HomeMy WebLinkAbout20240094 Ver 1_More Info Requested_20240312ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
NORTH CAROLINA
Environmental Quality
March 12, 2024
DWR # 20240094
Mecklenburg County
Charlotte Water
Attn: Mr. Michael Vaniska
5100 Brookshire Blvd.
Charlotte NC 28216
Delivered via email to: Michael.Vaniska@charlottenc.gov
Subject: REQUEST FOR ADDITIONAL INFORMATION
Mallard Creek Interceptor— Phase 1 Project
Dear Mr. Vaniska:
On January 9, 2024, with fee received on January 19, 2024, the Division of Water Resources (Division)
received your application requesting a 401 Individual Water Quality from the Division for the subject
project. The Division has determined that your application is incomplete and cannot be processed. The
application is on -hold until all of the following information is received:
In the PCN Under Avoidance and Minimization it states, "Trenchless boring under the
stream... carries risk ... option was abandoned from further consideration." Boring is used
throughout the state in various projects to minimize stream impact / potential WQ issues from
trenches. Further justification is needed to adequately document that all reasonable avoidance
and minimization efforts have been taken.
2. A few plan sheets show the limit of disturbance up to the top of streambank. Standard 401
Certification requirement states "Any utility construction corridor that is parallel to a stream or
open water shall not be closer than 10 feet to the top of bank or ordinary high-water mark." If
this requirement cannot be met in a specific location, please identify that location and provide
details of why the project cannot be modified to meet this condition. Please also submit a very
detailed construction sequence that includes additional measures that will be taken to protect
long term stream stability and to protect downstream water quality standards.
3. There is a tributary stream crossing near STA 0+00 on Plan sheet C-3 that is not included in
impacts. Please explain. See "What is this Crossing?" in image below.
North Carolina Department of Environmental Quality I Division of Water Resources
�FQ 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611
919.707.9000
Depanm of Enrl. a .1 Qu.1i�
Mallard Creek Interceptor— Phase 1- Project
DWR# 20240094
Request for Additional Information
Page 2 of 3
rJ471 w7rw w�a skr�rt ran'7 > - "Y'••'1 , 1-,
0+00 1+00 2+00 3+00 4+00
Pi1DP. OUT 549.64 (72-)
w1E7LAND@1
(TEMIPORARVDpTURBANCE1 :Try: F'. i'• ..I, TIF:F'^KCES
0LEAP..ING AID PIPE INSTALIATIDFI AREA,=9716 SF Ct. LA .RINI� r.VL' :1 II. - G!.
_
PROPOYJED 54PROPOSED l2"
SEWER.TYK 3EUgER TFMI . 7LIY`S�E ? ;.: f 1 G^— '•T
(BE E BH EET C.;:4} Cr NNECTli70. G(?WNECfIDNI JIF:I =.v ......•1,3
r+ �# (SEE Z HEFT L.:r ATpe
!-► l I V V YYrI}Inr1.:5R Ir. ��l )
� L
STREAM A
,A.. — ...
- C fC lif l3i at':. 1
!. rA. !+/G. tJ -. lalpr u•rli.
.*Pd AA
s r µ
+'y 2.0.22al.tvvpWrarrvylelrbaix:eryMuwr +
I
a 11 1 a
rT. �ntr*
,ie 1
7 ?�r�y yy+t cast, 1
PRIORP
77
TLh,NQ#t''� 7I 1-FT .:Ir.r
UVE
f PET11=ET QISTUR�AJ Fi
- - ��` INa^, ARID PIPE INSTi. Tli rrJ ,;.F. FAQ �7& _.� r
C�.IPS 3�LG•7t1* _. _
'BY C-HE?S'
(Snippet from plan sheet C-3. Reference for item 3 above)
4. The PCN states stream crossings meet standard requirements; however, there are stream
crossings (approximate locations below) that do not appear to be perpendicular. Standard 401
Certification requirement states, "Where there are temporary or permanent impacts from stream
crossings, utility lines shall cross the stream channel at a near -perpendicular direction (i.e.,
between 75 degrees and 104 degrees to stream bank)." Please explain/verify crossings are
between 75 degrees and 105 degrees to the stream bank and provide justification if not.
• STA 4+00 on Plan Sheet C-3 Labeled Perennial Stream A (also shown in image above and on
Plan Sheet C-18)
• STA 39+00 on Plan sheet C-6 Labeled Intermittent Stream D
• STA 145+60 on Plan Sheet C-15 Intermittent Stream K
• STA 0+60 on Plan Sheet C-21 Perennial Stream H
5. The Plan Sheet C-28 appears cut-off and there is no legend. Please correct as needed or clarify.
6. Many of the Erosion Control and Construction Plan Sheets are not legible when magnified. Submit
a higher quality copy of just these plan sheets (EC-1 to C-31) or also submit the information in a
separate document. Include specifics for each section of the project.
7. A waiver is requested for construction corridors in excess of 40 feet wide. Standard 401
Certification requirements state, "Construction corridors in wetlands and/or across stream
channels shall be minimized to the maximum extent practicable and shall not exceed 40 feet
wide." The request is reasonable for this type of project; however, the plans appear to show a
North Carolina Department of Environmental Quality I Division of Water Resources
D_E 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611
NORT! CAROL, NA \\ryryyy\\ 919.707.9000
napar MFnWMnMffW OWI�
Mallard Creek Interceptor— Phase 1- Project
DWR# 20240094
Request for Additional Information
Page 3 of 3
proposed width of 80 feet or more for most of the project. Is this necessary? Note that
MINIMUM width of disturbance is the requirement.
Standard 401 Certification regulation states, "Permanent maintained access corridors in wetlands
and across stream channels shall be restricted to the minimum width practicable and shall not
exceed 30 feet wide." Many of the plan sheets reference permanent easements that appear to be
off the centerline of the proposed SS. Permanent easements are different than permanent,
maintained corridors. Do you intend to have permanent, maintained corridors wider than 30
feet? If so, justify.
9. On the PCN item G.3b. requires a narrative description. Please provide.
Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested
information for the proper consideration of the application. Please respond in writing within 30
calendar days of receipt of this letter by sending one (1) copy of all of the above requested information
to the 401 & Buffer Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617 OR by
submitting all of the above requested information through this
link: https://edocs.deg.nc.gov/Forms/Supplemental-Information-Form (note the DWR# requested on
the link is referenced above).
If all of the requested information is not received within 30 calendar days of receipt of this letter, the
Division will be unable to approve the application and it will be denied as incomplete. The denial of this
project will necessitate reapplication to the Division for approval, including a complete application
package and the appropriate fee.
Please be aware that you have no authorization under the Section 401 of the Clean Water Act for this
activity and any work done within waters of the state may be a violation of North Carolina General
Statutes and Administrative Code.
Please contact Maria Schutte at 704-235-2184 or.Maria.Schutte@deg.nc.gov if you have any questions
or concerns.
Sincerely,
EA
DocuSigned by:
�w H P44ft
F161FB69A2D84A3...
Andrew H. Pitner, P.G., Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Electronic cc: Megan Bollero, Carolina Wetland Services, Inc.
Samantha Dailey, USACE Charlotte Regulatory Field Office
DWR 401 & Buffer Permitting Branch file
Filename: 20240094 Mallard Creek Interceptor— Phase 1 project - Mecklenburg - addinfo.docx
D � ��� North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611
NORT! CAROL, NA \\ryryyy\\ 919.707.9000
nap — M EnWMnMffW Qppl�