HomeMy WebLinkAboutWQ0003687_Monitoring - 01-2024_20240205Monitoring Report Submittal
Permit Number#*
Name of Facility:*
Month: * January
Report Information
WQ0003687
GOLD HILL AIRPARK
Type *
NDMR, NDAR-1, NDAR-2, NDMLR
Year:* 2024
Upload Document*
GOLD HILL AIRPARK NDAR AND NDMR
JANUARY2024.pdf
PDF Only
1.09MB
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59).
Confirmation Email Address: * flylancair1 @yahoo.com
Name of Submitter: * William Rumburg
Signature:
e;V';-&?iw t9
Date of submittal: 2/5/2024
This will be filled in automatically
Initial Review
Reviewer: Wanda.Gerald
Is the project number correct?* W00003687
Is the monitoring report accepted?* Yes NO
Regional Office* Mooresville
Reviewer: _anonymous
Review Date: 3/19/2024
FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page _1 of _2_
Permit No.: Q111 .:
• • Hill AirparkRowan
irrigation
• occur
(acres):
Area (acres)._
at this facility?
CoverArea
..
YES■ •
•.
•Hourly
Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
I Annual Rate (in):
Annual Rate (in):
Field Irrigated?
Monthly Load'
•1
1
•
;%/%/i�
• ••
�/�
•
1 •1���/
PZIII11114
• •
low
12 Month•. •
FORM NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page _2_ of _2_
Did the application rates exceed the limits in Attachment B of your permit?
0 Compliant ❑ Non -Compliant
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
❑Q Compliant
❑ Non -Compliant
Was a suitable vegetative cover maintained on all sites as specified in your permit?
❑Q Compliant
❑ Non -Compliant
Were all setbacks listed in your permit maintained for every application to each permitted site?
❑� Compliant
❑ Non -Compliant
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
❑� Compliant
❑ Non -Compliant
If the facility is non -compliant, please explain In the space below the reason(s) the facility was not in compliance Provide in your explanation the date(s) of
the non-compliance and describe the corrective
action(s) taken Attach additional sheets if necessary
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: William James Rumburg
Permittee:
Gold Hill Airpark
Certification No.: 1010636
Signing official: William James Rumburg
Grade: Phone Number: 980-332-0179
Signing Official's Title: ORC
Has the ORC changed since the previous NDAR-1? ❑ Yes 0 No
Phone Number: 980-332-0179 Permit Exp.: 5/31/26
i
Signature ate
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge
I certify. under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with
a system designed to assure that all qualified personnel property gathered and evaluated the information submitted. Based on my inquiry
of the person or persons who manage the systemor those persons directly responsible for gathering the information, the information
submitted is, to the best of my knowledge and belief true, accurate, and complete I am aware that there are significant penalties for
submitting false information, including the possibility of fines and imprisonment for knowing violations
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM NDMR 10-13 NON -DISCHARGE MONITORING REPORT (NDMR) Page _1 of 2_
Permit No.: W00003687
Facility Name: Gold Hill Airpark
County: Rowan
Month: January
. •. o ■ ■
., ■ o ■ ■
®gym
� • �
®��������������
Monthly Avg Limit:!
FORM. NDMR 10-13 NON -DISCHARGE MONITORING REPORT (NDMR) Page 2 of 2
Sampling Person(s) 11 Certified Laboratories
Name: William James Rumburg Name:
Name: Name:
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑ Compliant ❑ Non -Compliant
If the facility Is non -compliant, please explain In the space below the reason(s) the facility was not In compliance. Provide In your explanation the dates) of the non-compliance and describe the corrective
action(s) taken Attach additional sheets if necessary
Operator in Responsible Charge (ORC) Certification Permittee Certification
ORC: William James Rumburg Permittee: Gold Hill Airpark
Certification No.: 1010636 Signing Official: William James Rumburg
Grade: Phone Number: 980-332-0179 Signing Official's Title: ORC
Has the ORC changed since the previous NDMR? ❑ Yes 0 No Phone Number: 980-332-0179 Permit Expiration: 5/31/2026
I
011 / ! /
Signature C' Date
By this signature. I certify that this report is accurrate and complete to the best of my knowledge
7 v ! I r
Signature Date
I certify under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualfied personnel properly gathered and evaluated the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am aware that
there are significant oenalbes for submitting false information, including the possibility of fines and imprisonment for knowing
violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617