HomeMy WebLinkAbout20071468 Ver 1_Approval Letter_20071108.. O~O~ W gTF9QG
~ ~ r
~ :~
D <
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natwal Resources
Colleen Sullins, Director
Division of Water Quality
November 8, 2007
DWQ Project #,2007-1468
Beaufort County
June Cherry
164 Warren Lane
Belhaven, NC 27810
Subject Property: Lot #62, Kilby Island s/d
Bath, NC
Mixon Creek, Tar-Pamlico River Basin; 03-03-07, 29-23; (SC; NSV~
APPROVAL for the use of the "General" MAJOR VARIANCE; From the Neuse and Tar-Pamlico Riparian
Buffer Rules for the Construction of Residential Structures on Existing Lots within the Coastal Counties as
defined by the Coastal Area Management Act with Additional Conditions
Dear Ms. Cherry:
You have our approval, in accordance with the conditions listed below, to impact 1200 feet (ft2) of Zone 2 of
the protected riparian buffers for the purpose ofconstructing asingle-family residence on the subject property
as described within your application dated August 30, 2007, and received in full on August 30, 2007. This letter
shall act as your approval for the use of the "General" Major Variance; From the Neuse River Riparian Buffer
Rules for the Construction of Structures on Existing Lots within the Coastal Counties as deftned by the Coastal
Area Management Act with ADDITIONAL CONDITIONS as approved by the Water Quality Committee
(WQC) of the Environmental Management Commission (EMC) on November 10, 2005. In addition, you
should get any other required federal, state or local permits before you proceed with your project including (but
not limited to) Sediment and Erosion Control and CAMA permits. This approval shall expire in five years from
the date of this letter.
This approval is for the purpose and design that you described in your variance request. If you change your
project, you must notify us and you may be required to send us a new request for approval. If the property is
sold, the new owner must be given a copy of this approval and plat thereby assuming responsibility for
complying with all conditions. This approval requires you to follow the conditions listed below.
North Carolina Division of Water Quality Internet; www,ncwaterqualitv.or¢
943 Washington Square Mall Phone: 252-946-6481 ~TOne
Washington, NC 27889 FAX 252-946-9215 it ~ Carolina
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10°k Post Consumer Paper atura!!r~
..~.
The Additional Conditions of the Certification are:
1. No Zone 1 Impacts
No impacts (except for proposed and "exempt" uses as identified within 15A NCAC 2B .0259(6)) shall
occur to Zone 1 of the protected riparian buffers unless otherwise approved by the DWQ. No
impervious surfaces shall be added to Zone 1, unless otherwise approved by the DWQ
2. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return the attached certificate of
completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 943 Washington
Square Mall, Washington, NC 27889.
3. Diffuse Flow
All new stormwater drainage shall be directed to vegetated areas as diffuse flow at non-erosive
velocities prior to entering the protected ripazian buffers as identified within 15A NCAC 2B .0259(5).
No new ditching or piping of stormwater through the protected buffers is allowed
If you do not accept any of the conditions of this approval, you may ask for and adjudicatory hearing. You
must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that
conforms to Chapter 1 SOB of the North Cazolina General Statutes to the Office of Administrative Hearings to:
6714 Mail Service Center, Raleigh, NC 27699-6714. This approval and its conditions aze fmal and binding
unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under the Taz-Pamlico River Riparian Buffer
Protection Rules (15A NCAC 2B .0259 (9)(c)). Please contact Chris Pullinger at 252-948-3920 if you have any
questions or require copies of our rules or procedural materials.
Sincerely,
A Hodge%Sup rv si or
Division of Water Quality
Surface Water Protection
Washington Regional Office
Enclosures: Certificate of Completion
Plat (drawing of impacts)
cc: DWQ WaRO Regional Office
DWQ Central Office, Ian McMillan
Central Files
Beaufort County Building Inspections
CAMA (Washington Office)
_f_
;~~ :~:
.... ~~~ Jti ~ ~..3 yfiC:11 .:r__.-c u~, _ _ - 'aav'a~',~,_
' ~ Da1'i i..~
i aswV • - ~ s~^,3 +~M+1o•At
g,~3V1:~33 a0 a3~aaa~lOSAtii131 ~ f ~ 1
p~• 1 f3~tfJS UN'!'1S1 az; i~~
8861'Oi 11~1V~3b~0 A3A~1f1i • yZ d'OZ 8 W 3dld NO!!1 M3N0
ou;~ao~ v1~oN ~ v ' i si a a
;(;uno~ 1~ynor g 4;4turlo1 4108 ass d ' sas ,d u 3dld Nuns aNfio~ r
r~ox~a ~~ ~Nnr 3,~ ON 7031
:10 ~;ardo~d
~M
.o
N
tD ~
~n
ti l.+
'D u
U fJ ~
~ ~
u
. W
~' N ~
m f' N
a r
fn
fl
J
~' Y
' .
_.._-~t>ai • ~'s of
7~~c5 vrv -ao W V'~'v
~~ ~ ~ 7 _~~111 ~ 17 N~
C
yu L"d .._.
es's
°y~i~a.ea*z`
:.~I
Mr1'
a+lr a>fY
(11011 a1Na aau
~• ..wd
ly p r01L11ialt! pr a ti
Iw+a •awa~~r
ar•^o•aw•aw •~ as-~-yy r-ul
I• »~ Aa-1' •1 yglntars0 • t7
« arnl
aa^nw t•o~nrs• also trn-av
rwlio~.a luro^ r^uaw• ~^ f
~^-T1Y1Y' p
~' oa•^rt^r •.
n~ •1^a ar^1
•~ ~~'
n as,wno •^r
ra ^oours•n• ~