Loading...
HomeMy WebLinkAboutNCS000430_Montreat Final Draft SWMP_20240223 SWMP TEMPLATE INSTRUCTIONS 1. Additional guidance for using this Stormwater Management Plan (SWMP) Template can be found on the DEQ stormwater web page at https:lldeg.nc. og v.sw under the NPDES MS4 Program Forms & Resources tab, in the MS4 Toolbox. It is strongly recommended that the posted instructional SWMP webinar be viewed prior to beginning development of the SWMP. 2. An MS4-specific Annual Self-Assessment (ASA) Template will be developed based upon the approved Final SWMP. This ASA will be an Excel spreadsheet that lists each SWMP measurable goal and reporting metric for each reporting year. Please be aware that the responses must be brief and answers of Yes/No/Partial, a quantity, or a date are the preferred reporting metrics. There is a small character limited comment box to provide the status of each entry, but there is no option to attach documents to the ASA. 3. The SWMP Template has instructions embedded in the document. They are always highlighted: Red italicized text with gray highlighting denotes an instruction or guidance that should be deleted from the document after completion. For example, [insert a map]. Plain highlighted text indicates an item that must be edited to provide the appropriate information, for example: o has/has not would be replaced with either has or has not o Document Date would be replaced with the date, written as February 6, 2019 or 02/06/2019 o Permit Number NCSOOOxxx would be replaced with the NPDES MS4 permit number assigned by DEQ (e.g. NCS000300). 4. The SWMP Template has standard text that should not be edited or deleted, including all listed permit conditions and some provided BMPs. The provided text works hand in hand with the 2021 Permit Template to define a compliant MS4 program. 5. Number the BMPs in the tables consecutively, starting with BMP No. 1. Do not restart numbering in each BMP table. The consecutive numbering supports quick referencing of the individual table cells (e.g. BMP 1.B.1 or BMP 15.C.3). 6. Add or delete rows to enter as many BMPs and Measurable Goals as are necessary to satisfy each permit requirement. 7. Each BMP should answer three basic questions and the reporting metric should, ideally, represent what the MS4 will use to evaluate whether the BMP/Measurable Goal is successful/useful ornot: a. What will be done? Describe the specific task(s) to be completed. b. When will it be completed? Include a frequency and applicable permit year(s). c. How will it be measured and reported to DEQ each year? See Item 2 above. 8. Do not change "Draft" on the SWMP document until DEQ provides instructions in writing to change the title to Draft Final or Final. 9. Helpful Hints: • Search and replace "MS4name"with the name of the municipality (e.g. City of Smithville)throughout the document. • Think through BMP commitments, timing and available vs. needed resources. Establish reasonable time frames to complete the program goals by the end of the 5- year permit term. The MS4 will be accountable for the commitments and timing provided. • Identify components that need to be in place prior to BMP implementation and consider whether they should be included as interim tasks/steps towards compliance (e.g. developing tracking spreadsheets, staff training, etc.). • The Division will specifically request additional information if needed to approve the Final SWMP. • Clear and concise wording is strongly recommended. • It is recommended that an MS4 not include extraneous information,because it becomes an enforceable component of the permit. Draft Final Stormwater Management Plan Town of Montreat NCS000430 February 2024 TovvN OF MONTREAT NORTH CAROUNA Table of Contents PART 1: INTRODUCTION........................................................................................................................I PART2: CERTIFICATION........................................................................................................................2 PART 3: MS4 INFORMATION..................................................................................................................3 3.1 Permitted MS4 Area.....................................................................................................................3 3.2 Existing MS4 Mapping.................................................................................................................3 3.3 Receiving Waters..........................................................................................................................4 3.4 MS4 Interconnection.....................................................................................................................4 3.5 Total Maximum Daily Loads(TMDLs) .......................................................................................5 3.6 Endangered and Threatened Species and Critical Habitat............................................................5 3.7 Industrial Facility Discharges.......................................................................................................5 3.8 Non-Stormwater Discharges.........................................................................................................6 3.9 Target Pollutants and Sources.......................................................................................................6 PART 4: STORMWATER MANAGEMENT PROGRAM ADMINISTRATION.....................................8 4.1 Organizational Structure...............................................................................................................8 4.2 Program Funding and Budget..................................................................................................... 10 4.3 Shared Responsibility.................................................................................................................10 4.4 Co-Permittees.............................................................................................................................. 11 4.5 Measurable Goals for Program Administration..........................................................................I I PART 5: PUBLIC EDUCATION AND OUTREACH PROGRAM.........................................................13 PART 6: PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM...........................................16 PART 7: ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM..............................18 PART 8: CONSTRUCTION SITE RUNOFF CONTROL PROGRAM...................................................21 PART 9: POST-CONSTRUCTION SITE RUNOFF CONTROL PROGRAM........................................23 PART 10: POLLUTION PREVENTION AND GOOD HOUSEKEEPING PROGRAMS......................28 List of Tables Table 1: Summary of MS4 Mapping Table 2: Summary of MS4 Receiving Waters Table 3: Summary of Approved TMDLs Table 4: Summary of Federally Listed Species/Habitat Impacted by Surface Water Quality Table 5: NPDES Stormwater Permitted Industrial Facilities Table 6: Non-Stormwater Discharges Table 7: Summary of Target Pollutants and Sources Table 8: Summary of Responsible Parties Table 9: Shared Responsibilities Table 10: Co-Permittee Contact Information Table 11: Program Administration BMPs Table 12: Summary of Target Pollutants&Audiences Table 13: Public Education and Outreach BMPs Table 14: Public Involvement and Participation BMPs Table 15: Illicit Discharge Detection and Elimination BMPs Table 16: Qualifying Alternative Program Components for Construction Site Runoff Control Program Table 17: Construction Site Runoff Control BMPs Table 18: Qualifying Alternative Program(s) for Post-Construction Site Runoff Control Program Table 19: Summary of Existing Post-Construction Program Elements Table 20: Post Construction Site Runoff Control BMPs Table 21: Pollution Prevention and Good Housekeeping BMPs PART 1: INTRODUCTION The purpose of this Stormwater Management Plan(SWMP)is to establish and define the means by which the Town of Montreat will comply with its National Pollutant Discharge Elimination System(NPDES) Municipal Separate Storm Sewer System(MS4)Permit and the applicable provisions of the Clean Water Act to meet the federal standard of reducing pollutants in stormwater runoff to the maximum extent practicable. This SWMP identifies the specific elements and minimum measures that the Town of Montreat will develop,implement,enforce,evaluate and report to the North Carolina Department of Environmental Quality(NCDEQ)Division of Energy,Minerals and Land Resources(DEMLR)in order to comply with the MS4 Permit number NCS000440, as issued by NCDEQ. This permit covers activities associated with the discharge of stormwater from the MS4 as owned and operated by the Town of Montreat and located within the corporate limits of the Town of Montreat. In preparing this SWMP,the Town of Montreat has evaluated its MS4 and the permit requirements to develop a comprehensive 5-year SWMP that will meet the community's needs, address local water quality issues and provide the minimum measures necessary to comply with the permit. The SWMP will be evaluated and updated annually to ensure that the elements and minimum measures it contains continue to adequately provide for permit compliance and the community's needs. Once the SWMP is approved by NCDEQ, all provisions contained and referenced in this SWMP, along with any approved modifications of the SWMP,are incorporated by reference into the permit and become enforceable parts of the permit. Any major changes to the approved SWMP will require resubmittal, review and approval by NCDEQ,and may require a new public comment period depending on the nature of the changes. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 1 PART 2: CERTIFICATION By my signature below I hereby certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is,to the best of my knowledge and belief,true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. I am also aware that the contents of this document shall become an enforceable part of the NPDES MS4 Permit, and that both the Division and the Environmental Protection Agency have NPDES MS4 Permit compliance and enforcement authority. ® 1 am a ranking elected official. ❑ I am a principal executive officer for the permitted MS4. ❑ I am a duly authorized representative for the permitted MS4 and have attached the authorization made in writing by a principal executive officer or ranking elected official which specifies me as(check one): ❑ A specific individual having overall responsibility for stormwater matters. ❑ A specific position having overall responsibility for stormwater matters. Signature: Print Name: Timothy R. Helms Title: Mayor Signed this 24th day of October 2022. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 2 PART 3: MS4 INFORMATION 3.1 Permitted MS4 Area This SWMP applies throughout the corporate limits of the Town of Montreat,including all regulated activities associated with the discharge of stormwater from the MS4. The map below shows the corporate limits of Town of Montreat as of the date of this document. Montreat 5tormwater Permitted outfalls 1 2 5tormwater Features r s Inlet A Issue q ■ Junction - • Dutfall ■ ■ SCM Pipes ■■ �■ �.�° Town Boundary r+ wo CS Jr.`♦� Q,0 'E 4s ie� 1r Montreat Stormwater o. nii Buncombe County,NC,State of North Carolina DOT,Esri,HERE,Garmin,GeoTechnologies,Inc.,NGA,USGS 3.2 Existing MS4 Mapping The current MS4 mapping includes mapping includes inlets and catch basins,pipes with flow direction, outfalls and receiving waters. Major outfalls are identified in a separate data layer. Information such as material,depth,diameter,and condition are also recorded,and a photo is linked to inlets and outfalls. The stormwater system map is hosted by Land of Sky Regional Council and available online: https://arcg.is/b 108K FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 3 Table 1: Summary of Current MS4 Mapping Percent of MS4 Area Mapped 100 % No. of Major Outfalls* Mapped 5 total *An outfall is a point where the MS4 discharges from a pipe or other conveyance(e.g. a ditch) directly into surface waters. Major outfalls are required to be mapped to meet permit requirements. A major outfall is a 36-inch diameter pipe or discharge from a drainage area> 50-acres; and for industrial zoned areas a 12-inch diameter pipe or a drainage area> 2-acres. 3.3 Receiving Waters The Town of Montreat MS4 is located within the French Broad River Basin and discharges directly into receiving waters as listed in Table 2 below. Applicable water quality standards listed below are compiled from the following NCDEQ sources: o Waterbody Classification Map o Impaired Waters and TMDL Map o Most recent NCDEQ Final 303 d List Table 2: Summary of MS4 Receiving Waters Receiving Water Name Stream Water 303(d)Listed Parameter(s) Index/AU Quality of Interest Number Classification Flat Creek 6-78-6-(1), 6-78-6- 4 C,HQW N/A Big Piney Branch 6-78-6-5 C,HQW N/A Little Piney Branch 6-78-6-7 C N/A Puncheon Branch 6-78-6-6 C N/A Kitchen Branch 6-78-6-6-1 C N/A 3.4 MS4 Interconnection The Town of Montreat MS4 is not interconnected with another regulated MS4 and directly discharges to the receiving waters as listed in Table 2 above. The MS4 does not interconnect with the statewide NCDOT MS4. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 4 3.5 Total Maximum Daily Loads (TMDLs) No total maximum daily loads have been established in the MS4, as determined by the map and list provided on the NCDEQ Modeling&Assessment Unit web page. There is a statewide TMDL for mercury;however,the French Broad River Basin was not an area of concern. The following link provides additional information on the NC Statewide Mercury TMDL. https://files.nc.gov/ncdeq/Water%20Quality/Planning/TMDL/FINAL%20TMDLS/Statewide/NCMercury TMDL_EPASubmit.pdf 3.6 Endangered and Threatened Species and Critical Habitat Significant populations of threatened or endangered species and/or critical habitat are identified within the regulated MS4 urbanized area. Based upon a review of the Endangered and Threatened Species and Species of Concern by County for North Carolina Map and Listed species believe to or known to occur in North Carolina map as provided by the U.S. Fish and Wildlife Service,the species listed in Table 4 have the potential to occur within the regulated MS4 urbanized area. Of those species listed, Table 4 summarizes the species that may be significantly impacted by the quality of surface waters within their habitat. Table 4: Potential Federally Listed Species/Habitat Impacted by Surface Water Quality Scientific Name Common name Species Group Federal Listing Status Alasmidonta raveneliana Appalachian elktoe Invertebrate E Clemmys muhlenbergii bog turtle Reptile T Glaucomys sabrinus Carolina northern Mammal E coloratus flying squirrel Myotis grisescens Gray bat Mammal E Sarracenia rubra Mountain sweet Vascular Plant E ss .'onesii pitcher-plant Myotis septentrionalis Northern Long-Eared Mammal T Bat 3.7 Industrial Facility Discharges The Town of Montreat MS4 jurisdictional area does not have any industrial facilities which hold NPDES Industrial Stormwater Permits, as determined from the NCDEQ Maps &Permit Data web page. Table 5: NPDES Stormwater Permitted Industrial Facilities Permit Number Facility Name None FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 5 3.8 Non-Stormwater Discharges The water quality impacts of non-stormwater discharges have been evaluated by the Town of Montreat as summarized in Table 6 below. The unpermitted non-stormwater flows listed as incidental do not significantly impact water quality. The Town of Montreat has evaluated residential and charity car washing for possible significant water quality impacts. The town does not perform street washing. Street washing discharges are addressed under the Pavement Management Program in Part 10 of this SWMP. The Division has not required that other non-stormwater flows be specifically controlled by the Town of Montreat. Wash water associated with car washing that does not contain detergents or does not discharge directly into the MS4 is considered incidental. However,these types of non-stormwater discharges that do contain detergents have been evaluated by the Town of Montreat to determine whether they may significantly impact water quality. According to the 2022 Integrated Report,the portions of the Flat Creek receiving discharges from the MS4 are meeting water quality criteria for parameters such as pH and dissolved oxygen,which indicates that there is not an issue with detergent runoff. Table 6: Non-Stormwater Discharges Non-Stormwater Discharge Water Quality Impacts Water line and fire hydrant flushing Incidental Landscape irrigation Incidental Diverted stream flows Incidental Rising groundwater Incidental Uncontaminated groundwater infiltration Incidental Uncontaminated pumped groundwater Incidental Uncontaminated potable water sources Incidental Foundation drains Incidental Air conditioning condensate Incidental Irrigation waters Incidental Springs Incidental Water from crawls ace pumps Incidental Footing drains Incidental Lawn watering Incidental Residential and charity car washing Possible Flows from riparian habitats and wetlands Incidental Dechlorinated swimming pool discharges Incidental Flows from firefighting activities Incidental 3.9 Target Pollutants and Sources In addition to those target pollutants identified above,the Town of Montreat is not aware of other significant water quality issues within the permitted MS4 area. A 205j-funded stream assessment and water quality testing in 2020 found that Flat Creek and its tributaries have good to excellent streambank stability, streamflow, chemistry,habitat and diversity. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 6 Table 7 below summarizes the water quality pollutants identified throughout Part 3 of this SWMP,the likely activities/sources/targeted audiences attributed to each pollutant, and identifies the associated SWMP program(s)that address each. In addition,the Town of Montreat has evaluated schools, homeowners and businesses as target audiences that are likely to have significant stormwater impacts. Table 7: Summary of Target Pollutants and Sources Target Pollutant(s) Likely Source(s)/Target Audience(s) SWMP Program Addressing Target Pollutant(s)/Audience(s Litter Residents, Montreat College,Montreat Public Education& Outreach,Public Conference Center Involvement&Participation Lawn Care Activities Residents,Montreat College,Montreat Public Education&Outreach,Public Conference Center,Public Works Involvement&Participation, (Parks and ROW maintenance) Pollution Prevention&Good Housekeeping Illicit Discharges Residents,Montreat College,Montreat Public Education&Outreach,Public Conference Center Involvement&Participation,Illicit Discharge Detection&Elimination IDDE Sediment Construction Sites Construction Site Runoff Control, Post-Construction Site Runoff Control Illegal Dumping Residents,Montreat College, Montreat Public Education&Outreach, Conference Center Pollution Prevention&Good Housekee in Improper Disposal of Residents,Montreat College,Montreat Public Education&Outreach, Waste Conference Center Pollution Prevention&Good Housekee in FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 7 PART 4: STORMWATER MANAGEMENT PROGRAM ADMINISTRATION 4.1 Organizational Structure The following org chart provides an overview of the MS4 program organization. The overall program implementation responsibility lies with the Town Administrator,with oversight from the mayor and town council. The Public Works Director and his staff implement the activities related to the MS4 system and SCM operation and maintenance,as well as street, landscaping and waste management. The Code Administrator implements activities related to post-construction. Both the Public Works Director and Code Administrator share responsibility for the IDDE and enforcement. Montreat MS4 Program Organization Chart FMaMMMM— yor/Towri Council FTownnager FPublj,c: irector FC.detrator Utility Maintenance lJtility Maintenance TeohniciansfOperators Workers . Table 8: Summary of Responsible Parties SWMP Component Responsible Position Staff Name Department Stormwater Program Town Manager Savannah Parrish Administration Administration FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 8 SWMP Management Town Manager Savannah Parrish Administration Public Education& Town Manager Savannah Parrish Administration Outreach Public Involvement& Town Manager Savannah Parrish Administration Participation Illicit Discharge Public Works Director, Barry Creasman Public Works Detection& Code Administrator Kayla DiCristina Administration Elimination Construction Site Buncombe County James Guess Planning& Runoff Control Erosion Control Officer Development Post-Construction Code Administrator Kayla DiCristina Administration Stormwater Management Pollution Public Works Director Barry Creasman Public Works Prevention/Good Housekeeping for Municipal Operations Municipal Facilities Public Works Director Barry Creasman Public Works Operation& Maintenance Program Spill Response Program Public Works Director Barry Creasman Public Works MS4 Operation& Public Works Director Barry Creasman Public Works Maintenance Program Municipal SCM Public Works Director Barry Creasman Public Works Operation& Maintenance Program Pesticide, Herbicide& N/A Fertilizer Management Program Vehicle&Equipment N/A Cleaning Program Pavement Management Public Works Director Barry Creasman Public Works Program FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 9 Total Maximum Daily N/A Load(TMDL) Requirements 4.2 Program Funding and Budget In accordance with the issued permit,the Town of Montreat shall maintain adequate funding and staffing to implement and manage the provisions of the SWMP and comply with the requirements of the NPDES MS4 Permit. The budget includes the permit administering and compliance fee,which is billed by the Division annually. The stormwater program is funded through the general revenue fund. Approximately$55k is budgeted for FY24 as a percentage of the Code Administrator and Public Works staffing budgets and Public Works operations budget, as well for a contract for services with LOSRC. Current funding is sufficient for implementing the SWMP and complying with the MS4 Permit. 4.3 Shared Responsibility The Town of Montreat will share the responsibility to implement the following minimum control measures,which are at least as stringent as the corresponding NPDES MS4 Permit requirement. The Town of Montreat remains responsible for compliance if the other entity fails to perform the permit obligation, and may be subject to enforcement action if neither the Town of Montreat nor the other entity fully performs the permit obligation. Table 9 below summarizes who will be implementing the component,what the component program is called,the specific SWMP BMP or permit requirement that is being met by the shared responsibility, and whether or not a legal agreement to share responsibility is in place. Table 9: Shared Responsibilities SWMP BMP or Legal Permit Requirement Implementing Entity&Program Name Agreement (Y/N) 3.5 Construction Site Runoff Buncombe County Erosion and Sediment Control Y Control Program 3.2.2, 3.2.4,2.1.7, 3.2.3, Land of Sky Regional Council Y 3.6.(c), 3.3.2, 3.4.1, 3.4.4, 3.4.6, 3.7.3 3.6.6 On-Site Domestic Buncombe County Health Department N/A Wastewater Treatment FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 10 4.4 Co-Permittees The are no other entities applying for co-permittee status under the NPDES MS4 permit number NCS000430 for the Town of Montreat. Table 10 summarizes contact information for each co-permittee. Table 10: Co-Permittee Contact Information Co-Permittee MS4 Contact Person Phone&E-Mail Interlocal Name Agreement Y/N N/A 4.5 Measurable Goals for Program Administration The Town of Montreat will manage and report the following Best Management Practices (BMPs)for the administration of the Stormwater Management Program. Table 11: Program Administration BMPs Permit 2.1.2 Program Implementation Ref. Measures to evaluate the performance and effectiveness of the SWMP program components at least annually. Results shall be used by the permittee to modify the program components as necessary to accomplish the intent of the Stormwater Program. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 1. Annual Self-Assessment Evaluate the performance and 1.Prepare,conduct and 1.Annually 1.Yes/No effectiveness of the program document an annual Permit Years 1 —5 components at least annually.Results evaluation of the program shall be used to modify the program components. components as necessary to accomplish the intent of the Stormwater Program. Permit 1.6: Permit Renewal Application Ref. Measures to submit a permit renewal application no later than 180 days prior to the expiration date of the NPDES MS4 permit. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 2. Permit Renewal Application Submit a permit renewal 1.Draft SWMP 1.Permit Year 5 1.Yes/No application and Draft SWMP no applicable to the later than 180 prior to permit proceeding 5 years expiration. following permit re- issuance. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 11 Table 11: Program Administration BMPs 2. Certify the stormwater 2.Permit Year 5 2.Date of permit renewal permit renewal application submittal application(Permit renewal application form and Draft SWMP for the next 5-year permit cycle) and submit to NCDEQ at least 180 days prior to ermit expiration. Permit 2.1.1: Adequate Funding and Staffing Ref. The permittee shall maintain adequate funding and staffing to implement and manage the provisions of the SWMP and meet all requirements of this permit. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 3. Adequate Funding and Staffing Evaluate program funding and 1.Prepare gap analysis. 1.Permit Year 1 1. Yes/No staffing to determine if there are Finding of adequate or gaps affecting implementation. inadequate. 2.Evaluate options for 2.Permit Year 2 2.Yes/No addressing any gaps identified. Permit 2.2.2: Written Procedures Ref. The Permittee shall maintain, and make available to the Division upon request,written procedures for implementing the six minimum control measures.Written procedures shall identify specific action steps, schedules,resources,and responsibilities for implementing the MCMs. Written procedures can be free standing or,where appropriate, integrated into the Stormwater Management Plan. The illicit discharge detection and elimination plan shall be free standing. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 4. Written Procedures Develop an implementation plan 1.Prepare 1.Annually 1. Yes/No for the six MCMs including implementation plan. Permit Year 1-5 action steps,responsibilities, schedules and resources. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 12 PART 5: PUBLIC EDUCATION AND OUTREACH PROGRAM The Town of Montreat will implement a Public Education and Outreach Program to distribute educational materials to the community or conduct equivalent outreach activities about the impacts of storm water discharges on water bodies and steps the public can take to reduce pollutants in storm water runoff. The target audiences and identified pollutants listed in Part 3.9 of this SWMP,which will be addressed by the Public Education and Outreach Program, are summarized in Table 12 below. In addition,the Town of Montreat is required to inform institutions and the general public of the hazards associated with illicit discharges,illegal dumping and improper disposal of waste. Table 12: Summary of Target Pollutants&Audiences Target Pollutants/Sources Target Audience(s) Litter General Public,Residents,Montreat College,Montreat Conference Center Yard Waste Residents,Montreat College,Montreat Conference Center Illicit Discharges Residents,Montreat College,Montreat Conference Center Sediment Construction Sites Illegal Dumping Residents, Montreat College, Montreat Conference Center Improper Disposal of Waste Residents, Montreat College, Montreat Conference Center The Town of Montreat will manage,implement and report the following public education and outreach BMPs. Table 13: Public Education and Outreach BMPs Permit 3.2.2 and 3.2.4: Outreach to Targeted Audiences Ref. Measures to identify the specific elements and implementation of a Public Education and Outreach Program to share educational materials to the community or conduct equivalent outreach activities about the impacts of stormwater discharges on water bodies and how the public can reduce pollutants in stormwater runoff. The permittee shall provide educational information to identified target audiences on pollutants/sources identified in table 12 above; and shall document the extent of exposure of each media, event or activity, including those elements implemented locally or throu h a cooperative agree ent. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 5. Partnership with Land of Sky Council of Governments The Town will contract with the Land 1.Execute a legal 1. Permit Year 1. 1.Yes/No of Sky Regional Council(LOSRC)to agreement with LOSRC implement programs and create to provide educational materials for public education and materials and activities outreach to residents,youth,and that target Town of institutions within the Town's Montreat audiences as jurisdiction. Includes social media. listed in Table 12. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 13 Table 13: Public Education and Outreach BMPs 2.Review agreement 2.Annually Permit Years 2.Yes/No with LOSRC and update 2-5. as needed. 3.Provide education and 3.Permit Years 1-5. 3.Yes/No outreach to target Report event type, audiences on topics per number of contacts and Table 12 each year so topics addressed. that all topics and audiences have been addressed by permit year 5. 6. Update literature The Town will evaluate their current 1.Inventory current 1.Permit Year 1. 1.Yes/No handout and,if necessary,create an literature. Evaluate updated brochure that can be used whether current literature throughout the permit period. Key is appropriate for use and placement of brochures will be if not create and have determined and distributed at Town printed new materials. Hall. 2. Place literature in key 2.Permit Years 1-5. 2.Yes/No locations at the Town Hall facility.Replace monthly. 7. Participate in a public event The Town will pass out general 1.Man a booth at one 1.Permit Years 2-5. 1.Yes/No stormwater awareness literature at a public event to distribute Contact hours minimum at one public event lead by literature. the Town and display informative 2.For the events,create a 2.Permit Year 2. 2.Yes/No information related to stormwater. display and/or other visual materials with specific information about pollutants of concern such as litter, nutrients,non-point source pollution,waste disposal. Include how to help material pertaining to the target audience(s). Permit 2.1.7,3.2.3 and 3.6.5(c): Web Site Ref. Measures to provide a web site designed to convey the program's message(s) and provide online materials including ordinances, or other regulatory mechanisms, or a list identifying the ordinances or other regulatory mechanisms,providing the legal authority necessary to implement and enforce the requirements of the permit and SWMP. The web page shall also provide developers with all relevant post-construction requirements, design standards,checklists and/or other materials. A B C D FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 14 Table 13: Public Education and Outreach BMPs BMP Schedule for Annual Reporting No. Description of BMP Measurable Goals) Implementation Metric 8. Stormwater Page on the Town's Website The Stormwater web page will be 1.Make improvements 1.Permit Year 1. 1.Yes/No updated to include at a minimum the to the Stormwater web following Stormwater related items: page to include listed • Links to pertinent permitting items. authorities. 2.Maintain the web 2.Permit Years 1-5. 2. Yes/No • Links to applicable page,including any ordinances. updates and resolving • The MS4 Permit and technical issues. SWMP. • Hotline and instructions for reporting illicit discharges and other environmental issues. • Opportunities for public involvement. • General stormwater awareness information. Permit 3.2.5: Stormwater Hotline Ref. Measures for a stormwater hotline/helpline for the purpose of public education and outreach. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 9. Advertise the Stormwater Hotline Provide the hotline number and 1.Provide the hotline 1.Permit Year 1. 1.Yes/No reporting protocol to the general and pertinent information public. on the Stormwater Web page and in all new Stormwater literature. 2. Check hotline 2.Annually Permit Years 2.Yes/No functionality. 2-5. 10. Train Hotline Staff Train staff on SOP to direct hotline 1.Develop SOP for 1.Permit Year 1. 1.Yes/No calls to appropriate responders. managing hotline calls. 2. Train staff on SOP. 2.Permit Years 1-5. 2.Number trained FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 15 PART 6: PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM This SWMP identifies the minimum elements and implementation of a Public Involvement and Participation Program that complies with applicable State, Tribal and local public notice requirements. The Town of Montreat will manage,implement and report the following public involvement and participation BMPs. Table 14: Public Involvement and Participation BMPs Permit 3.3.1: Public Input Ref. Mechanisms for public involvement that provide for input on stormwater issues and the stormwater program. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric II. Town Meetings Stormwater issues and program 1.Advertise Board 1.Permit Years 1-5. 1. Yes/No implementation items will be brought meetings and agendas on to the Board of Commissioners. web site.Include Residents can provide input. stormwater public comment item on a specific agenda at least once per year. 12. Stormwater Website Page Provide a contact person and e-mail 1.Maintain contact 1.Permit Year 1. 1.Yes/No address for citizen's questions related information on website. to stormwater on the Stormwater 2.Maintain reporting 3.Permit Year 1. 3. Yes/No website page. form on website. Permit 3.3.2: Volunteer Opportunities Ref. Measures to provide volunteer opportunities designed to promote ongoing citizen participation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 13. Identify Volunteer Groups Existing in the Area Create a list of existing volunteer 1. Create a list of 1.Permit Year 2. 1.Yes/No groups that could have potential for potential volunteer improving stormwater issues and groups and document reducing pollutants. Focus would be their main focus. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 16 Table 14: Public Involvement and Participation BMPs participation with residents,and/or 2. Contact at least one of 2. Permit Years 2-5. 2. Yes/No students. the volunteer groups and establish an activity focused on stormwater issues. 3.Implement a minimum 3.Permit Years 3-5. 3.Date and type of of one public event,number of participation activity participants focused on stormwater issues. 14. Offer a Rain Barrel Workshop Create and implement a rain barrel 1.Plan a rain barrel 1.Permit Year 2. 1.Yes/No workshop,to provide residents with a workshop.Decide how it tool to reduce runoff. will be advertised,who will run it,and what materials are needed. 2.Implement the rain 2.Permit Year 3. 2.Yes/No barrel workshop. Date of event and number of participants 15. Promote NC Stream Watch Provide information about NC 1.Encourage residents to 1.Permit Year 4. 1.Yes/No Stream Watch on the Stormwater contribute to NC Stream Number of stream watch web page and in literature and events. Watch observations. Install a Stream Watch sign in a publicly accessible area. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 17 PART 7: ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM The Town of Montreat will develop,manage, implement, document,report and enforce an Illicit Discharge Detection and Elimination Program which shall, at a minimum, include the following illicit discharge detection and elimination BMPs. Table 15: Illicit Discharge Detection and Elimination BMPs Permit 3.4.1: MS4 Map Ref. Measures to develop,update and maintain a municipal storm sewer system map including stormwater conveyances, flow direction,major outfalls and waters of the United States receiving stormwater discharges. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 16. MS4 Major Outfalls and Municipal Storm Sewer System Map Maintain municipal storm sewer 1.Publish map online 1.Permit Year 1. 1.Yes/No system map.Map to include inlets, and link on stormwater Report currently known pipes flow directions,major outfalls page. number of major outfalls. and streams. 2. Continuously update 2.Permit Years 2-5. 2.Yes/No the MS4 Map. Report number of major outfalls added and total. Permit 3.4.2: Regulatory Mechanism Ref. Measures to provide an IDDE ordinance or other regulatory mechanism that provides legal authority to prohibit,detect,and eliminate illicit connections and discharges,illegal dumping and spills into the MS4, includin enforcement procedures and actions. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 17. Maintain Legal Authority Review existing ordinance 1.Review ordinance and 1.Permit Year 1. 1.Yes/No confirming the Town's legal make any necessary authority to enforce and take actions changes.Document any for prohibiting,detecting and revisions. eliminating illicit discharges and connections and illegal dumping and spills. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 18 Table 15: Illicit Discharge Detection and Elimination BMPs Permit 3.4.3: IDDE Plan Ref. Measures to maintain and implement a written IDDE Plan to detect and address illicit discharges,illegal dumping and any non-stormwater discharges identified as significant contributors of pollutants to the MS4. The plan shall provide standard procedures and documentation to: a) Locate priority areas likely to have illicit discharges, b) Conduct routine dry weather outfall inspections, c) Identify illicit discharges and trace sources, d) Eliminate the source(s) of an illicit discharge, and e) Evaluate and assess the IDDE Program. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 18. Review and Improve IDDE Plan Review the IDDE Plan and make any 1. Review annually and 1.Permit Years 1-5. 1. Yes/No necessary improvements. make necessary improvements to the IDDE Plan. 2. Implement/Enforce 2.Annually 2.Yes/No the IDDE Plan. Permit Years 1-5 Permit 3.4.4: IDDE Tracking Ref. Measures for tracking and documenting the date(s) an illicit discharge,illicit connection or illegal dumping was observed,the results of the investigation, any follow-up of the investigation,the date the investigation was closed,the issuance of enforcement actions,and the ability to identify chronic violators. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 19. Track all known illicit discharge,illicit connection and illegal dumping events Maintain a tracking mechanism for 1.Maintain an illicit 1.Permit Year 1-5 1.Yes/No documenting where illegal activities discharge reporting took place,what was done to inform form and work order the violator,records of all system that can be used correspondence,records of all by the appropriate activities related to the illegal activity municipal departments and final resolutions. for tracking of all activities related to the IDDE. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 19 Table 15: Illicit Discharge Detection and Elimination BMPs 2.Perform IDDE 2.Permit Years 1-5. 2.Yes/No inspections using the Number of reporting form. investigations,number of violations issued,number closed. Permit 3.4.5: Staff IDDE Training Ref. Measures to provide training for municipal staff and contractors who, as part of their normal job responsibilities,may observe an illicit discharge, illicit connection,illegal dumping or spills. Training shall include how to identify and report illicit discharges, illicit connections,illegal dumping and spills. Each staff trainingevent shall be documented,including the a enda/materials,date, and number of staff participating. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 20. Staff Training Create a program to train Town staff 1.Develop training 1.Permit Year 1 1.Yes/No in IDDE procedures and hotline program. protocol. 2. Train municipal staff 2.Permit Year 2 and new 2.Yes/No that will be using the employees within first Number trained IDDE Plan and new year hired. employees that will be involved in IDDE,when hired. Permit 3.4.6: IDDE Reporting Ref. Measures for the public and staff to report illicit discharges,illegal dumping and spills. The mechanism shall be publicized to facilitate reporting and shall be managed to provide rapid response by appropriately trained ersonnel. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 21. Stormwater Hotline A Stormwater Hotline will be 1.Provide the hotline 1.Permit Years 1-5. 1.Yes/No maintained for Town's residents and and pertinent information businesses to report stormwater on the stormwater web issues and illicit discharges,illegal page and in all new dumping,and spills.The hotline stormwater literature. number will be available on the Town's Website and in educational literature. 22. Illicit Discharge Reporting System FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 20 Table 15: Illicit Discharge Detection and Elimination BMPs Maintain a reporting form to record 1.Maintain a reporting 1.Permit Year 1 1.Yes/No the location,date and nature of the form and work order Number reported illicit discharge,illegal dumping, system that can be used and/or spills. by the appropriate municipal departments for tracking of all activities related to the IDDE. 2. Create a public 2.Permit Year 2 2.Yes/No reporting form on the Number reported stormwater web page. PART 8: CONSTRUCTION SITE RUNOFF CONTROL PROGRAM In accordance with 15A NCAC 02H .0153,the Town of Montreat relies upon the North Carolina Sedimentation Pollution Control Act(SPCA)of 1973 as a qualifying alternative program to meet a portion of the NPDES MS4 Permit requirements for construction site runoff control measures. The SPCA requirements include reducing pollutants in stormwater runoff from construction activities that result in land disturbance of greater than or equal to one acre, and includes any construction activity that is part of a larger common plan of development that would disturb one acre or more. The state SPCA Program is either delegated to a city/town, delegated to a county,or implemented by NCDEQ in non- delegated areas. Table 16: Qualifying Alternative Program Components for Construction Site Runoff Control Program Permit State or Local Program Name Legal Authority Implementing Reference Entity 3.5.1 - Buncombe County 15A NCAC Chapter 04, Buncombe County 3.5.4 Delegated SPCA Program* NCDEQ Approved Delegation, Interlocal Agreement/Joint Resolution,Local Ordinance * The local delegated SPCA Program ordinance(s)/regulatory mechanism(s)can be found at: https://www.buncombecounty.org/common/planning/ordinance-erosion-control.pdf The Town of Montreat also implements the following BMPs to meet NPDES MS4 Permit requirements. Table 17: Construction Site Runoff Control BMPs Permit 3.5.6: Public Input Ref. Measures to provide and promote a means for the public to notify the appropriate authorities of observed erosion and sedimentation problems. A B C D FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 21 Table 17: Construction Site Runoff Control BMPs BMP Schedule for Annual Reporting No. Description of BMP Measurable Goal(s) 7 Implementation Metric 23. Municipal Staff Training Train municipal staff who receive 1 1.Permit Year 1.Then as 1.Number of staff calls from the public on the protocols . Train municipal staff needed for new staff. trained for referral and tracking of on proper handling of construction site runoff control construction site runoff complaint . control complaints. 24. Stormwater Hotline and Town's Stormwater Page The Stormwater Hotline will be 1.Provide the hotline 1.Permit Years 1-5. 1.Yes/No maintained for citizen's use for and pertinent information reporting sediment run-off from on the Stormwater web construction sites and for questions page and in all new concerning construction site stormwater literature. activities. Permit 3.5.5: Waste Management Ref. Measures to require construction site operators to control waste such as discarded building materials, concrete truck washout,chemicals,litter,and sanitary waste at the construction site that may cause adverse impact to water quality. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 25. Ordinance for Waste Management Review ordinance for new 1.Review ordinance and 1.Permit Year 2. 1.Yes/No construction and remodeling waste revise if needed. management and determine if 2.Maintain legal 2.Permit Year 2-5. 2.Yes/No additional detail is needed. authority 26. Waste Management Information Materials Develop information materials for 1. Create document that 1.Permit Year 3. 1.Yes/No contractors to address waste can be provided to management on construction sites. building permit applicants and referenced on the Town's website. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 22 PART 9: POST-CONSTRUCTION SITE RUNOFF CONTROL PROGRAM This SWMP identifies the minimum elements to develop, implement and enforce a program to address stormwater runoff from new development and redevelopment projects that disturb greater than or equal to one acre,including projects less than one acre that are part of a larger common plan of development or sale,that are located within the Town of Montreat and discharge into the MS4. These elements are designed to minimize water quality impacts utilizing a combination of structural Stormwater Control Measures (SCMs)and/or non-structural BMPs appropriate for the community, and ensure adequate long- term operation and maintenance of SCMs. In accordance with 15A NCAC 02H .0153 and.1017,the Town of Montreat implements the following State post-construction program requirements,which satisfy the NPDES Phase II MS4 post-construction site runoff control requirements as Qualifying Alternative Programs(QAPs) in the MS4 area(s)where they are implemented. Table 18: Qualifying Alternative Program(s) for Post-Construction Site Runoff Control Program State QAP Name State Requirements Local Ordinance/Regulatory Mechanism Reference None N/A N/A The Town of Montreat has existing requirements other than Qualifying Alternative Program(s) for implementation of the NPDES Phase 11 MS4 post-construction program requirements. These existing requirements are codified in local ordinance(s), and implementation is further defined in guidance, manuals and/or standard operating procedure(s)as summarized in Table 19 below. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 23 Table 19: Summary of Existing Post-Construction Program Elements Permit Requirements for Municipal Ordinance/Code Reference(s) Date Adopted Plan Review and Approval and/or Document Title(s) 3.6.2 a Authority Chapter K,Article III,#303,#318 2/11/2010 3.6.3(a) & 15A NCAC 02H.0153(c) Chapter K,Article III,#303 2/11/2010 Federal, State&Local Projects 3.6.3 b Plan Review Chapter K,Article 111,#303, #304 2/11/2010 3.6.3 c O&M Agreement Chapter K,Article 111,#309 2/11/2010 3.6.3 d O&M Plan Chapter K,Article III,#308 2/11/2010 3.6.3(e)Deed Chapter K,Article III,#309,#312 2/11/2010 Restrictions/Covenants 3.6.3 Access Easements Chapter K,Article III,#312 2/11/2010 Permit Requirements for Municipal Ordinance/Code Reference(s) Date Adopted Inspections and Enforcement and/or Document Title(s) 3.6.2 b Documentation Chapter K,Article 111,#310 2/11/2010 3.6.2 c Right of Entry Chapter K,Article III,#310 2/11/2010 3.6.4 a Pre-CO Inspections Chapter K,Article 111,#304 2/11/2010 3.6.4 b Compliance with Plans Chapter K,Article III,#304 2/11/2010 3.6.4 c Annual SCM Inspections Chapter K,Article III,#310 2/11/2010 3.6.4 d Low Density Inspections Chapter K,Article 11I,#310 2/11/2010 3.6.4 e Qualified Professional Chapter K,Article III,#310 2/11/2010 Permit Requirements for Municipal Ordinance/Code Reference(s) Date Adopted Fecal Coliform Reduction and/or Document Title(s) 3.6.6 a Pet Waste Chapter K,Article 111,#314 2/11/2010 3.6.6(b)On-Site Domestic Buncombe County Health Department N/A Wastewater Treatment Environmental Health Services The annual reporting metrics for the post construction program are provided in Table 20: Post Construction Site Runoff Control BMPs below. Table 20: Post Construction Site Runoff Control BMPs Permit 3.6.5(a),3.6.5(b),and 4.1.3: Minimum Post-Construction Reporting Requirements Ref. Measures to document activities over the course of the fiscal year(July 1 —June 30)including appropriate information to accurately describe rogress, status, and results. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 27. Standard Reporting ------------- FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 24 Table 20: Post Construction Site Runoff Control BMPs Implement standardized tracking, 1. Track number of low 1. Continuously 1.Number of plan documentation,inspections and density(i.e. Smaller Permit Years 1-5 reviews performed for reporting mechanisms to compile Projects(5,000-10,000sf low density and high appropriate data for the annual self- of disturbance))and high density. assessment process. Data shall be density(>24%BAU or provided for each Post-Construction/ Larger Projects> Qualifying Alternative Program 10,000sf of disturbance) being implemented as listed in Tables plan reviews performed. 18 and 19. 2. Track number of low 2. Continuously 2.Number of plan density and high density Permit Years 1-5 approvals issued for low laps approved density and high density. 3.Maintain a current 3. Continuously 3. Summary of number inventory of low density Permit Years 1-5 and type of SCMs added projects and constructed to the inventory;and SCMs including SCM number and acreage of type or low density low density projects acreage,location and last constructed. —inspection date. 4. Track number of SCM 4. Continuously 4.Number of SCM —inspections performed. Permit Years 1-5 inspections. 5. Track number of low 5. Continuously 5.Number of low density density inspections Permit Years 1-5 projects inspected. performed. 6. Track number and 6. Continuously 6.Number of type of enforcement Permit Years 1-5 enforcement actions actions taken. issued. Permit 3.6.2: Legal Authority Ref. Measures to maintain adequate legal authorities through ordinance or other regulatory mechanism to: (a)review designs and proposals for new development and redevelopment to determine whether adequate stormwater control measures will be installed, implemented,and maintained, (b)request information such as stormwater plans, inspection reports,monitoring results, and other information deemed necessary to evaluate compliance with the Post-Construction Stormwater Management Program, and(c)enter private property for the purpose of inspecting at reasonable times any facilities, equipment,practices, or operations related to stormwater discharges to determine whether there is compliance with the Post-Construction Stormwater Management Program. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 28. Evaluation and revision of ordinance Review stormwater ordinance and 1.Evaluate current 1.Permit Year 2 1.Yes/No amend with changes where needed. standards and determine if updates needed. 2.Proceed with required 2.Permit Year 3 2.Yes/No legal processes such as Board approvals. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 25 Table 20: Post Construction Site Runoff Control BMPs 3.Implement changes 3.Permit Year 4 3. Yes/No and update information materials. Permit 3.6.3: Plan Review and Approval Ref. Measures to maintain plan review and approval authority, standards and procedures to: (a)Require Federal, State, and local government projects to comply with Post-Construction Program requirements throughout the entire MS4 permitted area,unless the entity is subject to its own NPDES MS4 permit or a qualifying alternative program, (b)Conduct site plan reviews of all new development and redeveloped sites that disturb greater than or equal to one acre, and sites that disturb less than one acre that are part of a larger common plan of development or sale for compliance with 15A NCAC 02H .1017 and the qualifying alternative programs that apply within your jurisdiction, (c)Ensure that each project has an Operation and Maintenance Agreement that complies with 15A NCAC 02H .1050(12),(d)Ensure that each project has an Operation and Maintenance Plan that complies with 15A NCAC 02H .1050(13),(e)Ensure that each project has recorded deed restrictions and protective covenants,that require the project to be maintained consistent with approved plans, and(f)Ensure that each SCM and associated maintenance accesses be protected in a permanent recorded easement per 15A NCAC 02H 1050 9 and(10). BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 28. O&M Agreement and Plan requirements Review both the agreement and plan 1.Evaluate if O&M 1.Permit Year 1. 1.Yes/No requirements and ensure that these Agreement and Plan are comply with 15A NCAC 02H compliant. .1050(12) and 15A NCAC 02H 2.Proceed with changes 2.Permit Year 2 2.Yes/No .1050 13 if needed. Permit 3.6.4: Inspections and Enforcement Ref. Measures to maintain inspection and enforcement authority, standards and procedures to: (a) Conduct post- construction inspections prior to issuing a Certificate of Occupancy or a Temporary Certificate of Occupancy. Alternatively,the project owner may provide a surety bond to guarantee compliance with the approved plan(s), (b)Ensure that the project has been constructed in accordance with the approved plan(s), (c)Ensure annual inspection of each permitted SCM to ensure compliance with the approved Operation and Maintenance Agreement, (d)Ensure inspection of low-density projects at least once during the permit term, and(e)Require that inspections be conducted by a qualified professional. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 29. Inspection of Post Construction SCMs Develop a schedule for inspection of 1.Inspect all the post 1.Permit Year 1-5. 1.Percentage of SCMs post construction SCMs. construction SCMs Annually inspected. within the Town's jurisdiction and take appropriate actions for SCMs that are out of compliance. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 26 Table 20: Post Construction Site Runoff Control BMPs Permit 3.6.6: Fecal Coliform Reduction Ref. Measures to control,to the maximum extent practicable, sources of fecal coliform per 15A NCAC 02H .1017(7). At a minimum,the program shall include: (a)A pet waste management component,which may be achieved by revising an existing litter ordinance,and(b)An on-site domestic wastewater treatment system component, if applicable,which may be coordinated with local county health department,to ensure proper operation and maintenance of such systems. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 30. Pet Waste Management Review pet waste management being 1.Evaluate what is 1.Permit Year 2. 1.Yes/No implemented within the town. currently in place and Evaluate is there is a need to expand update as needed. this initiative. 2.Implement the pet 2.Permit Year 3-5. 2.Yes/No waste management policy. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 27 PART 10:POLLUTION PREVENTION AND GOOD HOUSEKEEPING PROGRAMS This SWMP provides a comprehensive pollution prevention and good housekeeping strategy for the Town of Montreat municipal facilities and operations. Pollution prevention and good housekeeping is accomplished through the implementation of seven required programs,which collectively address the ultimate goal of preventing or reducing pollutant runoff from municipal operations such as parks and open space maintenance, fleet and building maintenance,new construction and land disturbances,and municipal storm sewer system maintenance. Pollution prevention and good housekeeping for municipal operations includes the following programs: 1. Municipal Facilities Operation and Maintenance Program 2. Spill Response Program 3. MS4 Operation and Maintenance Program 4. Municipal SCM Operation and Maintenance Program 5. Pesticide,Herbicide and Fertilizer Management Program 6. Vehicle and Equipment Maintenance Program 7. Pavement Management Program The Town of Montreat will manage,implement and report the pollution prevention and good housekeeping BMPs as specified in Table 21 below for each required program. Table 21: Pollution Prevention and Good Housekeeping BMPs Permit 3.7.1: Municipal Facilities Operation and Maintenance Program Ref. Measures to manage facilities that are owned and operated by the permittee and have the potential for generating polluted stormwater runoff. The permittee shall maintain a current inventory of municipal facilities;perform facility inspections and routine maintenance;establish specific frequencies,schedules,and standard documentation;provide staff training on general stormwater awareness and implementing pollution prevention and good housekeeping practices.[Please note that at a minimum, NCDEQ will require that all inventoried municipal facilities be inspected once per permit term to determine pollution potential, and facilities with potential be inspected at least annually] BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 31. Inventory of Municipal Facilities Create an inventory of all municipal 1.List of all municipal 1.Permit Year 1. 1.Yes/No facilities,including location, facilities. Number of facilities. function,and document what 2.Identify facilities with 2.Permit Year 1. 2.Yes/No activities or framework have the pollution potential that Number of facilities potential to generate stormwater need to be inspected runoff pollution. annually. 32. Public Works Standard Operating Procedure(PW SOP) FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 28 Table 21: Pollution Prevention and Good Housekeeping BMPs Maintain PW SOP with annual 1.Describe inspection 1.Permit Year 1. 1.Yes/No inspection and maintenance protocols and maintenance for municipal facilities. protocols in SOP. Include inventory of municipal facilities. 2.Perform a site 2.Permit Year 2-5. 2.Yes/No Number of inspection of municipal facility inspections. facilities to determine and document items with potential for spills or stormwater pollution, and to identify any issues.Review in place SPCC plans and update as necessary. Permit 3.7.2: Spill Response Program Ref. Measures for facilities and operations that store and/or use materials that have the potential to contaminate stormwater runoff if spilled. The permittee shall maintain written spill response procedures and train staff on spill response rocedures. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 33. Spill Potential and Response Procedures Any municipal facility that stores or 1. Create written spill 1.Permit Year 2. 1.Yes/No works with materials which have the response procedures and potential to contribute to polluted provide to staff. run-off shall be identified and written Consider pertinent spill response procedures put in locations to post place. document. 2. Train staff in SPCC 2.Permit Years 2,and 2.Yes/No procedures. within first year of new Number of staff trained hire Permit 3.7.3: MS4 Operation and Maintenance Program Ref. Measures to minimize pollutants in the stormwater collection system. The permittee shall provide operation and maintenance staff training on stormwater awareness and pollution prevention,perform MS4 inspections,maintain the collection system including catch basins and conveyances;and establish specific frequencies,schedules,and standard documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 34. MS4 Operation&Maintenance(O&M)Plan FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 29 Table 21: Pollution Prevention and Good Housekeeping BMPs Develop a proactive plan for MS4 1.Develop a SOP that 1.Permit Year 1. 1.Yes/No system maintenance which requires includes inspection regular inspections and maintenance schedules,standard and verify,document,and prioritize documentation,staff maintenance activities identified by responsibilities,and inspections or citizen reports. proper maintenance training. 35. Staff Training Provide training to municipal staff to 1.Develop or identify an 1.Permit Year 1 1.Yes/No minimize pollutants in the stormwater appropriate training collection system and prevent program. unnecessary damage and wear on the 2.Provide training for all 2.Permit Year 2,and as 2.Yes/No system. existing and new needed with new hires Number trained employees with MS4 responsibilities. 36. MS4 Inspections and Maintenance Perform inspections and maintenance 1.Maintain a reporting 1.Permit Year 1. 1.Yes/No on MS4 system. form to document inspection protocol and record inspections. 2.Perform regular 2.Permit Years 1-5. 2.Yes/No inspections in Report number of accordance with the SOP inspection and (100%of inlets and maintenance activities. major outfalls annually). Permit 3.7.4: Municipal SCM Operation and Maintenance Program Ref. Measures to manage municipally owned,operated,and/or maintained structural stormwater control measures(SCMs)that are installed for compliance with the permittee's post-construction program. The permittee shall maintain a current inventory of SCMs,perform SCM inspections and maintenance,and shall establish specific frequencies,schedules,and documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 37. Inventory and Mapping of Municipal Structural SCMs Develop and maintain a current 1. Create inventory of 1.Permit Year 1 1.Yes/No inventory of Town-owned structural municipally owned Number of municipal SCMs and reflect those structures on SCMs. SCMs. the Town's MS4 map. 2.Update MS4 map with 2.Permit Year 2-5. 2.Yes/No municipal SCMs. 38. Municipal SCM Inspection and Maintenance Perform inspections and maintenance 1.Inspect and maintain 1.Permit Years 1-5. 1.Yes/No of municipal SCMs. the SCMs annually. Number of inspections Document inspection dates and where the maintenance took place. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 30 Table 21: Pollution Prevention and Good Housekeeping BMPs Permit 3.7.5: Pesticide,Herbicide and Fertilizer Management Program Ref. Measures to minimize water quality impacts from the use of landscape chemicals. The permittee shall provide routine pollution prevention and chemical use,storage and handling training,and shall ensure compliance with permits and a licator certifications. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric Pesticide,Herbicide,Fertilizer Applicator Training N/A—staff does not apply pesticides, N/A N/A N/A herbicide and fertilizers Permit 3.7.6: Vehicle and Equipment Maintenance Program Ref. Measures to prevent and minimize contamination of stormwater runoff from areas used for municipal vehicle and equipment maintenance and/or cleaning. The permittee shall ensure that municipal industrial facilities subject to NPDES industrial permitting comply with those permit requirements,provide routine pollution prevention training to staff, perform routine inspections,and establish specific frequencies,schedules,and documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric Vehicle and Equipment Cleaning and Maintenance Facility Inspection N/A—staff does not clean and N/A N/A N/A maintain vehicles Permit 3.7.7: Pavement Management Program Ref. Measures to reduce pollutants in stormwater runoff from municipally owned streets,roads,and parking lots within the permittee's corporate limits. The permittee shall implement measures to control litter,leaves,debris,particulate and fluid ollutants associated with vehicles,and establish specific fre uencies,schedules,and documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 39. Street Cleaning Maintain streets so that they are clear 1. Collect leaves and 1.Permit Years 1-5. 1.Yes/No of litter,leaves and debris. brush on a regular Volume of leaves schedule.Document collected collection dates. 40. Vehicle Pollutant Management Implement measures to prevent and 1.Provide spill kits and 1.Permit Year 2. 1.Yes/No reduce pollution from vehicles. training to staff for municipal vehicles. 2.Provide public 1.Permit Year 3. 2.Yes/No education on vehicle Pollution Prevention. FINAL DRAFT NCS000430 SWMP Town of Montreat February 2024 Page 31