Loading...
HomeMy WebLinkAboutNCC240685_ESC Approval Submitted_20240311 From: SVC DoNotReply-DEoPermits DoNotReply-DEOPermits@deq nc gov e Subject: NC DEMLR-FROF Application Approval with Modifications Needed CRM.0170039 Date: February 26.2024 at 2 30 PM To: Siena Signature Homes Inc jhersome@gmail corn •• North Carolina Department of Environmental Quality Division of Energy,Mineral&Land Resources Land Quality Section Roy Cooper Governor Elizabeth S.Biser Secretary William Vinson Jr.(Acting) Director 02-26-2024 Siena Signature Homes Inc 195 Burkeview Court Lexington,NC 27295 RE: Project Name:278 Painted Trail Lexington NC Lot 24 Wynnfall Acres Approved:0.46 Application ID:PA-003238 Permit Number:DAVID-2024-0122 Address:278 Painted Trail City:Lexington County:Davidson River Basin Yadkin-Pee Dee Stream Classification:C:Aquatic Life,Secondary Contact Recreation,Fresh water Plan Type:New Plan Dear Siena Signature Homes Inc. This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter o1 Approval with Modifications. The Modifications Required for Approval are listed on the attached page. The Certificate of Approval must be posted at the job site. This plan approval shall expire three(3)years following the date of approval,if no land-disturbing activity has been undertaken,as is required by Title 15A NCAC 4B.0129. As of April 1,2019.all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)lorry requesting a Certificate of Coverage(COC)under the NCG010000 Construction General Permit After the form is reviewed and found to be complete.you will receive a link with payment instructions for the$120 annual permit fee.After the fee isprocessed,you will receive the COC via email.As the Financially Responsible Party shown on the FRO form submitted for this project,youMUST obtain the COC prior to commencement of any land disturbing activity.TheeN011orm may be accessed at avu_m.gsjy:Ncuut Please directquestions about theeN011omi tothettarniwater f_'Plgritm;ern the Raleigh central office It the owner/operator of this project changes in the future,the new responsible parlymust oblaina newCOC Title 15A NCAC 4B.0118(a)and the NCGOI permit require that the following documentation be kept on tile at the job site 1. The approved E&SC plan as well as any approved deviation 2. The NCG01 permit and ttie COC,once it is received 3. Records of inspections made dunng the previous 12 months. Also.this letter gives the notice required by G.S 113A-61 l la)of our right of oenodic inspection to ensure compliance with the approved plan North Carolina s Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties If.following the commencement of this project,the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973(North Carolina General Statute 113A 51 through 66),this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations. and rules In addition,local city or county ordinances or rules may also apply to this land-disturbing activity This approval does not supersede any other permit or approval Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form,which you provided. You are requested to file an amended form if there is any change in the information included on the form This permit allows for a land-disturbance,as called for on the application and plan,not to exceed the approved acres Exceeding the acreage can be a violation of this permit and may require a revised plan and additional application fee. In addition,it would be helpful if you notify this office of the proposed starting date for this project. Modifications Required for ARRroyal: 1 Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application 2 Please notify this office prior to your pre-construction conference for this project by calling(336)776-9800 and asking to speak with the Land Duality inspector for your county Permission must be obtained and granted from NC DEO DEMLR prior to the removal of any ESC measures (GS 113A-51, 1SA NCAC 4B 0120) 3 Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan,a site regulated under the Mining Act of 1971,or a landfill regulated by the Division of Solid Waste Management Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations [15A NCAC 4B 0110) 4 Additional measures may be required-The applicant is responsible for the control of sediment on-site If the approved erosion and sedimentation control measures prove insufficient,the applicant must take those additional steps necessary to stop sediment from leaving this site [15A NCAC 4B 0115) 5 The NCGO1 has a 5120 yearly fee and our office often receives closure inspection requests days prior to yearly NCGO1 fee payment due dates Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination (NOT)to terminate NCGO1 coverage The closure inspection should not be requested until atter the site has achieved full vegetative stabilization and measures have been removed The removal of temporary ESC measures,including basins,requires prior approval Often a full growing season is necessary between initial seeding/mulching and removal of measures Please plan your construction accordingly to avoid contacting our office prematurely for a closure inspection Also be advised you may be asked for representative site pictures prior to a closure inspection [General Comment) Your cooperation is appreciated. Sincerely, North Carolina Department of Environmental Duality Division of Energy.Mineral 8 Land Resources Land Duality Section Enclosures'Certificate of Approval Modifications Required for Approval - North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources jy W338778-inston-Salem9B00 Hiji eonal Office ) 450 West Hanes Mill Road,Suite 300 I Winston-Salem NC,27105 D Q/ FrW rangpaadrw to and Yam NI wmw miry be it441K1 b M Nair Grow Pubic RorarW Lim and miry W&Wooed a Mil Ws*of r,MAtwiub WWI vwur Application Report PM pdt