Loading...
HomeMy WebLinkAboutNCG140287_Postinspection Report CoWS_20211201 (bIli Wiii ton alem December 1, 2021 Mr. Casey Hartley Public Works Plant Manager Department Hartley Ready Mix Concrete Mfg., Inc. Stormwater/Erosion and P.O. Box 1719 Sedimentation Control Program Welcome,N.0 27374 City of Winston-Salem P.O.Box 2511 Winston-Salem,NC 27102 Mr. Casey Hartley: CityLink 311(336.727.8000) Fax 336.748.3173 mwrvstonnuratemnartcorrr The Stormwater Division of the City of Winston-Salem would like to thank you for your time and professional courtesy regarding the November 29,2021 inspection of Hartley Ready Mix Concrete Inc. As per your request, a copy of the amended surface water inspection form has been enclosed to you. Part 5 of this report (Required Actions to be completed by Facility) contains Annotations#1-#23 that Hartley Ready Mix Concrete Mfg., Inc. must complete. Please provide documentation that verifies Hartley Ready Mix Concrete Mfg.,Inc. successful completion of the corrective measures to me by December 3, 2021. The Stormwater Division reserves the right to enter and inspect Hartley Ready Mix Concrete Mfg., Inc.as often as necessary to determine compliance with permit requirements of NCG140287. Thank you for your continued support and implementation of the City of Winston- Salem's Stormwater Program. If you have any questions,please feel free to contact me at(336) 747-6964. Since ly, 6( C-- Ladonta Clark (Jamal) Stormwater Operations Supervisor City of Winston Salem Stormwater Division Field Operations Department Phone: 336.747.6964 Cell: 336.416.2403 City Councilt Mayor Allot Joiner;Vivian ii.Bunke,Mayor Pro'limpore,Northeast Ward;Denise D.Adams,North Ward;Dan Besse,Southwest Wand;Robert C.Clark,West Ward; MEW Molly Leight,South Ward;Wanda Moselle],Northwest Ward;Derwin 1.Montgomery,East Ward;James'l'nylor,Jr.,Southeast Ward;City Manager:Lee D.Garrity Call 311 or 336-727-8000 citylink@cityofws.org lid M11SIIIIISiIW Stormwater/Erosion Control Division Industrial and Municipal Good Housekeeping Inspection Form General Information A) Official Company Name: Hartley Ready Mix Concrete Mfg., Inc. B) Physical Address: 3510 Rothrock Street Winston Salem, NC 27107 C) Telephone Number: Office (336)788-3522 D) Mailing Address, if different from above address: P.O. Box 1719 Welcome,N.0 27374 E) Authorized contacts to represent company in environmental regulatory issues: Primary contact: Tyler Hartley Title: Operational Manager Contact number(s): (336) 788-3928 Email address: Tylerhartley@hartleyreadymix.com Secondary contact: Chad H. Hartley Title: Plant Environmentalist Contact number(s): (336) 788-3928 Email address: Chadhartley@hartleyreadymix.com F) SIC Code Number of business: 3273 G)NC Stormwater NPDES Permit Number: NCG 140287 Permit Category: Ready-mixed concrete H) Any other control authority permit(s) (air quality control, wastewater, hazardous waste) &number(s): Air Quality Permit# 00859R I) Brief description of industrial activities that occur on-site: The delivery of materials and the production of concrete are industrial activities that occur on-site I) Ultimate Receiving Waters: Salem Creek TMDL stream ®Yes ❑No Part 1 - Stormwater Controls 1. Best Management Practices a. List the non/structural controls employed by the facility: 1. Buildings are used to store some materials by the facility. b. Are the non-structural BMPs reasonable & appropriate for the facility? ®Yes ❑No Comments: Please increase the cleaning frequency of the parking lot and the settling basin in order to maintain good housekeeping practices. c. Are stormwater control measures (SCMs) installed correctly,maintained, and effective operating condition? ®Yes ❑ No ❑ N/A Comments: To prevent illicit discharges, please clean out the settling basin near the truck wash station. • 2. Provide a brief description of other controls that manage/prevent/minimize stormwater runoff (e.g., erosion and sediment controls, inlet protection/control at storm drains, diversion structures): Hartley Ready Mix Concrete uses a two truck mixer pits that contains all process water. Hartley Ready Mix Concrete also uses a settling basin to capture all debris rom entering the stream. Part 2 — Stormwater Discharge Outfalls (SDOs) 1. Any evidence of discharge to receiving waters/MS4 from the SDOs? (e.g.: stormwater runoff, dry weather discharge, co-mingling of process wastewater, trash, debris, oil and grease): ❑Yes ®No Comments: On August 11, 2021, Stormwater staff noticed dry weather discharge from the settling basin that had particles which ultimately discharged into Salem Creek. Hartley Ready Mix discharges directly into Salem Creek instead of entering the MS4 system. 2) Do the stormwater outfalls on-site correspond with those listed on the site map in the Stormwater Pollution Prevention Plan (SWPPP)? IZI Yes ❑No Comments: If no discharge occurs during the sampling period, the permittee must record "No Flow" or "No Discharge" within 30 days of the end of the sampling period in the facility's monitoring records. "No Flow" or"No Discharge" shall be reported on the Annual Summary Discharge Monitoring Report (DMR) due by March 1 3) Summary of Stormwater Discharge Outfalls SDO Identification Potential Pollutants that Physical Location Latitude and could be discharged Longitude (if known) Outfall 1 Concrete plant Along western property Latitude 36.05033 Truck loading area boundary near truck wash Longitude-80.23189 Truck wash area area Stone/sand stockpile Outfall 2 Storage area At northwestern corner of Latitude 36.05134 Maintenance facility property Longitude-80.23154 Concrete block area Stone/sand stockpile Outfall 3 Truck mixer wash out Along northern property Latitude 36.05126 boundary Longitude-80.23108 Part 3 - BMP: Inspection and maintenance program Yes N/A No Notes Is secondary containment provided for materials(including waste) or products stored outside in tanks and/or containers (where applicable)? Are secondary containment free of accumulated water, debris, cracks,holes,or evidence of leaks? Does the facility maintain secondary containment drain logs? Do the drain logs confirm the presence of pollutants and other pertinent information, such as signatory requirements,name of secondary containment area, date,time, and if drainage is connected to MS4 or receiving waters? Are tanks and containers in good condition,closed, and properly marked? Are tanks,containers, and piping free of rust,pits, deterioration, or evidence of leaks? Are tanks and containers protected from impacts from moving vehicles and equipment?E.g. bollards and curbs Any activities that have not been addressed or designed in order to minimize exposure to runoff(e.g. herbicide application) In the case of a spill, does the municipal operation or industrial ✓ facility maintain and submit documentation to the City of WS on a spill release form? Any roof stacks that have the potential to release ✓ solids/particulate? Are all hazardous materials properly labeled and stored to ✓ prevent exposure to stormwater runoff? Are solid waste containers in good condition and of sufficient ✓ size to contain all waste?If so,how is this determined? Do the solid waste containers have covers and closed drain ✓ plugs? Are solid waste containers free of waste that requires special handling/disposal?Are containers properly labeled to ensure correct disposal means? Are solid waste containers labeled"Prohibited-No Hazardous Waste,No Recyclable Materials,No Liquids?" Are special containers provided for other types of waste?E.g. ✓ liquid waste or hazardous waste Does the facility utilize oil water separators?If yes, are the ✓ inspection and maintenance records documented? Are secondary containment drain valves maintained in the ✓ closed position, unless the facility is draining the secondary containment? Part 4 — Stormwater Pollution Prevention Plan (SWPP) Review Site Overview Yes No Notes Is there a SWPPP? Is it up-to-date? ✓ Does SWPPP include a certification statement by the responsible ✓ Please update corporate officer? Does the general map depict the facility's location on a USGS ✓ quad map (or equivalent map)with receiving waters (or MS4) listed? Identification of impaired waters or watershed(if applicable)? ✓ Narrative Description of these Industrial/Operational Activities: Storage Practices ✓ Unloading/Loading Activities ✓ Outdoor Processes ✓ Particulate Generating/Control Processes Waste Disposal ✓ Vehicle/Equipment Washing ✓ Does site map denote drainage items: flow direction,boundaries, ✓ %impervious, and structures? Does the map also include SDOs, industrial activity areas, and site topography? A list of major spills that have occurred within the past three ✓ Please document that no years(with corrective actions to prevent future spills)? spills have occurred A signed,annual certification that the facility has been tested for ✓ non-stormwater discharges from the site? Comments: When the weather permits,please perform semi-annual Analytical monitoring and Qualitative(visual) monitoring during a measurable storm event. According to the Division of Energy,Mineral, and Land Resources a measurable storm event" (any size that results in a discharge) replaces "Representative" event.With the current permit,total flow and event duration no longer required. Amendments: 1. Please submit the no Flows and no discharges to NC DEMLR from the past permit year and provide the justifications. 2. Please conduct a facility inspection for the second half of the year which is July to December. Stormwater Management Strategy Yes No Notes Does SWPPP incorporate the nine baseline controls: ✓ Feasibility Study (technical&economic review to minimize pollutant exposure) ✓ Secondary Containment(table summary of tanks,stored materials,release records) ✓ BMP Summary (listing of site structural/nonstructural practices) ✓ PM & GH(inspection of material handling areas&regular cleaning schedules) ✓ Missing for 2021 Facility Inspections(biannual inspections of facility and all stormwater systems, ✓ Please perform were the inspections completed during separate parts of the year?) Employee Training(annual basis for staff who perform SPRP and GH functions) Responsible Party(specific position(s)/person(s)-developing,implementing,& ✓ Please update revising SWPPP) Amendment&Annual Update(of major spills,non-sw flows,BMPs,sampling data) ✓ Does SWPPP contain completed routine inspection reports/records ✓ Please continue performing regarding reportable implementation of the nine baseline controls the routine inspection reports (e.g. SWPPP Implementation)? Does the Spill Response Procedures (SPRP)document all spills and I NCDNER is now NC DEMLR releases?Does the entity properly dispose of contaminated materials Levi Hiatt Engineer used in the clean up?Is the disposal of materials documented?Has a 336-776-9658 contact person(s) and contact information been identified and documented for each facility? Analytical Monitoring Of not applicable, please notate) Yes No Notes Are samples collected within 30 minutes of the first discharge from ✓ Please conduct and a measurable rain event and at least 72 hours since the last storm document the analytical sampling when weather event? permits Are sampling events 60 days apart?(EXCEPTION:Tier 2&3 responses) ✓ Is analytical monitoring complete(including schedule) for each ✓ Please start submitting no SDO?(EXCEPTION:REPRESENTATIVE OUTFALL STATUS) flows to NCDEMLR V Any exceedances of pollutant parameters when compared against the permit benchmark values?If yes,have they documented their response to the Department of Environmental Quality? Has the facility implemented appropriate, selected actions to reduce pollutant concentrations,in response to benchmark exceedances(if applicable)? Qualitative Monitoring Yes No Notes Is qualitative monitoring being performed during measurable storm V Please conduct and events? document qualitative monitoring when weather permits Is qualitative monitoring complete (including schedule)for each ✓ SDO? Are monitoring events 60 days apart? (EXCEPTION:Tier 2&3 responses) ✓ Any observable, excessive amounts of pollutant indicators in stormwater discharge at SDOs? Part 5 — Required Actions to be completed by Facility: 1. Please clean up and properly dispose of the sediment on the ground outside of the wellhouse to prevent runoff into the stormwater drainage system. 2. Please install a dumpster plug at the bottom of the dumpster downhill from the wellhouse to prevent the leakage of water mixed with trash from inside the dumpster. 3. Please properly dispose of the barrel holding dirty water located behind the Douglass Battery Trailer adjacent to the train tracks. 4. Please clean up and properly dispose of the trash and debris located on the graveled corner of the property to prevent possible transport by rain events into the stormwater drainage system. 5. Please properly dispose of the broken white barrel bottom holding dirty water located next to the stormwater water sampling site on the property near the fence line. 6. Please dispose of the orange bucket sitting in front of the parked forklift, and please clean up oil based substance spilled on the ground around the bucket and forklift. Please determine a way to prevent the forklift from leaking. 7. Please clean up and properly dispose of spare parts on the ground and on the pallet and trash that is under the conveyor belt. 8. Please clean up and properly dispose of gravel that is underneath the concrete truck that is awaiting to be repaired or disposed of which is beside the settling basin near the back corner of the office. 9. Please clean the gravel, sediment, trash, and debris from the entire stormwater channel that is a part of the settling basin. Also, please remove all trap and contained dirt at the discharge point of the settling basin to prevent stormwater pollution. 10. Please clean up all fresh all oil spots on the with oil dry and dispose of all the sorbents and any other materials used to perform this action. 11. Update and sign the responsible party with signature and dates. 12. Please provide some employee training for the staff who will be involved with the SPPP. 13. Start performing analytical and qualitative monitoring for each SDO. Also, document the records in the SPPP. 14. In the SPPP, please list the major spills that have occurred within the past three years. If no spills have occurred, please document that in the SPPP. 15. Please update and sign the Responsible Party section of the SPPP. 16. Provide a signed, annual certification that the facility has been tested for non-stormwater discharges from the site of Hartley Ready Mix Concrete Mfg. 17. Implement the preventative maintenance and good housekeeping program. 18. Please provide inspection records of cleaning and preventative maintenance. 19. Update the spill prevention and response procedures with the identified, responsible personnel with signatures and dates. 20. Please update SPPP to current year and date. 21. Please increase the good housekeeping cleaning frequency to reduce Stormwater pollution. Also, please provide the newly increased frequency in the SWPPP. 22. Please update the Stormwater Pollution Prevention Plan with the current team members in place that will be overseeing it since the plan has not been updated since 2015. 23. Please add Levi Hiatt as the primary contact for the Winston-Salem Regional Office DEMLR Entity Representative(s)that participated in inspection: Tyler Hartley and Casey Hartley Title(s): Plant Managers Start of Inspection: 9:00am Completion of Inspection: 10:30am Date: November 29, 2021 Vit,"""^^1-4 aja°1 Signature of Inspector: Title: Stormwater Operations Supervisor 1 _IMIL i‘, 1674 ' IS - 10, :�— - / - � ~ta§-•by a20,.fi{`_ / /` -----1' is jl Y �-. /f�yfr 't4�r Ca < -04{ Yij? r Va F ?, - l e r -a} f 0 7 kx .i4S•4 Y..'f�4' s :',,:/;:, Sri¢ rvr ,• t :_ i Si 'ri• . r • . { Picture 1.Excess amount of built up dirt at the wellhouse. Please clean up and properly dispose of the sediment on the ground outside of the wellhouse to prevent runoff into the stormwater drainage system. r,: '`.1+5'1 ._.-ram t, lit). _24u c • -" •., `o..,_ - .-.+.A 4 ,_`•t tea. ,_ r __ -_- ilk: " Tom' :-SJby % 'Z:•� =' � . _, 7 �'-.i ce-- .:�R'�"?!'.`� `` : 4 s�' t t ) spa. Lr r+' ;�. ���.. L `1.`Y�' �_` �• �� y, 4"T £ £ .+ � � YM `ice/• . • ._ - ty 'itli•�„ N -.Fw. • Picture 2.Dumpster missing a dumpster plug Please install a dumpster plug at the bottom of the dumpster downhill from the wellhouse to prevent the leakage of water mixed with trash from inside the dumpster. • _ ./ .�,45'','..1 •.j ' '�_,y' �"-ti- c„• �.-, ,.- _;!- -- --..._ ,ram `f Y}: • 4.. 'Is' Picture 3.A 55-gallon drum with storm water runoff mixed with elements of the drum. Please properly dispose of the barrel holding dirty water located behind the Douglass Battery Trailer adjacent to the train tracks. Vie, ��J ' t r ; F ,T.''., 4 .•A '_...fte" ����- =:rift �,;..i* 9'� i'177 j�._ 'lC� "� • 'v li> fira JA,,,, ' '` \ VI,!.-' - 2 N N.f f. } � :.' is�J P /- fY}j('l1fi -• . ,1 . , • -- fi ' r „I, � ( •' t , a 1,. r Zif ` . s w }}. tc t j wT � M v +1`..,,.. .,,_,I..., r- / Tryy�i 1-0 (' J. \ J� ..N M\ ,D�; Ad _ + A. S� tt 4 .. ! ,J -• `,' G , of e. T'i — ,�5 1 '4,s 1 l+l to t•g 'yf --t. ; ,-; ,r ,.1N -1'kfaY, £' ' -7,-- e� -. '�� "_t ` ' Picture 4. Trash debris in the graveled lot near the fence line. Please clean up and properly dispose of the trash and debris located on the graveled corner of the property to prevent possible transport by rain events into the stormwater drainage system. k ♦ \tr . f ` 1,4 r •410"1 4 FT+ir, r '. le.''e� . -x t iY°' .r l..4. r rN y1'u1} p_`S�'!*� ti�_ '� fv ctti 'ra„r :t. �6.�• 7w.i�f'h� > �1, p3 - 1 t\,. lksc. eR '„_ray T"�{ kt` 4 + "�. ^.•l y "•�.\ + t r t , ,.��,��,� � yrY�, ��� ��\��' '� �'t��� .n���f���Sys- �f kj�� . �'�'{ ra� ter/ i` f c,`x; 'j. :C �\� Y1i4., �� ,rr�j+�Y;. ��3^" �' rJ+ • i/� al�A;•M •„'•ti. . �.-. • •''/,,1 `•� .X`e. may -,fir' �' r 4,, ,.' i i •,_Y� ri t4`� i \7E4b ,. + t'. ,�YA r'" . _ .s? t r .�. kP h i��' f t .+i �'('�t t..•.F'y y -y y/u 1 317 -'-A„ -: r4 't'''fir�-E ' y 1 Z K '�t\x. r Q . ..!. - :-* -4%...4.' ,' .;:,,)` > 4.f,f1+� �Y p. 4' I \ t - } d t J \ ‘,' z'4 .;J YT,apy �yy E.Y-'.mod y�N /i.� ,.r\� J'yr. N }yr rt._ 'giTj,C74, ry d / 3, r a.F , r. q1 re S.17 c .i✓/' `fi +�,G, ,ate fir''._ , ,.,.%., ,.,,., .e...tot.i.sirr,„..*j w 3 .`j 3+ �@i.'1;•7:15?'ACC irtiW q y 'tYc 3. :vKr'w/° z + �'ii -'4 + ir „it, , .-4;' ...1•.::“ L:T .1.. 7I :(,te,V. Ate,) ....., 7, ' .•-•,,;t,'e M1 a -a r b N • d + /l. F;Fy;1'�'�r`n �� � �+ \�yfct ��,7\ 7� -• p - ;/�fiT L+ b� �'!i. � i tk1^� y"�;�� , Ss ya�?.ti o ' ;."`.V - „ YES+tIllill.?4s)4r: + -+�; . , a n rt r. � Fes'"" J. ��d �� " mac- i � Cf � ^+�'�� �' R-� .`}�'�' � }S 4 4 C� of �"i0: Picture 5.A white barrel filled with a green substance near the property line fence. Please properly dispose of the broken white barrel bottom holding dirty water located next to the storm water water sampling site on the property near the fence line. q f '4. _ a1 .,..-:,, • r"-`� r r t �+ f �i*3t `` +' _ �,/. • • • Picture 6 An old bucket filled with rocks and debris near a forklift that is leaking an oil based substance. Please dispose of the orange bucket sitting in front of the parked forklift,and please clean up oil-based substance spilled on the ground around the bucket and forklift. Please determine a way to prevent the forklift from leaking. ' ' ',AT , •,,,,. ,, , . , , .-Vr '• ' '1 1 •/ 14, • "1 "'limo- ----- -• 'di-2 gAtile ''' ,d,,D _ ,,-r:.--_:az...-,:: •^'' Z111( - _ / \ L. ...........ftwiat, , _____,IL__ .,-:- -- '---_- *.• , - • --- •• - 3.-- ;-Pt vp;- ' lig' 3-•.,7 ''''f*i'"C. - 'I - . ,. ' ---. .-' / :7 -- .-•,;..1.A- ,,...--- 7 ,:i: •`-%.,;•': 'q<i'.1,0"-r:Fr' -:'„,: --i- 5'., .- • •' ';-: r.11 ""- '' '. 71.,---allim-----: --''4 -. 1 -...--.... .„,.....- .,, ,':---7-..,•-...,'• ,....4ix..0 o-,,,,-;:.2. ' - ,-':-'' ilil "°4. • 1, •I.. ..4,,.."' '4 . Vi,..Ay% A'‘,.-.4" '.'": 1.-SfOr-rt-''...-ti;;::'''.4- - • -,1 ' .••••-•.''. s*,' -3,..-ii: ' ,r,t;':, , ', .,, -,,....V,4. ' : '44'• 1-4, - ,,;q :;-:.'-..•. , _ '..',t'-'.-.,:,':-::;fp-7,-k", .......',4,-P,. ,•,,: . ,'- .- ' ,. ;.,: 7, -' --.. _1 ,',.;*' '..t...,- a".„-.::.„,4.._,i;:-,';:-,-:--`.•;.•- 4';;;•ii: ..,-- - 4)--':.2 ' • ,..--; - --4. - -, 'i'''!..'° - -- . .-...-1=- ---:*----- -•.4-•*-• `,. '40,:kfRAl-',-.,•t??-Zt -:,- , ''.::: ',!.'.-.":,-;..;';'.-i -.' .1,....„...Cfp-.7'.4 .. -...,".„,:., :•'''r:,4„.,Ar .., t',.t."3941' i,./-. ,f0.-a -;'i''.2 ,--4,)-E:-- .04'41,- -,Ifik.....„ • ' . _ ' „_.;;=-,, - ' ttv,;•--,,A.„.,*,-., ,, ,..,., :.-....,-..., - , • : ,- ,,,,,,, --,,,.4.-.: . - - 1 ..: - .,.. - '- f:"._' ,'''-• -,,. ,.', -,-.4.:,4 .7 % ,--. . • • r_ - ,, ,-,.-::_.•e •-i -',.- ,,,q;''V,,".9'-• ., • - - „......-----,-...... . • .. 4. • .1;" -*-- . .- ,<4;-.::'.1. _...V°/ . Ne;te:-'...-'00•Ahri' /'' . * . Picture 7. Debris, trash,and sediment under the conveyor belt. Please dean up and properly dispose of spare parts on the ground and on the pallet and trash that is under the conveyor belt. - — • - - - - I-- . -.... .-..,-. . _. .. • .., , ------ ,.• -. . - • . . . 'Ito_ :40-- esot,% - 1,-,,,r' • .. 1 -• - 1'-'4741 11..111.111111111, • • . . . --. •• .. ..:.,.-..: ...:,.., ,,::,,-.. ;. . . ,.... • ',.. . . ..., 1 ..... ,‘,;•-•••., , .M :,•• •• : 1 \ .... • N •- . _••• ,. .. , „ ,.. ,-, - \ „ • -,-55,.., IL.. ,.444iiti ,,,, , , . • , _ , .. Picture 8. Gravel underneath and beside cement tiuck next to storm water channel. Please clean up and properly dispose of gravel that is underneath the concrete truck that is awaiting to be repaired or disposed of which is beside the settling basin near the back corner of the office. 1 444,0 1.4 1,i .. - • •• it'eS.� _ . �� k.e • 1. ''c' . Picture 9. Storm water channel with sediment and debris next to the fence line by the office building. Please clean the gravel,sediment, trash,and debris from the entire storm water channel that is a part of the settling basin.Also,please remove all trap and contained dirt at the discharge point of the settling basin to prevent storm water sollution yy - =4 v 2' S.? •'"malt r - * ''.' a .e.� ac ill* • ,•, { "- 1- f i -- Aj� i•C f[-1_ t • 1 -fir .. �- w 4 1 Y Lt§� y a S\ - • / .fit 9�w * $£ � { Y { pSyiFls� tZ T> +r l' H .� Ya , 1 to , r .' 7 trf y, ', tr 1 kF YF ! F M 7. I�� r b uv ya l�! ai ,it » -' . �i : .'. 0.1,71',' ,��,.,�. r �r . • P �yr '.. f - •.,s. ,. { � •, • ilp Y✓ } -, ik a -- �W ! A , 4- . A1 ` ,} ;p a - W 1 4. 0 :..F7. •. 1 ' •-'4't ?Ill t° lx ,. ' l #`J ' •7. .bi r - ¢a 5.,,. t-. .fir Picture 10. Oil spots on the pavement between the office building and the fence. Please clean up all fresh all oil spots on the with oil dry and dispose of all the absorbents used to perform this action.