12.56 TO 17+53.93 LT POWER TRANSMISSION LINE 0.01 TOTALS*: 0.03 0 0 0 NOTES: EXISTING TRANSMISSION LINE HAS 25' CLEARANCE FROM THE LINE AND UTILITY COMPANY HAS ALREADY CLEARED THIS AREA. PROPOSED TRANSMISSION LINE WILL HAVE 30' CLEARANCE AND UTILITY COMPANY NEEDS ADDITIONAL HAND CLEARING. �REVISED 11/ 2/ 2015