Loading...
HomeMy WebLinkAboutNCG110070_Renewal COC Notification Email_20240306 Georgoulias, Bethany From: lase rfiche.ncdenr.gov@mccicloud.io Sent: Wednesday, March 6, 2024 12:42 PM To: edward.goscicki@co.union.nc.us Cc: Cook, Brittany; Georgoulias, Bethany Subject: [External] Stormwater General Permit Issued Effective Mar 1 / Renewal COC - NCG110070 Attachments: NCG110070_Renewal COC_20240301.pdf Importance: High CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Dear NPDES NCG110000 Storwmater Permittee: The N. C. DEMLR Stormwater Program has reissued General Permit NCG110000, under which this facility is covered. Our Program posted the draft General Permit for public comment from December 1, 2023, to January 10, 2024. The new General Permit became effective on March 1, 2024. Certificates of Coverage (COCs)for permittees who did not owe fees were renewed automatically. The attached renewal COC replaces the one issued last year. The renewal COC for this facility is attached and is being mailed out by hard copy to the Responsible Official associated with this Owner Entity.With this email, we are also reaching out to permit and facility contacts in our system as of 2/26/2024 so that the information gets to all the right people. (If any contacts needs to be updated, please submit a request at: https://edocs.deq.nc.gov/Forms/SW-Permit- Contact-Updates) Permit COC No.: NCG110070 Permittee: Union County Facility Name: Crooked Creek WWTP#2 Facility Location:4015 Sardis Church Rd, Monroe, NC County: Union New General Permit: Please familiarize yourself with the new permit by visiting our General Permits webpage (https://www.deq.nc.gov/about/divisions/energy-mineral-and-land- resources/stormwater/stormwater-program/npdes-industrial-program/general-industrial-permits). Analytical Monitoring:The renewed General Permit NCG110000 contains indicator monitoring for all permittees.After a 9-month grace period, required analytical monitoring begins in Quarter 1 2025 (January 1 —March 31). If you have any questions concerning this permit, please contact our NPDES General Permits Coordinator, Brittany Cook, at(919) 707-3648, or by email at brittany.cook@deq.nc.gov. Sincerely, i The DEMLR Stormwater Program This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored. 2