HomeMy WebLinkAboutNCC240798_ESC Approval Submitted_20240319 Wake County Environmental Services Department
Water Quality Division,Watershed Management Section
336 Fayetteville St. • P.O. Box 550• Raleigh, NC 27602
WAKE TEL 919 856-7400 • FAX 919 743-4772
COUNTY
NORI II(ARI)I IN.
SECSLPA- SEDIMENT AND EROSION CONTROL SINGLE LOT PLAN APPROVAL
Project Name Kreitlow Residence Watershed Swift Jurisdiction Wake
Date Processing
Date Received 02/21/2024 Initiated 02/21/2024 Project Number SEC-119048-2024
Disturbed
Acreage 0.99 Plan Review Fee $100 PAID Permit Fee $248 PAID
Financially Responsible Party(FRP): Engineer/Surveyor/Consultant:
Name Kelly& Kimberly Kreitlow Alan Keith/DIEHL& PHILLIPS, PA.
Address: 710 Eastridge Drive,Apex, NC 27539 1500 Piney Plains Road Cary, NC 27518
Phone: 909-605-4999 919-880-4381
Email: Kelly.kreitlow@dynamicdevices.com ARKEITH@BELLSOUTH.NET
Plan Date/Revision Date: 02/21/2024
Approval Date:
03/11/2024 ® Construction Plan Approved with the following Conditions of Approval and Applicable Standards:
Next Steps:
1. Read any project specific conditions of approval required before permit issuance above and address them prior to
preconstruction meeting.
2. Obtain NCGO1 coverage from NCDEQ. See"How to Apply for a Certificate of Coverage."
3. Upload a copy of the NCGO1 Certificate of Coverage to the Wake County Permit Portal under SEC-119048-2024
"Attachments." Click"Add Attachment"on that permit record to upload.
4. Contact Karyn Pageau at 919-796-8769/Karyn.Pageau@wake.gov for the preconstruction meeting. This is typically
held over the phone for lot construction. Provide any hard copies of the plan,if required by your inspector.
5. The County inspector will issue the SEC land disturbance permit,and the permit status in the Portal will change to
"Issued." The SEC permit will be available as an attachment on the Portal for you to download and sign.
6. Sign and upload the SEC permit to the Wake County Permit Portal under SEC-119048-2024"Attachments."
7. Install the erosion and sedimentation control measures shown on the approved plan (construction entrance,silt
fence,etc.)within the limits of disturbance shown on the approved plan.
8. Complete and upload the Certificate of Compliance (along with photos of the measures)to the Wake County Permit
Portal under SEC-119048-2024"Attachments."
9. Begin construction.
1
APPROVAL S&ELotPlanReviewChecklist-V.1 WM
Wake County Environmental Services Department
Water Quality Division,Watershed Management Section
WAKE 336 Fayetteville TEL 919 856-7400• FAX 1919 743 4gh, NC 672
772
COUNTY
\'1121 II(.41t1I"'
SECSLPA-SEDIMENT AND EROSION CONTROL SINGLE LOT PLAN APPROVAL
Conditions of Approval
Items marked with an "X"were noted as conditions of the Sediment and Erosion Control Plan approval. Unless otherwise
noted,all references shown in brackets are for the Wake County Unified Development Ordinance(UDO),adopted 04/17/06.
A mandatory preconstruction meeting is required between the owner,contractor,and Wake County prior to
® 1. issuance of the Land Disturbance Permit.The permit fee is due at that time.[10-30-7(C)]Contact Karyn Pageau
at 919-769-8769 to schedule the preconstruction meeting and provide hard copy plan set(s)per direction.
® Grading,other than for installation of soil erosion and sedimentation control measures, is prohibited prior to
2.
the issuance of a Certificate of Compliance.(10-30-7(D)]
Contractor shall follow plans strictly and maintain contact with Wake County prior to making any field
® 3. modifications to erosion and sediment control devices. No devices shall be removed without prior approval
from Wake County.
Wake County's sedimentation pollution control program is performance oriented, requiring protection of the
natural resources and adjoining properties. If at any time during the project it is determined that the Erosion
® 4. and Sedimentation Control Plan is inadequate to meet the requirements of the Erosion and Sedimentation
Control Ordinance of Wake County,this office may require revisions in the plan and its implementation to
ensure compliance with the Ordinance.
As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of
Intent(eN01)form requesting a Certificate of Coverage(COC) under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions
for the applicable annual permit fee. After the fee is processed,you will receive the COC via email. As the
® 5. Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOl form and fee details may be accessed
at deq.nc.gov/NCG01. Please direct questions about the eNOl form to the Stormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future,the new responsible
party must obtain a new COC.
SUBDIVISIONS ONLY Builders are required to obtain grading permits for cumulative disturbance over one acre
(including non-contiguous lots). Builder must ensure land disturbance does not impact septic field or repair
® areas. Please note silt fence trenching,stockpiling, and grading on site can impact these areas. If the site needs
6' to be prepped for septic evaluation, please follow attached Site Evaluation Requirements. If you have any
questions about the potential to impact your septic permit, please contact onsite wastewater staff at 919-856-
7434. If septic approval conflicts with Land Disturbance Plan revise plans accordingly.
Applicable Regulations Unless otherwise noted,all references shown in brackets are for the Wake County Unified
Development Ordinance(UDO), adopted 04/17/06.
10-30-6 Validity of Plan,Lapse of Approval-An approved erosion and sedimentation control plan is valid for 2
® 7. calendar years from the date of approval. If a land disturbance permit has not been obtained within the 2-year
period,the erosion and sedimentation control plan approval becomes null and void.
® 8. 10-30-8 Actions Required Prior to Land Disturbance
S&EC plan approval and land disturbance permit issued must be prominently displayed until all
a. construction is complete,all permanent sedimentation and erosion control measures are installed,and
the site has been stabilized.A copy of the approved plan must be kept on file at the job site.
® b No person shall initiate a land-disturbing activity until notifying Wake County of the date that the land-
disturbing activity will begin.
® 9. 10-31-1 Authority
2
APPROVAL S&ELotPlanReviewChecklist-V.1 WM
Wake County Environmental Services Department
Water Quality Division,Watershed Management Section
WAKE 336 Fayetteville TEL 919 856-7400• FAX 1919 743 4gh, NC 672
772
COUNTY
\'1121 II(.41t1I"'
SECSLPA-SEDIMENT AND EROSION CONTROL SINGLE LOT PLAN APPROVAL
County officials may enter any property, public or private,at reasonable times for the purpose of
investigating and inspecting the sites of any land-disturbing activity. No person shall refuse entry or access
® a. to any authorized representative or agent for the County who requests entry for purposes of inspections,
and presents appropriate credentials, nor shall any person obstruct, hamper,or interfere with any such
representatives while in the process of carrying out their official duties.
Agents and officials of the County will periodically inspect land-disturbing activities to ensure compliance
® with the North Carolina Sedimentation Pollution Control Act,this article,or rules or orders adopted or
b. issued pursuant to this article,and to determine whether the measures required in the erosion and
sedimentation control plan are effective in controlling erosion and sedimentation resulting from land-
disturbing activity.
® Any land-disturbing activity will be the responsibility of the person(s)conducting the land disturbing
c. activity, including the property owners. Failure to prevent off site sedimentation will be deemed a
violation of the erosion and sedimentation control regulations of this article.
15A NCAC28.0714-Due to the location of this project, it should be noted that a rule to protect and maintain
existing buffers along watercourses in all of Wake County became effective in 2006.The Neuse River Riparian
Area Protection and Maintenance Rule applies to all perennial and intermittent streams, lakes, ponds,and
estuaries in Wake County with forest vegetation on the adjacent land or"riparian area". In riparian areas with
existing forest vegetation in the first 30 feet directly adjacent to the stream,the rule prohibits land disturbance,
® 10. new development and fertilizer use within the first 50 feet of land next to the water. In riparian areas with
forest vegetation that is less than 30 feet wide,the rule prohibits land disturbance, new development and
fertilizer use within the area that contains forest vegetation (but not the entire 50-foot riparian area). For more
information about this riparian area rule, please contact the Division of Water Quality's Wetland/401 Unit at
919-707-3631 Wake County enforces the Neuse Buffer Rules in both the Cape Fear River Basin and the Neuse
River Basin except when superseded by the Jordan Buffer Rules [15A NCAC 02B.0265].
Other:
a. If lots other than those approved with this plan will be disturbed in the future,a plan revision
11. and associated paperwork(including updated Financial Responsibility Ownership(FRO)form)
must be submitted and approved to include them within the limits of disturbance.
Wake County Watershed Management Section is not responsible for subject approvals of other Local,State or Federal Agencies.The
subject approvals are (but not limited to) Federal Emergency Management Area Flood regulations/requirements, Division of Water
Quality under stormwater or other water quality regulations/requirements, U.S. Army Corps of Engineers under Article 404/401
(Wetlands/Streams) jurisdiction/requirements, and/or any Federal, State, County and Local municipal regulations or permit
requirements. The approval issued in this letter cannot supersede any other required permit or approval.
Environmental Karyn Pageau,El, Contact Info: Karyn.Pageau@wake.gov
Consultant: CPESC,CESSWI 919-796-8769
EnvironmentalXtvit,
Kevin.Zelaya@wake.gov
Engineer: Contact Info: 919-856-7473
Kevin Zelaya, PE
3
APPROVAL S&ELotPlanReviewChecklist-V.1 WM