HomeMy WebLinkAboutNCC240792_ESC Approval Submitted_20240319 .1---4 ,.\ ,) _...., ROCKY MOUNT ENGINEERING 'r1E CENTER OF IT AFL LETTER OF APPROVAL FOR SEDIMENTATION & EROSION CONTROL March 15, 2024 A.R. Chesson Construction Company, Inc PO Box 1147 Williamston, NC 27892 Re: Project Name: Wawa #5902 Permit Number. muni code Location: 2022-02058 Submitted By: Nadean Shovels, FIT, Kimley Horn Acres Approved 2.54 acres To whom it may concern: This office has reviewed the subject erosion and sedimentation control plan sealed by Robyn M. Niss, PE on November 22, 2022. We find the plan to be acceptable and hereby issue this letter of approval. This letter of approval shall be valid for a period not to exceed twenty-four months from receipt of initial approval letter (original approval letter is dated January 12, 2023) or the time required for the proposed construction activities, whichever comes first. Please be advised that Section 801, Sub-section E12 of the City of Rocky Mount's Land Development Code(hereinafter referred to as LDC)requires that a copy of the approved erosion control plan he on file at the job site. Also, you should consider this letter the notice required by the LDC, Section 802, Sub-section Q1 of our right of periodic inspection to ensure compliance with the approved plan. The City of Rocky Mount's Sedimentation Pollution Control Program is performance oriented, requiring protection of the natural resources and adjoining properties. It' following the commencement of this project,it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Soil Erosion and Sedimentation Control Ordinance of the City of Rocky Mount(Section 801 of the LDC, also NCGS 113A-51 through 66,)this office will require revisions to the plan and implementation of the revisions to ensure compliance with the (254 972-1121 / 331 S Franklin St.,PO Box 1180,Rocky Mourn,NC 27807-1180 / www rockymountnc gay Ordinance. Performance Reservations for this plan are included as part of this approval. The developer is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out, is necessary anytime the device is at 50°A) capacity. Please be aware that this approval is based in part on the accuracy of the information in the Financial Responsibility/Ownership Form, which you have provided. You are required to file an amended form if there is any change in the information included on the form. Also, please note that this approval does not relieve the pennittee of the responsibility to obtain any other Federal, State, or Local approvals or permits. The responsible party may need to contact the appropriate Federal, State, and Local agencies prior to beginning work. This approval does not permit the construction of any impervious surface, nor does it allow for the placement of fill in any area for which a floodplain development permit is required. In addition,LDC Section 801-E10 requires that you notify this office of the proposed starting date for this project. Your cooperation is appreciated,and we look forward to working with you on this project. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the applicable annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form and fee details may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $120 fee will be charged annually. This fee must be sent to the DEMR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. (252)972-1325 / 331 S.Franklin St.,PO Box 1180,Rocky Mount,NC 27802-1180 / www.rockymountnc.gov2 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Please complete the e-NOI submittal process as soon as you receive this letter for the subject site. Please visit: https://deq.nc.gov/NCGO1 The General Contractor or delegated agent is required to set up a Pre-construction meeting (before construction begins) with the Control Inspector. Sincerely, Gabrielle Bryson Stormwater Engineer City of Rocky Mount 252-972-1340 (252)972-1325 / 331 S.Franklin St.,PO Box 1180,Rocky Mount,NC 27802-1180 / www.rockymountnc.gov3