HomeMy WebLinkAboutNC0026123_Authorization to Construct_198208200..)g0 Xflocs
North Carolina Department of Natural
Resources &Community Development
James B. Hunt, Jr., Governor Joseph W Grimsley, St .retary
DIVISION OF ENVIRONMENTAL MANAGEMENT August 20, 1982
Mr. Thomas J. McIntosh
City Manager
City of Asheboro
P. 0. Box 1106
Asheboro, North Carolina 27203
Subject:
Dear Mr. McIntosh:
WATER QUALITY
1111AT11INS
Permit No. NC 0 3'
Authorization to Construct
City of Asheboro
Asheboro Wastewater Treatment Plant
Improvements
EPA Project No. C370403-02
Final plans and specifications for the subject project have been
reviewed and found to be satisfactory. Authorization is hereby granted
for the construction of improvements to expand the existing 4 MGD Ash.bcro
Wastewater Treatment Plant to 6 MGD by new construction of one manual
and one mechanical bar screen, one aerated grit chamber, influent flow
m:easur ng, one primary clarifier, modifications to the existing trickling
filter pump station, one new trickling filter, a nitrification pump stations
a 3 stage/2 train pure oxygen type nitrification basic:, three final clari-
fiers with return sludge station, pure oxygen generation (PSA) and stan:i-
by oxygen (LOX) storage facilities, ozone generation-disi:.fection facili-
ties, polymer/caustic feed and storage facilities, new sludge thickering
facilities and improve rents to existing facilities, a dual digestion
system consisting of two new aerobic digesters and improvements to thc�
two existing anaerobic digesters and new gas -.ti'ization equipment,
improvements to the existing maintenance and laboratory buildings, and
in -plant flow metering and sampling equipment.
You are cautioned no: to advertise nor proceed with construction until
so notified by EPA.
.This is Class Four Wastewater. Treatment Plant and the operatc�- i-.
responsible charge must hold a v,:lid Grade Four certificate.
1Nr,TER QU IUTv .
Authorization to
City of Asheboro
8/20/82
Page # 2
This Authorization to Construc. shall be subject to revocation
unless:
l) The properd facilities are constructed in accordance with the
approved rla►s, specificati--s, and supporting documents.
2) The pror-.-.ed facilities are in compliance with the conditions
and lim:.(.:ations as specific in Permit No. NC0026123.
3) The propti�-ad nitrification -eatment system is placed in complete
operation prior to taking t, existing trickling filter pump
station of service for i� irovemer,ts .
One (1) set :f final approved p:z,s and specifications is to be
forwarded to you, ^::e (1) set to the : ivironmental Protection Agency (EPA),
and two (2) sets ::ro the Corps of Eng� . ers. You will be notified by EPA
when to advertise -or bids to constru- this project.
'incerely,
Original Signed By
'ALTER D. TAFT, JR.
:'alter J. Ta;t, Jr., Chief
.onstruction Grants Section
cc: Ro-ndolph Cou-.c;• health Department:
Moore, Gardr.r•; and Associates (A ;1 eboro)
Mr. David Cc::a::r
ti,s . Brenda C::c�sen
±r. Russell :.:r_ford
Mr. Robert c
,;r . Herbert '-c-u-a► art
Mr. BS)*b ;att;-
GPF
EY:�