HomeMy WebLinkAbout20150497 Ver 1_Certification of Completion_20151102ATJ
CCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory Donald R. van der Vaart
Governor Secretary
DWR Project No.: /S7-0q'1-7
Applicant:
County: 91t
Project Name:
Date of Issuan
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 and Buffer Permitting Unit, North
Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to
DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from
all of these.
Applicant's Certification
I, M cgxr � n n t ew I , hereby state that, to the best of my abilities, due care and diligence was used
in the observation of the construction such that the construction was observed to be built within substantial compliance and
intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: Date: 10 2l tS
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and diligence was used
in the observation of the construction such that the construction was observed to be built within substantial compliance and
intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e., Engineer, Landscape
Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time)
the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used
in the observation of the construction such that the construction was observed to be built within substantial compliance and
intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature:
Date
401 & Buffer Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699 -1650
Phone: 919.807 -63001 FAX. 919 - 807 -6494
Internet, http://portal,ncdenr.org/weblwq!ws
An Equal Opportunity 1 Affirmative Acton Employer
Registration No.
RECEIVED
NOV 0 2 2015
DENR -LAND QUALITY
STORMWATER PERMITTING