Loading...
HomeMy WebLinkAbout20151120 Ver 1_DOT e-mail_20151109 Ward, Garcy From:Peele, Catherine D Sent:Monday, November 09, 2015 4:29 PM To:Wheeler, Tracey L SAW; Ward, Garcy Cc:Winslow, Lancelot D Subject:RE: PCN Cover Letter (UNCLASSIFIED) Attachments:East and West Area.pdf Tracey, The excavation will follow the current permitted dimensions of 150’ wide by a -12’ depth. The attached survey shows the cross section of the channel. It should be noted that we are not requesting authorization to dredge the entire surveyed area, only a portion on the West and East end. The area to be dredged is outlined in black on the attachment. The length of area that would be dredged on the West side is 800’ while the East side is 400’ for a project total of 1,200’. The depth of the connecting waters on either side of the channel is between 15' - 20'. -----Original Message----- From: Wheeler, Tracey L SAW \[mailto:Tracey.L.Wheeler@usace.army.mil\] Sent: Monday, November 09, 2015 4:13 PM To: Peele, Catherine D; Ward, Garcy Cc: Winslow, Lancelot D Subject: RE: PCN Cover Letter (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Cat, I need to know the dimensions of the channel you want to excavate for the permit. Length, width and proposed depth. And I need to know the depth of the receiving waters so I can show that you are not dredging deeper than the water at either end. Tracey Tracey L. Wheeler Regulatory Project Manager U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 West 5th Street Washington, North Carolina 27889 (910) 251-4627 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. -----Original Message----- From: Peele, Catherine D \[mailto:cdpeele@ncdot.gov\] Sent: Thursday, October 29, 2015 3:42 PM To: Wheeler, Tracey L SAW; Ward, Garcy Cc: Winslow, Lancelot D 1 Subject: \[EXTERNAL\] PCN Cover Letter Good Afternoon, Please see the attached cover letter describing the dredging activities that the NCDOT Ferry Division is seeking approval. In addition to the work description the Ferry Division also requests to repeal the Individual Permit that was submitted to the US Army Corp. of Engineers on September 1, 2015. If you need any additional information please contact me. Thank you, Catherine Peele Environmental Specialist Ferry Division 252 305 7288 mobile cdpeele@ncdot.gov 159 Lucinda Drive Powells Point, NC 27966 cid:image001.png@01D10DA4.5CC88DA0 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties ________________________________ 2 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Classification: UNCLASSIFIED Caveats: NONE 3