Loading...
HomeMy WebLinkAbout20151021 Ver 1_B4792_Polk Bridge No. 4_404 REVISED Culvert Avoid and Min_20151112[ li�,ll��'�l�' North Carolina D�partment of Transpmrtation � ���7r�z����ci1!�r ]iighway Storrsirvater Program �/'� STQRMWATER MAFiAGEMEN7 PLA�I ��=�i (Venian 2.01; Rcleased Oecomber 2014) FOit NCDQT PRb,tECTS WBS Element: 3&5fi2.1.7 71P No.; 8-4792 Coun ies : Polk Pa e 3 oF 3 Bridge to GuEve�^t Auaidance and Mireimizatian Pro osed Struttur� Surroma Sheet No. & 5tation Sheet h1o.: 4 Station: 12+�1.63 hJumber of Culverts: Z Draina e Area ac or s mi : 2.a9 S. E�fles Culvert WidthlDiameter ft: 11 Surface Watcr Bod : ;1)Fork Creek Culvert Hei ht ft: 6 Culvert T e: Reinforce4 Concrete Box Culvert Culvert Len th ft 48.57 Avpidanee and M�nimizatian Efforts: Have made attempts ro avoid impacts to streams and wetlands to the greatest extent practicable in the design of the preferred altemative. Design (8ridge ta Gulve�rt) Standards in Sensrstive Watersheds was followed during khe project design due to NCWRC designatian of trout waters. Stream Slo o Fish andlor A uatiC Li e assa a Existin Avera e Stream Slo e%: __ 3.$0 °/a __ Existing Low Flow ChanRel Dimensions Low flow dimensions were about 24'. No Pro osed Gulvert Sfo e%: 4.00 % in the Stream: natural defin�tiv� low flow Ch�nnel. Gul ert Burial Pro osed Culvert Burial De th ft: 1 Existing Streambed Material: Alluvial sand, gravel, cobbdes and boulders Proposed Low Flow Dimensions Proposed low flpw dimensipns are both barrels Tiirough the Culv€rt: of the culvert (22'} Proposed SillslBaffles: 1 ft. sill across both barrels in inlet and outlet. Existing �.ow Flow Welacities in the g,g ips Stream €Us ; ' ropose ow ow e oc�ties roug thc Gu�vert ft!s ; $.9 fps AEternating Low Flaw SillslBaffles: 1 fr. sill acrflss both barrels in inlet and outlet. Culvert slope �2%. Cuiuortl5tream Ali nment Stream Pattems U�astream and Downsteeam None noted. of the Culvert that Cvuld AfFect Fish Passage and Bank Stability: Bcd Form$ Impacted by CulverC (rifffes, Stream is on 4% grade, no pools nr gfides exist. pools, g[ides, etc.): Low Flow Floodplain Bench Required7 No (provide justificationy Sharp Bends at Inlet+0utlet? No (d�SCribe tulvert dli nment with stream) S4ream Reafignment Necessary? {provide �o justificatior�} Bank Stabiiiiation: 13A37 tons of Class I rip-rap used for approximacely 25 feet along stream on each bank. boYh at the inlet and the outl�t of the culuert. pukfet Vetocities Natural Stream Ghannel 2- r Veloci ft!s : N!A �latural Stream Channel 't0- r V�[oci dffls : 7.1 Pra osed Gulver[ 2- r dutlet Veloci ftls : N!A Pro osed CulverY 10- r Outlet Veloci ft!s : 4.36 Roadwa Geometric Considerations EualuatelDescripe Roadwa Gcometric Cortstraints: Phased construCtian to be used during bridga removal and Cui�eR installatian.