HomeMy WebLinkAbout20151173 Ver 1_Application_20151109 (2)Transportation
PAT McCRORY
Cavernor
NICHOLAS J. TENNYSON
Secretary
NCDENR-D WR
Transportation Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699-1650
Attention:
Subject:
Dear Sir:
November 9, 2015
Rob Ridings
NCDOT Division 5 Coordinator
Project Number (aka WBS number): 17BP.S.R.52
Struchire No. 380093 over Owen Creek on SR 1156 (Harper Renn Road) in Granville
County
The North Carolina Department of Transportation (NCDOT) proposes to replace this bridge. This project
is similar in nature to projects processed under the Low Impact Bridge ReplacemenY Program (LIBRP).
Accordingly, the LBRP format has been utilized in the permitting of this project. A site visit was
conducted by USACE on April 9, 2014. Note that construction of this bridge replacement project does
not result in impacts to any Waters of the United States.
The following are attached to this cover letter:
Low/Minimal Impact Bridge Data Sheet
Attachment L: LIBRP impact data sheet
Stormwater management plan
Riparian buffer permit drawings
Jurisdictional resources summary sheets
If you have any questions or need additional information, please contact Mr. Chris Murray aY (919) 220-
4633.
Sincerely,
� U � J. Hopkins, P: �
'-'�� Division Engineer
c: Division 5 file, NCDOT
Eric Alsmeyer, USACE
�Nothing Compares�_
$tatcofNOrthCarolina I Depar�mentofTranspo�Te[ion ; DivisionFiveOfSce
2612 Norch Duke Street � CS k 79-27-03 I Durharn, NoN� Carolina 2"1704
919-220-4600 Telephone I 919-560-3371 Fax
Low/Minimal Impact Bridge Project Data Sheet
11/5/2015
A��',l�
NCDENR
North Carolina Department of Environment znd Natural Resources
Didsion of'.`>&�--�uality
Pa;�.:c; L �: cCrory Cole��� H. S�Ilins
Govercor D;:ector
C ��a!�1 R. san der V=art
Seretary
Attachment L: Low Impact Bridge Replacement Process
Project Number (aka WBS number): 17BP.5.R.52
Bridge No. 380093 over Owen Creek on SR 1156 (Harper Renn Rd.) in Wake Co.
This project can be characterized as meeting the parameters associated with the Low
Impact Bridge Process as agreed to on October 6, 2009. Accordingly, this project
meets the documentation requirements and approval procedures under NEPA, as
defined by FHWA, for Low Impact Bridge Replacements. This project meets the
standards of NCDOT Minimum Criteria Rules.
Date: November 9, 2015
Applicant Name: Joey Hopkins, P.E.
Applicant Address: 2612 N. Duke Street
Durham, NC 27704
Primary Contact for Project: Chris Murray, PWS
Phone Number: (919) 220-4633
Is this an after-the-fact application:_Yes X No
River Basin: Tar-Pamlico River
Stream Classification: C NSW with DWQ Index Number of 28-6
Regulatory Authorization Options for this Activity
Federal: None
State: Riparian Buffer Authorization
Local: None
Project Description: See attached spread sheet for project-specific information.
Permanent Impacts: See attached permit drawings and summary sheets. Note only
riparian buffer impacts.
Stormwater Inform ion: See attached stormwater management plan.
Signature:
Print Name: ChristopherA. Murrav, P
Title: Division 5 Environmental Supervisor
Transpohatc i Pr r:_ r:� C. .
1650'92i1 Servl�e Center, Rale �'�, Nort;. Caro��: :27E99-1550
Locati�n: 2321 Cr�'^'ree B!ud., Rale:�h, Noih Camlin-:2-.'c)4
Phor,e: Q15-733- i?26 t FAX: 919-733-fi893
Ir t. � ;C h"p�.((h2o.eresta?e.ne.�,; c�v.eNendsi
,� .li...x.ity'�AR:rati��ACr_.E� 'cy�r
I�ToithCarolina
�/���llllr�l�rf,