Loading...
HomeMy WebLinkAbout20240122 Ver 1_USACE Correspondence_20240202Chandler, Rebecca D From: Harmon, Richard G CIV SAW <Richard.G.Harmon@usace.army.mil> Sent: Tuesday, February 20, 2024 3:16 PM To: Laura Rudolf; George Junkin Cc: Bowers, Todd; Chandler, Rebecca D Subject: [External] TRANSCO ROW @ Town Creek Rockingham County, NC: Provisional Nationwide Permit 12: SAW-2024-00081 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Dear Ms. Rudolf and Mr. Junkin: This correspondence is in response to a Pre -Construction Notification (PCN) received on 11 January 2024, and considered complete on 18 January 2024. In submitting the PCN, you requested verification that the proposed project is authorized by a Department of the Army (DA) Nationwide Permit (NWP). The work affecting waters of the United States is part of an overall project known as the TRANSCO ROW @ Town Creek. The activities in waters of the United States include excavating the exposed natural gas pipeline for maintenance including the inspection, sandblasting, and recoating of the pipeline. Upon recoating, the exposed pipeline will be encased in concrete . The Site is located approximately 0.5 miles northeast of Moir Mill Road, Eden, Rockingham County NC. This letter is a provisional notification that your proposed project has been reviewed under NWP-12. In accordance with 40 CFR Part 121 (401 Rule), the Corps cannot take final action on the NWP verification request until the procedures outlined in the 401 Rule for an individual Water Quality Certificate (WQC) have been completed. Specifically, a Department of the Army (DA) permit or verification cannot be issued until a Section 401 WQC has been either issued, waived, or denied, and the neighboring jurisdiction review process described in 40 CFR 121 has been successfully completed. Conditions of the Individual Section 401 WQC will generally become conditions of any final NWP verification letter. Should state action on the required WQC approve a project different from that shown on the current application, a modification to the PCN will be required. You should notify our office of any such changes as substantial changes may require further evaluation. As stated above, this is a provisional notification. This letter does NOT provide Department of the Army (DA) authorization. You are cautioned that commencement of the proposed activity(ies) requested prior to receiving a written DA authorization would constitute a violation of Federal law and subject you to further enforcement action. Receipt of a certification from the state (e.g., NC Division of Water Resources and/or NC Division of Marine Fisheries) does not preclude the requirement for obtaining DA authorization (e.g., an NWP verification letter) prior to commencing the work. In all future correspondence, please refer to file number SAW-2024-00081. This correspondence has also been copied to State and/or Federal agencies for their information. If you have any questions, please contact Dicky Harmon at 919-724- 8773, or by email at Richard.G.Harmon@USACE.Army.mil. Sincerely, Dicky Harmon Regulatory Specialist, Raleigh Field Office U.S. Army Corps of Engineers — Wilmington District CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: 919.801.8990 Email: Richard.g.harmon@usace.army.mil