Loading...
HomeMy WebLinkAbout20071468 Ver 1_Approval Letter_20071108.. O~O~ W gTF9QG ~ ~ r ~ :~ D < Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natwal Resources Colleen Sullins, Director Division of Water Quality November 8, 2007 DWQ Project #,2007-1468 Beaufort County June Cherry 164 Warren Lane Belhaven, NC 27810 Subject Property: Lot #62, Kilby Island s/d Bath, NC Mixon Creek, Tar-Pamlico River Basin; 03-03-07, 29-23; (SC; NSV~ APPROVAL for the use of the "General" MAJOR VARIANCE; From the Neuse and Tar-Pamlico Riparian Buffer Rules for the Construction of Residential Structures on Existing Lots within the Coastal Counties as defined by the Coastal Area Management Act with Additional Conditions Dear Ms. Cherry: You have our approval, in accordance with the conditions listed below, to impact 1200 feet (ft2) of Zone 2 of the protected riparian buffers for the purpose ofconstructing asingle-family residence on the subject property as described within your application dated August 30, 2007, and received in full on August 30, 2007. This letter shall act as your approval for the use of the "General" Major Variance; From the Neuse River Riparian Buffer Rules for the Construction of Structures on Existing Lots within the Coastal Counties as deftned by the Coastal Area Management Act with ADDITIONAL CONDITIONS as approved by the Water Quality Committee (WQC) of the Environmental Management Commission (EMC) on November 10, 2005. In addition, you should get any other required federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control and CAMA permits. This approval shall expire in five years from the date of this letter. This approval is for the purpose and design that you described in your variance request. If you change your project, you must notify us and you may be required to send us a new request for approval. If the property is sold, the new owner must be given a copy of this approval and plat thereby assuming responsibility for complying with all conditions. This approval requires you to follow the conditions listed below. North Carolina Division of Water Quality Internet; www,ncwaterqualitv.or¢ 943 Washington Square Mall Phone: 252-946-6481 ~TOne Washington, NC 27889 FAX 252-946-9215 it ~ Carolina An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10°k Post Consumer Paper atura!!r~ ..~. The Additional Conditions of the Certification are: 1. No Zone 1 Impacts No impacts (except for proposed and "exempt" uses as identified within 15A NCAC 2B .0259(6)) shall occur to Zone 1 of the protected riparian buffers unless otherwise approved by the DWQ. No impervious surfaces shall be added to Zone 1, unless otherwise approved by the DWQ 2. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 943 Washington Square Mall, Washington, NC 27889. 3. Diffuse Flow All new stormwater drainage shall be directed to vegetated areas as diffuse flow at non-erosive velocities prior to entering the protected ripazian buffers as identified within 15A NCAC 2B .0259(5). No new ditching or piping of stormwater through the protected buffers is allowed If you do not accept any of the conditions of this approval, you may ask for and adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 1 SOB of the North Cazolina General Statutes to the Office of Administrative Hearings to: 6714 Mail Service Center, Raleigh, NC 27699-6714. This approval and its conditions aze fmal and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under the Taz-Pamlico River Riparian Buffer Protection Rules (15A NCAC 2B .0259 (9)(c)). Please contact Chris Pullinger at 252-948-3920 if you have any questions or require copies of our rules or procedural materials. Sincerely, A Hodge%Sup rv si or Division of Water Quality Surface Water Protection Washington Regional Office Enclosures: Certificate of Completion Plat (drawing of impacts) cc: DWQ WaRO Regional Office DWQ Central Office, Ian McMillan Central Files Beaufort County Building Inspections CAMA (Washington Office) _f_ ;~~ :~: .... ~~~ Jti ~ ~..3 yfiC:11 .:r__.-c u~, _ _ - 'aav'a~',~,_ ' ~ Da1'i i..~ i aswV • - ~ s~^,3 +~M+1o•At g,~3V1:~33 a0 a3~aaa~lOSAtii131 ~ f ~ 1 p~• 1 f3~tfJS UN'!'1S1 az; i~~ 8861'Oi 11~1V~3b~0 A3A~1f1i • yZ d'OZ 8 W 3dld NO!!1 M3N0 ou;~ao~ v1~oN ~ v ' i si a a ;(;uno~ 1~ynor g 4;4turlo1 4108 ass d ' sas ,d u 3dld Nuns aNfio~ r r~ox~a ~~ ~Nnr 3,~ ON 7031 :10 ~;ardo~d ~M .o N tD ~ ~n ti l.+ 'D u U fJ ~ ~ ~ u . W ~' N ~ m f' N a r fn fl J ~' Y ' . _.._-~t>ai • ~'s of 7~~c5 vrv -ao W V'~'v ~~ ~ ~ 7 _~~111 ~ 17 N~ C yu L"d .._. es's °y~i~a.ea*z` :.~I Mr1' a+lr a>fY (11011 a1Na aau ~• ..wd ly p r01L11ialt! pr a ti Iw+a •awa~~r ar•^o•aw•aw •~ as-~-yy r-ul I• »~ Aa-1' •1 yglntars0 • t7 « arnl aa^nw t•o~nrs• also trn-av rwlio~.a luro^ r^uaw• ~^ f ~^-T1Y1Y' p ~' oa•^rt^r •. n~ •1^a ar^1 •~ ~~' n as,wno •^r ra ^oours•n• ~