Loading...
HomeMy WebLinkAbout20151167 Ver 1_Application_20151106iransportatian November 6, 2015 U. S. Army Corps of Engineers Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 ATTN: Ms. Crystal Amschler NCDOT Coordinator PRT McCRC7RY Covernor N[CHQ�.AS J. TEI'JNYSQN Secretary Subject: Application for Section 404 Nationwide Permits 13 and Section 401 Water Quality Certification for the proposed replacement of Bridges No. 14 and 19 over Rocky River and Access Road on US 29 in Cabarrus County; Federal Aid Project No. BRSTP-0029(42); WBS 42265.1.1; Debit 240.00, Division 10; TIP No. B-5123. Dear Ms. Amschler: The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No.14 and Bridge No. 19 over Rocky River with two 220-foot long bridges on same locations, and they both will span Rocky River. An on-site detour structure will be constructed immediately upstream of the existing bridges. The project will utilize the temporary bridges to maintain traffic while the new bridges are under construction. There will be a total of 127 linear feet (1 fl of permanent stream impacts from the placement of streambank stabilization, along with 50 If of temporary impacts associated with the streambank stabilization. Please see enclosed copies of the Pre-Construction Notification (PCN), USFWS Concurrence Letter, stormwater management plan, permit drawings and design plans for the above-referenced project. The Categorical Exclusion (CE) was completed in July 2014 and distributed shortly thereafter. Additional copies are available upon request. This project calls for a letting date of April 19, 2016 and a review date of March 1, 2016; however, the let date may advance as additional funding becomes available. �Nothing �Cornpares�,� State of North Carolina I Department of Transportation � PDEA-Natural Environment Section 1020 Birch Ridge Drive, 27610 I 1598 Mail Service Center � Raleigh, North Carolina 27699-1598 919-707-6000 T 919-212-5785 F A copy of this permit application and its distribution list will be posted on the NCDOT Website at: http://connect.ncdot.gov/resources/Environmental. If you have any questions or need additional information, please call Bill Barrett at (919) 707-6103. Sincerely, .�p� Richard W. Hancock, P.E., Manager Project Development and Environmental Analysis Unit cc: NCDOT Permit Application Standard Distribution List Page 2 of 2 �oF,��,rFRQ Office Use Only: � � o c Corps action ID no. � y i ,, , � � � DWQ project no. ° �` Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: � Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: � Yes ❑ No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes � No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No 2. Project Information 2a. Name of project: Replacement of Bridges #14 and #19 over Rocky River and Access Road on US 29. 2b. County: Cabarrus 2c. Nearest municipality / town: Concord 2d. Subdivision name: not applicable 2e. NCDOT only, T.I.P. or state g_5123 project no: 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if not applicable applicable): 3d. Street address: 1598 Mail Service Center 3e. City, state, zip: Raleigh, NC 27699-1598 3f. Telephone no.: (919) 707-6103 3g. Fax no.: (919) 212-5785 3h. Email address: wabarrett@ncdot.gov 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: not applicable 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): not applicable 1 b. Site coordinates (in decimal degrees): Latitude: 35.359409 Longitude: - 80.675289 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 6.7 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Rocky River proposed project: 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Yadkin-Pee Dee 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Development in the area is industrial, commercial, and low-density residential in nature. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 240 LF 3d. Explain the purpose of the proposed project: To replace two structurally deficient and functionally obsolete bridges. 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves replacing a 209-foot bridge (Bridge #14) with a 220-foot, 2-span bridge; and replacing a 210-foot bridge (Bridge #19) with a 220-foot, 2-span bridge, both on the existing alignment with an on-site detour located immediately upstream of the existing structures. Standard road building equipment, such as trucks, dozers, and cranes will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained fo� this property / � Yes � No ❑ Unknown project (including all prior phases) in the past. Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � No 6b. If yes, explain. C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands � Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact number — Type of impact Type of wetland Forested Type of jurisdiction Area of impact Permanent (P) or (if known) (acres) Temporar T Site 1❑ P❑ T Choose One ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 0 Permanent 0 Temporary 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of Average Impact length number - (PER) or jurisdiction stream (linear feet) Permanent (P) or intermitte (Corps - width Temporary (T) nt (INT)? 404, 10 (feet) DWQ — non-404, other) Site 1� P❑ T bank Rocky River � PER � Corps 40 127 stabilization ❑ INT ❑ DWQ Site 1❑ P� T bank Rocky River � PER � Corps 40 50 stabilization ❑ INT ❑ DWQ (<0.01 ac.) Site 3❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 4❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 5❑ P 0 T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 6❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 127 Perm 3h. Total stream and tributary impacts 50 Temp (<0.01 ac.) 3i. Comments: There are five (5) areas of streambank stabilization. Impacts are broken down on Permit Sheet 11 of 11. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number — waterbody Type of impact Waterbody Area of impact (acres) Permanent (P) or (if applicable) type Tempora T 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4f. Total open water impacts X Permanent X Temporary 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Flo Flooded Filled Excavated ode Filled Excavated Flooded d P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require miti ation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Tem ora T re uired? B1 ❑P❑T ❑Yes ❑ No B2 ❑P❑T ❑Yes ❑ No B3 ❑P❑T ❑Yes ❑ No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Stormwater runoff from west of the bridge will be captured in inlets upstream of the bridge and discharged to a tail ditch in the southwest quadrant and to a preformed scour hole in the northwest quadrant before reaching Rocky River. Runoff from the bridge deck drains to the east approach where it will be captured by inlets and conveyed, along with runoff from the roadway east of the bridge, to a preformed scour hole at the southeast quadrant and a rail ditch in the northeast quadrant before reaching the Rocky River. Impacts have been minimized by using riprap pads, rail ditches, and preformed scour holes at pipe outlets, and riprpap bank stabilization where ditches tie into Rocky River. The proposed bridges are 11 and 10 feet longer than the existing bridges; the proposed bridges will be at approximately the same grade as the existing structure; 3:1 fill slopes where practicable. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Impacts have been minimized by using riprap pads, rail ditches, and preformed scour holes at pipe outlets, and riprpap bank stabilization where ditches tie into Rocky River. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State ❑ Yes � No If no, explain: NCDOT does not propose mitigation for the 127 If of bank stabilization impacts, as the impacts do not 2a. Does the project require Compensatory Mitigation for require fill in the stream bed and therefore, under Section impacts to Waters of the U.S. or Waters of the State? 404 of the Clean Water Act, does not constitute Loss of Waters of the U.S. and is not subject to compensatory mitigation. Furthermore, the proposed bank stabilization is necessary to prevent erosion and sedimentatin by preventing bank de-stabilization and thereby minimizing impacts to the environment. 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? ❑ Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: not applicable 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑ No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes � No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If not, explain why. ❑ Yes ❑ No Comments: If required from 1 a, see attached buffer permit drawings. 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? N/A 2b. Does this project require a Stormwater Management Plan? � Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: See attached permit drawings. ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program � DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? not applicable ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Pro ram Review ❑ Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ❑ HQW (check all that apply): ❑ ORW ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No n/a 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No n/a 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No n/a F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State � Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) � Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 26 .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes additional development, which could impact nearby downstream water quality? � No 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable 10 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or � Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act � Yes ❑ No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. � Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NHP USFWS, and NCDOT field surveys. see attached USFWS Concurrence Letter (dated October 27, 2015) for NLEB. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation � Yes � No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA Documentation 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA Maps � Richard W. Hancock, P.E. � �_ d 6-zd lS Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is rovided. 11 United States Department of the Interior FISH AND WILDLIFE SERVICE Asheville Field Office 160 Zillicoa Street Asl�eville, North Garolina 28801 October 27, 2015 Mr. Richard W. Hancock North Carolina Department of Transportation Project Development and Environmental Analysis Unit 1598 Mail Service Center Raleigh, NC 27699-1598 Subject: Endangered Species Concurrence for the Proposed Replacement of Bridge Nos. 14 and 19 over the Rocky River and Access Road in Cabarrus County, North Carolina. TIP B-5123, WBS No. 42265.1.1. Dear Richard: We have reviewed your concurrence request and supporting documentation regarding impacts to the federally listed threatened northern long-eared bat (NLEB) (Myotis septentrionalis) for the subject project. We provide the following comments in accordance with the provisions of section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531-1543) (Act). The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge Nos 14 and 19 over the Rocky River on US 29 in Cabarrus County. According to the information provided, a search for mines and caves was conducted in the project footprint and within a quarter mile of the project and none were found. The existing bridges were checked for bat use and none was observed. Potential summer roosting habitat clearing is estimated at 0.2 acres. Based on the absence of wintering habitat, no evidence of bat use on the existing structure, and NCDOT's commitment to restrict tree cutting to the time from August 15 to April 15 (of any year) we agree that implementation of this project is "not likely to adversely affect" NLEB in the project area. In view of this, we believe the requirements under Section 7(c) of the Act are fulfilled. However, obligations under Section 7 of the Act must be reconsidered if: (1) new information reveals impacts of this identified action that may affect listed species or critical habitat in a manner not previously considered, (2) this action is subsequently modified in a manner that was not considered in this review, or (3) a new species is listed or critical habitat is determined that may be affected by the identified action. If you have questions about these comments, please contact Ms. Marella Buncick of our staff at 828/258-3939, Ext. 237. In any future correspondence concerning this project, please reference our Log No. 4-2-15-549. Sincerely, - - original signed - - Janet Mizzi Field Supervisor Hi�h�ti�dy North Carolina Department of Transportation R4�'� St(�YYTIyVcif�Y ,,.,,�.«,,, Highway Stormwater Program STORMWATER MANAGEMENT PLAN �--- (Version 2.02; Released April 2015) FOR NCDOT PROJECTS WBS Element: 42265.1.1 TIP No.: B-5123 County(ies): Cabarrus Page 1 of 2 General Project Information WBS Element: 42265.1.1 TIP Number: B-5123 Project Type: Bridge Replacement Date: 6/16/2015 NCDOT Contact: Andrew T. Nottingham, PE Contractor / Designer: Parsons Brinckerhoff Address: Hydraulics Unit Address: 121 West Trade Street, Suite 1950 1590 Mail Service Center Charlotte, NC 28202 Raleigh, NC 27699-1590 Phone: 919-707-6700 Phone: 704-342-5403 Email: anottinqham(c�ncdot.qov Email: dauber@pbworld.com City/Town: Concord County(ies): Cabarrus River Basin(s): Yadkin-Pee Dee CAMA County? No Wetlands within Project Limits? No Project Description Project Len th (lin. miles or feet : 0.32 miles Surrounding Land Use: Industrial, Commercial and Motor Sports. Proposed Project Existing Site Project Built-Upon Area ac. 6.7 ac. 3.6 ac. Typical Cross Section Description: NB and SB - 3-12' lanes w/ 10' paved sidewalk SB - 3-12' lanes w/ 6' paved shoulder NB - 2-12' lanes with 6' shoulder Annual Avg Daily Traffic (veh/hr/day): Design/Future: 32,300 (53,300) Year: 2016/2036 Existing: 26,900 Year: 2010 General Project Narrative: The project B-5123 consists of constructing 2 new bridges, 220' long, to replace the existing bridges #14 and #19 in Cabarrus County on US 29 over Rocky River. An on-site (Description of Minimization of Water detour structure will be constructed immediately upstream of the existing bridges. Stormwater runoff from west of the bridge will be captured in inlets upstream of the bridge and Quality Impacts) discharged to a tail ditch in the southwest quadrant and a preformed scour hole in the northwest quadrant before reaching the stream. Runoff from the bridge deck drains to the east approach where it will be captured by inlets and conveyed along with runoff from the roadway east of the bridge to a preformed scour hole at the southeast quadrant and a tail ditch in the northeast quadrant before reaching the stream. The project creates a surface water impact by adding bank stabilization to Rocky River. Impacts have been minimized by using riprap pads, tail ditches, and preformed scour holes at pipe outlets and riprap bank stabilization where ditches tie into Rocky River. No impacts are anticipated due to the onsite detour structure. Waterbody Information Surface Water Body (1): Rocky River NCDWR Stream Index No.: 13-17b1 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: biological impairment Aquatic T&E Species? No Comments: NRTR Stream ID: RR Buffer Rules in Effect: N/A Pro'ect Includes Bridge Spannin Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) HigYlway North Carolina Department of Transportation /�\ Storrnwarer ' „�,,_, Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.02; Released April 2015) FOR NCDOT PROJECTS WBS Element: TIP No.: B-5123 County ies : Cabarrus Pa e 2 of 2 Preformed Scour Holes and Energy Dissipators Station & Coordinates Drainage Pipe/Structure BMP Sheet (Road and Non Road Surface Energy Dissipator Area Conveyance Dimensions Q10 V10 Associated w/ No. Projects) Water Body Type Riprap Type (ac) Structure (in) (cfs) (fps) Buffer Rules? 4 -L- 18+00 Lt. (1)Rocky pSH Class'B' 0.6 Pipe 15 3.3 1.3 N/A River 4 -L- 22+g4 Rt. (1)Rocky pSH Class'B' 1.1 Pipe 15 5.6 1.6 N/A River 4 -SRVD- 12+43 Lt. (1)Rocky Riprap Apron / Pad Class'B' 1.5 Pipe 24 6.3 1.6 N/A River 4 -L- 21+67 Rt. (1)Rocky Riprap Apron / Pad Class'B' 1.5 Ditch 18 5.3 1.5 N/A River 4 -L- 21+69 Rt (1)Rocky Riprap Apron / Pad Class'B' 0.4 Pipe 15 2.2 1.0 N/A River 4 -L- 21+7g Lt. (1)Rocky Riprap Apron / Pad Class'B' 1.0 Ditch 15 5.3 1.5 N/A River Additional Comments * Refer to the NCDOT Best Management Practices Toolbox (2014), NCDOT Standards, the Federal Highway Administration (FHWA) Hydraulic Engineering Circular No. 14 (HEC-14), Third Edition, Hydraulic Design of Energy Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria. � ?f? � � r � � � � � � � � z �� �° �f ��f ��f ��f wH3L ��_ � �. �� ��� ��� ��,� ��- ffr fA f &163 f H} £fT f e}ffrf l } ( � � 3 � N � � � ., � V � � � � � � � � � V � � 0 V �� O ZQ � TO CHARLOTTE USE CLEARING METHOD N0. ����� �� ����� �������� �������� �� ������� � CABARR US CO U1�lTY LOCATI011L• BRIDGES #14 A1VD #19 0111 US 29 OVER ROCKY RIVER A11tD ACCESS RD. TYPE OF WORK: GRADING, DRAI11lAGE, PAVING, f� STRUCTURES SURFACE WATER IMPACTS PERMIT � ��.....� ..........��.... S H E ET 1 O F 11 INCOMPLETE PII.ANS DO NOT l'SE FOR R6W ACU[11,SITION PRELIMINARY FLANS DO NOT USE FOR CONSTRUCTION GRAPHIC SCALES DESIGN DATA PRO ECT LENGTH Prepored !n the Office of: H1'DRAULICS ENGLNEER DIVISIOIV OF HIGHWAYS s,o z5 o so ioo � DIVISI0IV OF HIGHWAYS STATE OF NORTH CAROLINA � ADT 2016 = 32,300 LENGTH OF ROADWAY TIP PROJECT B-5123 = 0.27 MILES � PLANS ADT 2036 = 50�.�0� ]000 Birch Ridge Dr., Raleigh NC, 27670 4`�p MOpyyC4 ze o ze so DHV = 11 % LENGTH OF STRUCTURE TIP PROJECT B-5123 = 0.05 MILES zoiz srAxnAnn srsciFrcArroxs °� '�s �.[I�I . � = 65 % r�. � . SlGNATURE: � o a�owuPS T= 5 %* TOTAL LENGTH OF TIP PROJECT B-5123 = 0.32 MILES RIGHT OF WAY DATE: G.E. BREW, PE } 50 25 0 50 l0o V= 5O MPH APRIL 17, 2015 PRO�scr sxcr�ssn ROADWAY DESIGN �'ia�,P o@ae * TTST = 2% DUAL 3% ENGINEER oF yw��sQ PROFILE (HORIZONTAL) 20 io s o io FUNC CLASS = MAJOR LETTING DATE: W. T. BEST ARTERIAL APRIL 19, 2016 vXO�scz ossicx s,vc,,vsEx PROFILE (VERTICAL) A.E. P.E. S7GNATURE: STATE HIGHWAY DESIGN ENGlNEER o � PROJECT REFERENCE NO. SHEET NO. � �`� B-5/23 4 � � � ROADWAY �IGN EET NO. HYORAULICS � DENOTES IMPACTS IN ,*� ENGINEER ENGINEER SURFACE WATER ���� �� �a�� PERMIT DRAWING �� SHEET 2 OF 11 E�P � � � INC�MPL]ETE PLANS DENOTES TEMPORARY cRnPHic scn�E ti oo NoT ��gF Foa arw A�QU„�T�oN IMPACTS IN SURFACE WATER '�� IDREH.IMINARY PLANS DO NOT USE POA CONSTRUCTfON HEATHER MORRIS JONES ' ,� � DONALD ALLEN JONES O � \ \E\ \ DB SBO7 PG 0315 � O / PB 046 PG 012 � �`` ! �' � � � � � I V _� �� SEE SHEET 4A \�E !f' 2� � " --..._ _ E\\ JS` � ^-� �t'( _ ` � "�\ ��g\ N \a, � BANK OF NORTH CAROLINA \� N DB 9450 PG 252 � ` `\\\E � \ `.\ \ls `\ \\Jy� \ \ ^'$ \ � * \ INSTALL OTCB, TEMPORARY PIPE AND DI BEF� O�UR �\ � � \ "�_ � e � � r _ �;ry.� �, � �,,. BRIDGE CONSTRUCTION. INSTALL STEEL PLATE IN PLACE a� I�RAP 4T EMBANKMEN ��� �"°�� �� k�'�� � ` OTCB TOP. AFTER DETOUR BRIDGE AND EMBANKMENT IS �S � SEE� �' IL C $ ' � �' \ 13 ti�.:; G ��£,'i __ '^�.� —_ _ ` REMOVED REPLACE STEEL PL4TE WITH CONCRETE OTCB TOP � ° ST.6 TC:? B \ Cc5 �290 PG S_ � '\5 � �� IN L C14;s A IPES BEFORE DETOUR BRIDGE AND REMOVE TEMPORARY PIPE AND DI. . 2 SYGF �. Tqll ITCH "u 0.3°6 CONSTRUCTI N. IN L ST� L IN PL4CE OF CB FRAME, \ �S TS \ 5 DETAIL \ GRATE, & H�B� AF DtNJUKVS OVED REPLACE STEEL � �S \ � TES�WITPI. F GRATE,& HOOD � �� � � �S � RIP�4P EMBAN'KMENT ` \ \ . —_- _. -- �' \\ 6ETON5 Q B\ .., \ \ . � ���_ —__---_ ___� _____ 6'CIIRe � /+ , E __ DI"T�4B � �-. �_ 0 � �= _ \ \. � EST. 7 SYGF �-- � \ \ \ �� BST _ � \ P 'x-. .i �� � S� ~\\ CONCRETE PAVED �P \ @,57 SPECIAL CUT DITCH SPE IAL c.Vt ID TCH J \ 6ANK OF NORTH LE7� \ � �- -.---� ---.-_ cF DEfAIL F ( EMPI a \ ECIA%CUT DITC F DB 9450 P 25 � \ `,�� �--- �— �__ EE DETAIL F L \ �ST 2 TONS � � a// /� PSH \ ., SE ETAI� EST 7 SY GF � � �. � �� c�i � SEE DETAIL A - , T- 1,CY CO�C � � w�� � Q10=3.3 CFS�� TEMP . � � � ' \ V A \� � 6�a�" .-�OTGB . ..... ✓S \ ',.., . ' F��eF \ \\�l� l �j/ � \ Y+,�y S `r i�� ��' \ � ` \\ � I — ��. _— _' '\ \� 92 \ � I � J 15 RG�IVJ � Y, __ '"� E%ISTING R/w _ p01 � � � � ` �� � TS � �u 20A 8H� � —__"— _ — ____. � ., � �a e � � � �-ti� �- — A DI.v,- �ISRCP � �� y\ n � \ .. °S � P� J � F'P �- ��/' S6G APP -' ' "__ - _ <ze � '.-i -- � —' � _ _ � � _ � „ v �':'.�'. ' �.,, .� E%ISTII — _--' - I— __—'--- _ / . . � ' � \ \ - � - � � � i ". 3. �g 15" RCP-IV � Zg 13'=&C� - -'�. � ` ,'�.. , TS � CB - _� 12' CMP - -� _CB �n i � -._ . . . _ 15 '15y' R � 8 15" RCP I � ' - _ -.. � ...--.� e..= .,__- .- � . _ — �' '-_ -- 4E i5T J US 79 SHL - F .. ... � � � �J' W a I� Iv � �� - --_� � �.,. .`� . __— -- --�� -- ' » , � , IS' RCP � ,� , _. -._�� ,. . .�� � -- `— ,� 'a� � SOIL u� - _ � �;:: . . - — _ — - _� __ _ ..._� � - " N . ..-- . --, - . . _ . � -- -- � � 8 �� .�� l _ _ „ EXTEND ISLAND TO MATCH � _ . . . �i57 - \ :•` — CB � W II_ " °' .{ � + • \ 7 i - W > 29 NBL t_I'S5r ��� CR056 SEGTIONS & � j � GI 8 0.2 .��1 , j - n N 15' RCP IV �ca-� ELIMINATE NEED FOR � B - ._�.. '-.,�_ y � �, �' � - - - - - .. . - ' -"— - -- ,I� ADDITIONAL MEDIAN DRAINAGE �-_-- G - ' � � T - _ — _. — _ _ _ --- _ __ v �.. __. ..�� '_'_'-. . . -- ._ _._ __ -' _-- -- _ ' - ' " TS � — _ , • .� -- ��� � , e o �- �- �� —�� _ _ _ , -- - � --- ,� � ��; __--- � , — -. � --- -- � � � — _ oi - --- -- � a � �. � . . . .-BM°� � ' y � _' - � _ � � ..�. _ -- 1�.� — � � , — _ _ � — \ � � ,� . _r _-- ^ 4 ��: _ .. ' „V;�,_�� . . . . . + ._y,____—X� �ETAN T�— \"\ � �---, o�--�----- --- —��� —�� � / ���j� I Ts ��v � vm� 2�i�a �! � s— � � � ���� � � - � - � r � � '' � � � �� � ���f/` / / � Jrirr � ° � � '= � sPean� cur � \ rt�� � BACK OF CURB DITCH N \�\ � / / TS Y S8G APPROACH SEE DETAIL E I / / /^� //�� _ _' / i CHARLOTTE MOTOR SPEEDWAY LLC \ � � j � °TCB To srn.zs+za`, : -' Q . . �/ c� �6 v � ,_!iv '6?o-�i�S�JN TRUS `Fr". � � � / -� A UT TS � Q8 I i132 PC �G24 V% DB 5452 PG 0360 \ _ / � / 0h , _ � � DB 5290 PG 333 "� �� � N � � � � ' � 3 oHS \ ... .P L CUT DJS�H LAT RAL R P R � i � � EE DETAIL DAP � ) 1 �/ / / / / SEE 6ETAIL F ES 0 SYGF PSH ._! �i _ -�� ,,, AIN / CH 03% SEE DETA�LA _ I \ AIL T C4� . a / \ \ \ � // / j / // / ��,� � SEE DETAIL B Q10=5.6 CFS / r- � "- - -- \� _� /\� 1 CL II RIP RAP ( r W \�v / / / � � � / GTD BANK STABILIZATION � ' Z RIPRAP AT EMBANKMENT � i � � � -i- � � SEE DETAIL C � J �- . .; �� � �. . � �'�� EST. 6 �ONS YGF � -___ I / / / _ 1 �� '�� �.� � , ; , , � �� .�, � _ n � � � -. \'� � � / / / / / RIPRAP AT EMBANKMENT / � � U r SEE DETAIL C � E"' ` SKETCH SHOWING BRIDGE IN RELATION TO PAVEMENT END DETOUR BRIDGE � � / i/ 5% EsT a ToNS a a i�� /� ` Q APPROACH SLAB � �y ' -DET2- Sto.17+23 +\- / esr. n sv�F I I �' �. ' BEGIN DETOUR BRIDGE � � � / c�JCRETE PAVED / � � 5 CIAL CUT DITCH / � / � � � / � � SEE DETAIL H f -DET2- Sfo.14+34 +\- � � • / ,, nP iii NPE III � �a / i ; � �""� 350 '� �I SEE SHEET 4B i'���� � = o ; _ . .....r r r TYPF II� r r rTYPE III � �� � RE�ild�474 TYPE 350 � o� � �r o� �: 9� l0' MULTIUSE PATH TYPE III BEGIN BRIDG -i - ct„ �n+. 2'6" C&G `� N o wv=5�s.ar N A77ENUATOR �T�_ l'6" C&G `� � �-�► 2'6" C&G N � TVPE III END BRIDGE _I - C+n �J91GA 1\- I � � i 1 � i' // / ,, � 0 � m � �DENOTES IMPACTS IN SURFACE WATER ioo� o- ioo� �DENOTES TEMPORARY GRAPHIC SCALE IMPACTS IN SURFACE WATER \ �,,, "� PROJECT REFERENCE NO. SHEET NO. �`� B-5/23 4 � \�� RM/ SHEET NO. � ROADWAY DESIGN HYORAULICS PE RM I T D RAW I N G '�� ENGINEER ENGINEER SHEET 3 OF 11 E�P �� l INC�MPL]ETE PLANS � DO NOT I�9F. FOR R! W ACQUIRITION '\� IDREH.IMINARY PLANS DO NOT USE POA CONSTRUCTfON HEATHER MORRIS JONES ' ,� � DONALD ALLEN JONES O � DB SBO7 PG 0315 � O � / PB 046 PG 012 � �`` .� � ��� V � �� / �,_� �� SEE SHEET 4A ��E �\ !f' 2� --" _-�_.�_ eE\ `lS � t,( � �\� ��""' � � � ��g N \a, � BANK OF NORTH CAROLINA � N �°'^�� �E \ DB 9450 PG 252 �,5���\�,S , s � 1 _ �, �� � �^ '. . .� INSTALL OTCB, TEMPORARY PIPE AND DI BEFOR OUR �`�.`, I , , � �� ' � _� � \'� . BRI�GE CONSTRUCTION. �INSTALL STEEL PLATE IN PLAC�?F� - - �-�� P.IeRAP 4T EMBANKMEN \ / ��...'� � � �CHflRE TE' MOTOR SPEEDWAY L�.'��- \,,,���� � pTCB ?OP AFTER.DETOUR BRIDGE AND EMBANKMENT IS �S ��" ��� SEE DETAIL C 4° f �� h ��. �� , �\, --- PG O36Q. � ��\����� :\�,. .REMOVED�� REPL4CE STEEL PLATE WITH CONCRETE OTCB TOP ��. ST.6 TOIVS., L B ' � -- DE 529 G JJJ ., \�� � � . TS F. IN L Cb:s A �I`PES BEFORE DETOUR BRIDGE '-� \� \\\` \�) � � . AND REMpVE iEMPORARY PIPE AND DI. \ . 2 SYGF � ...... ... _. \ ..��\�\\ � \� \ \ �� �� I . ' TAI . � �����' ��rSH �-,TAL3\ ONSTRUC I STf� L N PLACE pF CB FRAME, . __ .._ - � � � .. I \ \ �`� � - S T$ \ DE I G2A , . 93'� RV / .- -__ ... . . � Il � ' � DE7D5\WITPi.'F OVE GRATEA&EHOOD� _ �� _\ � _ � —\ � } S ls\ c r N i �.,, TE & H AP , � ^ - ' � � 1 1 �, J,� _ � ` � - + � . RIPR P EMBANK �ENT\ \ \ � . _= // �. . . .� �,,. �\� � � 4 l � � 6EE DETAe C . � � ; \ \ ; . --=� � ��- . ..' -_ . � � 6' GJRO � " _ . J _ � � ��� �V `,. � � � —:�T�� � � �-� • ,. � � /+ �- � .� E . 6 TONS Q e � �.� � � � � � � i l l ' �' 1 � � ��� __— erna F l � 1 � �� aaTcul�oilc � �� � � �J_ c" �. ' �i I I I I ` 11\ �1 ,//\ \\\\� � . 5= SPECIAL.CUT DITCH DI TEMP a SEE DEI'All F COI, EREAi� VED e p FI N� PP 25�ST 2 TONSP \\� �; � �. l. \ \ .. . o a� c� ixri � 6ANK �. � ��i I � �r �? ��� RTH ��a w7 pa� � � � � �--� . I I 1 1 �/�/\ ` � � /�' Q10-3�.3 C S SE EST 7 SY GF � � \ � I ' I ��\ I I I `,� u \ � 6 S �, \' �\ � ,. �\ � SEE DETAIL A \ ' TF�yP ,,-OTCB � �� \ ��ST 1 .CY CC7�NC_ . ,\ � � � 1 / i � V'.� y�� 1 �/' '� � ' � F� e� � ' �.y1 �', n�L ` � � � . \ s � J 1 , � � szp� '`' `- � � ���. � , � � ��� �� \ �� , , � � � � � �- _ � � � ��� � � �,�� � — � ��,�\T`s' s � � � � '� o�-, �� � � � — - �� � / � � ����,�� �� � ��i \ �� — -. - 9Z \ . -F,j'I� r� � �� 15 RCI�IVJ � � � � � �- � - ' F9 � � � i�i'/'-,1 56G APPROACN \ ` �};,� . .. E ' _ T-�o� �+_ -- ---�i� =:�� . . — �� -- �- — n _ ,� e ' 1J�� �'j �. x�srwc aiw i oi��� ' rs �� � �. — � ` ' �� � '�eF _ �_ � � � -rn�� ,.rr -J. _ T -- / ___� :. y,��l.— . . .. ' — __ . ._'1' �---. __ , � I•u.a, - _�-.:._. _ I . , , ,, ; ' _ _ . 1 __ _ ' ;>: �B 15" RCP-IV �- �p13:' &CP1 .. --°- � TS � .�1. . _.. . . ., _' � \y �. .•1 _ � Y �+ � b ' ` l. R � � i� Iv i. ---- — . _ — � _ ___�_-- -- -. ..__--'- _-_'-_—__—.. . ._ . _ . . . . � _ _ . .. — - � � IS' RGP r � - I � ��� �T "`. , i-r � � - � �- - -� . — -z - - .__ _�� _:. - _._ � �_� ..— r� . � � . �.,. _r — —_ .— � —_ . _ ... . - . � r � T -_ —' � EXTEND ISLP,ND TO MATCH ' '" �S P 1, �- � _ • - 29 NBLII '� CRO55 SECTIONS & f ° ( I GI+S1024 � \ i� o ELIMINATENEED FOR , �B � - ,,� ..�i� : '� . ADDITIONAL MEDIAN �RAINAGE � - ---.- — -_ - - f� ` — - . -_-_. � .. _ . _ .__ _ _ . . . \ ��j ,/ -_ __— - � TS � T —� --- � �s , _ -, -- -- J _ � -� ---- ''�' — —_— —+—�� � � i f�— ':� � � X- \ _ ��, _ I�- N = - _ - - �; � � �ETA N �'�\ \J � � I � � . ' .. . �_ � —/_\._._. —_— _ .—� ... . � � � . TS i — __ _ v � � ;� ��,� � � �� � �� I � � � � �� �� � � +, _ � , I � I � rs � - �` � \ � � � . � � oTC6� / / A 1.: ; --- \ MARG07Y£���10TOR SP�EDWAY�LLC� �-,. �\ I�+ �� � y/� Ts / / y� a rb P 1 I z3�\ � ..... ��t D$� 5952�PG 03 0 i_ / I/ /; /� y` A Ui � �, ..\ .�. ,y / .% � 0 � � � �, � OB. �0 PG� 3�3 � / I ..,���,\ �\� � ; � �;� �' J i� �� '� T 3 OIyB' ^. . � ��. . \� ,p� / ' � i SP.�'CIAL CUT DJ?CfH ES 0 SYGF �- � � \ . , � � 1 �/ // // I �/ � � SEE QETAIL F /� � J � � \ .�\ � \- � / � / j . / AM / �� , j 'fAIL TCH C� 0�3% � SEE DETAIL B � � � � �� � �� \ / , � � � ,. \ \ � / // /+ / � // % / � j �� � � RIPRAP AT EMBANKMENT , � .. "-- � � � E5T 6ETONS C'L B �-----'- � / � � � / � Q/ E5T 7 SYGF �; % : - - , --" �� ' � � ` ,�� � i � � � ' _ - � � r / � / . / / � / � RIPRAP AT EM9ANKMENT � SKETCH SHOWING BRIDGE� �IN RELATION T�0 PAVEMENT END DETOUR BRIDGE � � �/ � s'' ���'' r �� � esT_a roNS ci s� ' APPROACH SLAB I � / �, / �I -DET2- Sto.17+23 +\- r � //' � esr. n sv�F /� � C CRETE FAVED BEGIN DETOUR BRIDGE � � SBfGIAL CUT DITCH -DET2- Sto.14+34 +\- � i SEE dETAIL H � i' � ' rrPe w 'a / _ TYP III r.ceii aFn � /� , � �� � RE�ild�474 TYPE 350 �i l0' MULTIUSE PATH TYPE III TYPE III 2'6" C&G `� N o wv=5�s.ar N A77ENUATOR �T�_ l'6" C&G `� � �-�► 2'6" C&G N � TVPE III END BRIDGE _I - C+n �J91GA 1\- I I^ � � i 1 � % /� / � O �.TA.221=80 \ �� �� C �, �'`, ` � �� "" - � � �isin CB ��� �- C9i 12' CMP "�-r' R - • 8 15" RCP-IV �B � �r_:' . _ ._` .__-.._. - - �,.- W -..__ .... � . _ - ,,.. ..:- N ,....••.�. � --- --- :. �- - � - — „ CB �, W � u � W is acr-iv A N � n � . _ _. _ _ ... �. _ ._ _ - _ � 4 „ . -y.. .__CB �d ' CB CP. i ��� � OO � o ���'����� �.. _=�- --��- - � � =- � Ij��al�i� 1. 7,�'4' 0�2GI (e � .. - � �:.,. _ + � �' _� ,nr< �\ \sPecin� cur `� �'�i�i�i W �� � � BACK OF CURB DITCH �: S6G APPi{OACFY � SEE DETAIL E � � ��,; - � Q � FO STA.29+24\ \ J � ; � LW6 -"� �,SON iRUSTEE ' 4B ; U32 PG �24 � � LATERAL.'V' ITCH � � `� -- - PSH � '�'/CL B RIP �tdP: � )/ � -- �j SEE DETAIL A SEE DETAIL D . /� -___ � Q10=5.6 CFS �i / �- " � CL II RIP 2AP `\\ � � � /� W BANK STABIIIZATIOW� \ � �� / - � . � - Z , � ;��}���1'�r�, _, /\�� _ _ ,1 'l��j����� ��,� � r �' ,� / � u � �_/ �� l� i�'ln%ol/� / `., .� Q i -_ � /����� � //� `�, � �� � /� / f% �;,\� .,, i SEE SHEET 4B � t` �� �� i �' �� � �� --'__-""_ __-\ _ � �-___ � PE RMIT D RAWI N G -����� Js� SHEET 5 OF 11 � ^ ���� � � � � � � � ��� , ��.... E� � `� � � � ���� �` ' `� /,�. DENOTES IMPACTS IN a - ���`� . ' � � ---�� \\�S , \ SURFACE WATER 2 �l INSTALL OTCB, TE/v�RORARY PIPE AND DI BEFORE �� �OUR BRFDG� CONSTRUCTION. TN�TALL STEEL PLATE IN PLAC`E DF� �'�-_ � -�-. _ DENOTES TEMPORARY OTCB TOP. AFTER DETOUR BRIDGE AND EMBANKMENT IS �5�� ` _4 IMPACTS IN SURFACE WATER --�MOVED�REPLACE STEEt PLATE W11'H, CONCRETE OTCB TOP _ ` -� �� AND REMQVE TEIv1PORARY PIPE AND DI. � TS `� so� o� so� , � _ �� � � \ �� - ` � � � _ , v � . _ , � _ JS 1 `' � , ; - �� �� � . , , � � ��� ;�\ -, � �� � � � � � �� � �� � � � � � � -� � ��� _� _ -� GRAPHIC SCALE � > � A c, ✓ VA, � �\ � �� � � � - � � 1�� � - ' �" � J i i � I I; ���; i�- � �- -- ��� �� �� � � � �� , � u� � � �-- - �� �- � , �_ �� � � � � E{iR.�� __ ' „U� �� � �- � � � � � � �- � - � - - - -- 6� � . �� ` � � � �, � � � �� � � ,� � � _ � — C , � � . �� �. � ...� � �. -- . � � , �� �� ` � � � R . _.- - - O �� � �ST� i � 1 � � � � � � � � �, � � I� � � I I � 1 � ��� �, ��,� ��� \ ,� �S�- SPECIAL CUT DITCH DI TEMP 133�BS`T � � I I p \ � ' -SEF DETAIL F � ) ��� ` -_�' �� I � � � � QII� � � � ��� �6 ��'� ��_ I _�� � IPSH 1 � P ii i , � �'�—�� A � �� � `, � � V �6 � s� � � � \ � \ �, sE� � Tai� a � � s-- � �' �� ���� "� � � � V � � '�� � \ a u s � �� � Q10=�3 CFS � � �TEM � l �� � 'Il �� s \ � � \ \ � \ � pl \ PROJECT REFERENCE NO. SHEET NO. B-5/23 4A RM/ SHEET NO. - � ROADWAY DESIGN HYORAULICS ���`� O ENGINEER ENGINEER N INC�MPL]ETE PLANS DO NOT I�9F. FOR R! W ACQUIRITION IDREH.IMINARY PLANS DO NOT USE POA CONSTRUCTfON RI �RAP �AT EMBANKMEo SEE DE��41L C � �EST. 2 TS ���B ,�o Y'GF �,- � TAIL I \ \ � �S RI F�AP A \JS ~\, \ �__ \ E�. \✓S \-� � � \ SPECIAL Cl7fi ITCH \ ✓ SEE DETAIL F � � � � s �� �� e \� \ Z � � �' � � � � i � � � �� � � /���� A \ ,,_OTCB � �V �S a� ° - -� � , ��0� � _ � � � � � ` -' �,� a����. �� � �� � � s� � �� � \ � �\ '+ L � _� ` \ � - , � � �� �� - � - _ �� _ --- �� �- _ e �� � � `� 1���_� �������� �� ��I��� � ��,,,,� ��j� � -- � - �' ; % �� ���� '� i � ��, � � �, �� � �\� ��� � _ - _ � � ` , I, . � � � i � '/ � i � �� �� �� � ,� �_ __ ---------- � - ��D° x � r�s� -��-- ----- J I �-= v, - -` i / _- � _, - _ ; � / �� `� �_ � i5" RcP � / �, - — - - � i �� � � � �-�7, � _ --- = _--� :/ �-, _ 1 - � - -- _ _ - � gS CB 15" RCP-IV _ _ _ _ �B �5"�CP-f 15" RCP � � -- (i;> 29 SB� !' S i o /,,!I %! ,,F, L, J _ m 0 0 CB �� _� � � —` _�. = � ,_-. � � _; = 1 _ __�- � � r_ - . _ _ .. - -! - -L CR � `\ ,\\ ��:� �� � � T C1'� -\\ �\\ ��0 - - - - - - _ - _ ` T - �.� � - �. , // , --- _ _ __ -- _ - '�� _ - - - - - . - -- - — --- � l i� __.� �__-- --- -----�---��� � � � .� � -- --- -- - - - _ — — --- -s \ . ;\.(, 1 � � i — - �-� ` � � _ _ _ — - — � � `� - -- , --___ � ° � - - _. N ��� _ ��� // J -- -�-� -- -_, �_��;��__� _ - --��� _ �'�� � _ � � , , �� �i �- �n � _ °��A I � � / / ' ' /� � '� � � � � /� - - - ---- ' i � � � _ �. , f � / � � - y�� � `-" � � _ �- � ' � �_ � � � _ � �� � � � � � "' , �/ � � � ,1 � , , , , � , � �' � ' � � ' � _ _ , � �� � \ - , �� � ' _ � � � � � �� � � � �� � �,� ��Ha��Qi��-��, Mo�roR� � sP�EOwaY ���c � �����., �� � �; �� , I � �. � � � , �' � / �i � � I I � ,� / I ', /�, � � �TCB ,�� ��,�° \ , �o����z Pc o�o � , �, ��; I �� �� / I � �/ � ��, � / � � �� � � �� - ., / i ' N 'I /, � � � � �' ��'�� � I��, �� � � RG�' 33�3 � I % � � � �� "� � � � - I � � SP � CIAL CUT DJ,T�H � � �\\ � �� � \ \ _ \ ` � �/ 1 / � -\'� �� '1� �,� / � � � � /� i � ! �/ ��`fAI SEE D-E'�AIL F �° \\ \�� �� \� �� � � �\s`��\ \1 � <,, / � I � ', \� � � � �� � �-� /� � � / � � / � / �-', / , � / - < � � ��� ` ���\ ;a� ��V�V� � /�� � --�`� / ° , - � I � �s��� �\ �� � A `� � � � ,�������A � � � / , � / � �� � � �n' �� � � � ���' i � � � �' r� � '� � �, � � � I � � � � �� �� ��� / / � � �' � � ,,� , / / �/ , `�, � � � �' � CL e�� A 'T � j� j/iAI L D i� G1D , RIPRAP AT � 0 � �, 0 0 '° ST. b TC�I�S��� B � \ PERMIT DRAWING . ? s�'�F � ' SHEET 6 OF �� � � TAIL Di?S � ETAILo6\ � ✓S � 50' 0' S0' GRAPHIC SCALE � o° � � �o 2� � \ RIP�4P AT EMBA ENT � °� d\ � SEE DETA C �' EN b TONS CL \\\ � EST. 7 SYGF ✓s� �, \ CON�CRETE PAVED :IAL C17� ITCH \ ✓ DETAIL F��� � S ECIA�UT DITCH � �, SE ETAI� _._,\_ \ ` T. 1 ,CY C�NC. \ ' � � � � \ �� \\ ✓s \ � \ S �: �� "� � A �°�'�� TS � � �,� � �� �._ � \�� \ /��-A � . — � !U � ✓ -�� - —� =� ��� �\� ��:,�a� ���� ���� ���� � _:�_� �- � __ _� N - - --._.. / i � �� �� �TCB j / / �j, � SP�:�CIAL CUT DI��H � �i SEE 9�fAIL F � �� :TAI''N � / �' � i , � � � `�� � � ���� � � � cA� � `�: �� �- � �/ � � C�IGCRETE PAVED S�ECIAL CUT DITCH SEE DETAIL H IN L C�s ANp��,FIPES BEFORE DETOUR BRIDGE CONSTRUCTI N. IN L S�L Pi.�4 IN PLACE OF CB FRAME, GRATE, & HO 9� AFT DET,pUR`.�S OVED REPLACE STEEL � � �P TE��WITPi� F GRATE, & HOOD � I � � \ \ � \ II / \ � \ � r � � � � � ` \ � � \ \ � F;3ANK Of- NO� I H A���LET�P �� \�� � % DB 9450 P 25 ST 2 TONS � � \ � � EST 7 SY GF � � � � �� �� � �FiiaF �� ��� � '�� r -� � — -- � � � � �\ - „ � `\\ TS � � t,� \ � � - :� , ��`� \ T� �' -- \\--��� � \ C \± :� \\ ;� m GIV8k�0 , ,� ` �/ , �� � �'�/% CL�1P�P � \ �,'� A UT T � 3�ONS � �'10 SYGF /�AIL DITCH @ 0.3%' '� SEE DETAIL B C,1D RIPRAP AT EMBANKMENT � SEE DETAIL C EST. 6 TONS CL B EST. 7 SYGF RIPRAP AT EMBANKMENT SEE DETAIL C EST. 8 TONS CL B EST. 11 SYGF PROJECT REFERENCE NO. SHEET NO. B-5/23 4B RM/ SHEET NO. ROADWAY DESIGN HYORAULICS ENGINEER ENGINEER INC�MPL]ETE PLANS DO NOT I�9F. FOR R! W ACQUIRITION IDREH.IMINARY PLANS DO NOT USE POA CONSTRUCTfON _ � � � � � 15 RCF�V� � � t � [ �_, � SBG APPROACH � � i� r t�l� _ C u+ � TO STA_22 + 80 � � \ C '�����L�Lr --- �Ir�ii� � --'� �—�- ��'����'i rr7rrir�,��r� �� x�� ---- �� �CB �7rivoA �5 RCP-�/ —C�ii -�2" CMP � �5�� R"� � � �` _ -���.�,�..Q2_Ql� —�- - - - � - — — ��. �� 7�a - - r--�—_, _ --- _�, _ �;, _ _ — T _ _ _- - _ -- _ � ` � 1� � � l� � � �" �� �� � 15" RCP-N \\ \ i i� ' � Ts - r���, �� CB �—]5'=1�C-P=+tf--CB����� rrz P, CB �. _ l✓ E' �ll',N �� TS + � � �_� � � r i� � L�.��- `v+ �i�- � . - -- � �� � __ �' ' - - -- � � � TS -- - � � � E� 0�2G1 (8 . � � � , � �� m t -- j �� k.; v i � :-� �j � �\ '�TS I � ��� _ � SBG APPROACFi � � TO STA.23+24� ` � `� r�a � ; , �� � , TS `,r� ,, � LATERAL 'V' DITCH � c`n PSH W/CL B RIP RAP SEE DETAIL A SEE DETAIL D �' Q10 = 5.6 CFS CL II RIP RAP � BANK STABILIZATION \ DENOTES IMPACTS IN SURFACE WATER �� _�` � , � N , DENOTES TEMPORARY ,� ,'� IMPACTS IN SURFACE WA�'�R ,' ' � i ' _ � 0 � � '° ST: b TC�►�5��� B � \ 2 S`r'GF TAIL DiTCH @ 0.3% PERMIT DRAWING � � s�� DETAIL \ ✓S � S H E ET 7 O F 11 �\ � \ RI P�P AT EMBAI�iFMENT `'�� \ �� SEE DETA�C so� o� so� � ES`T• b TONS CL �\ \ ��� � EST. 7 SYGF ✓S� ~ , \ CONCRETE PAVED �_, GRAPHIC sca�E :IAL C17� �ITCH � ✓S DETAIL F � � \ ECIA�UT DITCH � �, SE ETAI� � � _ \ �ST. 1 ,Ci� C NC. . �� \. � \� � \ \ `�'°�_ � � , � ; . � �° , � s \ � � , w � � '�'°�' TS 4✓s' v � ��. � �� �� �� _� � � ,_._..�. \�\ \ �/���' � — � U � ✓ �- ��- \ - — �� I , i _ _ _ - — — i — _ -� � . , ` � \\ _ _�_� �------ - --------- ,\\ • ��� �.��,- ���,���� �_� ��A�___ - ���_ —����� ������ —\\ ,�\\ • �'� 'I ��`�;� _ _.�.�. = -- � _ - •- - • -�-� �� `, __ � , �.�, i� /� ���� ' ;' /�� - i ,/ / ., /� �r��; — . ,> i - \ 1/ � � � � QTCB � CL ���� p ,� / � "� � � �'� � q �T� T � � �� �'� �' � SP,�:�CIAL CUT DI��H ��� ES�'IO����S�Y�F % i SEE 9�fAIL F � / :TAI;N /�� '�AIL DITCH @ 0.3% �� �� ���� SEE DETAIL B � / �� C,1D �, , ���. �� RIPRAP A�T EMBANKMENT � � %;;��'� �� l \ / SEE �DETAIL C � �� � � � � \ /EST. 6 TONS CL B � / A� ,- ,' EST. 7 SYGF � ��� RIPRAR AT� EMBANKMENT � �`�� i � � �� � � � SEE DETAIL C � �`� / � EST. 8 TONS CL B C�IGCRETE ,PAVED EST. 11 SYGF __ S�ECIAL CUT DITCH SEE DETAIL H � � 1N � L C�s ANp��,F1PES BEFORE DETOUR BRIDGE � CONSTRU�CTI N. IN L S�L PL�4 ' IN PLACE OF CB FRAME, � GRATE, 8� HO C� AFT ' DET,pUR`.�S � OVED R�PLACE STEEL �� TE��WITPi� F , GRATE�, & HOOD . � I � . \ � � \\ � � ti- � � �� � � I I �� ��� ��� �`� ����. � � ' � ,, � � �, � �, � ` � � � � '�° i � �� �'� � � �I ��i '� I�n� P RAP ��� �� � �, F `��,NK OIF� NO�ftTH �'�t��fiLET � �� � � C�� �q50 P �25�ST 2 TONS � � ��, � � \' �' �� EST 7 SY GF j � � \� � � \ ;� � � \ � `, � ,�F���F � � �\ �\ \ ' � � � - � � , �� ���n �, � � � ,� � � � ��� t /� , J�, ' 15" �iCP� IV ! � \ � � � __ r r � 1���'��; � �-� SgG APPROACH ° °� �� � � ��r���� r� r�Y'n�i7 t� v+ \ i� TO �'STA. 22 + 80 _ � TS PROJECT REFERENCE NO. SHEET NO. B-5/23 4B RM/ SHEET NO. ROADWAY DESIGN HYORAULICS ENGINEER ENGINEER INC�MPL]ETE PLANS DO NOT I�9F. FOR R! W ACQUIRITION IDREH.IMINARY PLANS DO NOT USE POA CONSTRUCTfON � ���L��l a��u�r� '��Iriii �ti�r��r�`L�1� �—� ���-�,- i��i���I�.i�fii,riu.i,y� \\ UJ.L��'I� I Y i � � �J�� IJJ i. X � , i � � � ' , •�� � � �� :.' ��.���ra� �7� �� TS TS ' -� "� TS �1�' L � � � ' TS � I � �I � � I � i � N � 15" RCP-IV T_ - ('R � ic�� o�i ��� � a t� ()�2GI (� m C 12" CMP ��5�� RC�N�/� -- _ C � : _ , _ �E �I4N —CB����� rrz P, CB �E � �� tx�� � ���� n� � �- — �-�-- _ � � � , — � .�., � � v� � �-- k��'i��:� �`„ � � :� T -' � � '� ' �i ` � . �� � , i x �� � � I �� �_ \ � �� �� � �,BG APPROACI; �� , �_ ' \ �O STA. 2�3 + 24 `�, `� '�, � ,,I � �\ `\\ L I ND A/p g r ���' `�LATERAL 'V' DITCH � � PSH ' W/CL � RIP RAP �� � SEE DETAIL A SEE DETAIL [� ��' / Q10 = 5.6 CFS �' � � � CL II RIP RAP � � �� � � I � � � , �, � i / � BANK STABILIZATI(JJ�I� � �� \������� �, s � � � ��� �� ; � / � ,� � � ,' � / � �' / DENOTES IMPACTS IN I� I i/ � SURFACE WATER / � ,' � � ' �' ��; � � �� ; DENOTES TEMPORARY �� ,'� � � �� IMPACTS IN SURFACE W�TEq,' j �� ' _ � l �' PROJECT REFERENCE NO. SHEET NO. o� � B-5/23 4C � ROADWAYEDESIGN HYDRAULICS 640 BEG/N GRZADE � � � '�- -L- STA�JfOO.00 �- - -- --- - — , ENGIN ER ENGINEER . 1. . i _i i i ..l . i _ EL. = 6/8.25 �� i � , I'� i � i� INCOMPLE � PLANS � _� � i � i � � R � DO NOT U3E FO 6W A tiISITION , I ' ' � �_�� � i i ` � _`� � �I� " � � �� --- � � ` PRELIMIN RY PLANS I I - I�� 1 I �-1 ,� i� LI i .� - I � � ��' pp NOT USE FO CONSTRUCTION 630 � I �.� , , I�m � �� �,� � ��-1, ��� i � � �, � �- �i r-r�, -- - - - ; , � � � ��� ry � � --r � I�I BM •2 RR SP/KE /N BASE OF POINER POLE , j; -_ � I � - T . , ,, I- - '; . : . ' '. ; _� -. . �` op L- STA.l8+0%44, 6638' RT, i � � 620 \ _ � � , � , ;-- � _ . . , , F -'� ; 620 �� ` ,.. _ __ . __ _ � , � i i � . : :_ � �' . �� � � ' - -- � �� _ � � PERMIT DRAWING _ `� \,` , , , , , b�o I rl �- I i: -� SHEET 8 OF 11 b�o ��� -- � - ` ` , ' : '; i , r i �i i , �__ i i � , � � �-�I�' P/= /7+36.79 I i ����, EL = 590.99' ---;_ -i_ i I - , �1��. VC - 576' � ! � 600 600 - � . '�._ i � � K = 97 �!- -� � . ' �. ! �_�_�� � � � � � ` � ����� � �� . ��� ���� � .-UPSTREAM BRiOGE `��� " BRIDGE HYDRAULIC DATA �,y� �/ s�owN 590 590 oES�cN ascHaacE = mazo--- cFS I I �_, ,_, _ iiy D£5/GN FREIXlEHCY = SQ_ YRS - '_ � i�/` � DES�GN r�w ecEVanoH = 5Z61... Fr �� BASE DISCyN7GE = IZQfiQ-_ CFS � � � -'---------------------•--- � � �, � � i i _ BASE FREWfNCY �Q YRS i l" 1+) 2' � � �ERTOPPING ELEVA ��' S8H3__ FTS -- . � I .-.� I .:- ..I - I '-- �� ---^----- --.----- / � rJB� -. ii�e�s.� i � i' --�---iu��Cl IIRI RAP I•tiv rJ80 - -� ! � � ;�� j KEYED IN 3.5' (TYP,) .��A� � � � � � - �' ; � � , i' �# g � � : - = FT - � �o-� i i i eFir . +p � i� �: 570 oare of wRVEr ° 4Ll1L20(Q_ CONCRETE SLOPE PROTECTION! t � r �l a\ ° 570 �: WS.ELEVATfON - KEYE� IN 3.5' fTYP.I / ' �� I \ I /��, �x�` r+j^ � � � � AT DATE OF Sl/RVEY ` 543.Q__ FT � - s� � /,� � N p i � � � fy' i � � W END SPECIAL BACK � - EXCAVATE TO EL 568.0 �� \ '�� � EXCAVATE TO E 568.0 O F C U R B C U T D I T C H 5 6 0 _ Esr.�90 cr � �.�`-� EST.60 Cv a+ 5 6 0 BEGIN LATERAL 'V' DITCH -- . - - _-- - : -- - - -- - - - ----- -- - -�=r �' \ � I \ �• CL il RiP RA ON BANKS EL= 58591 � w5E 559.0 I END LAT£RAL 'V' DITCH DnTE OF SURVEv STA23+09 �9/i4/20io1 EL =568.00 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 _ _ �. . � � � � _. 640 : 640 _�_ � � �� � � � � _ � � �� � ��� � � � � � 630 � �� ���� ��� �� ,� �� ���� ��� 630 � � '� �'� � '� �'� � � � �'� � BM •3 RR SP/KE /N BASE OF POWER POLE -- - --- - - --- - -- - - ---- _ �_ -J ' _ _— �� � �� , � � �� � �� � �� �� , . ,. ,. , � - _ I' _ -L- STA25+77A3. 6BA5' RT. , �; ' � � � � � � 620 -- --_____ 620 END GRADE - ' ' : -�- sra 3ofoo.00 � G RAD E I N S ET —L— LT & RT 610 �' ��_ , EL. - 58720 �. ' � : 610 — - � �� _. - � � II . BEG/N GRADE �� ma — ++�i -L- STA/9+85.00 --- END GRADE , �� � � � � -� . I : P� = 2o+oa.90 � � - - 23+00. 600 - , ; � � � � : : : : : . ' ' �. EL. = 590.10' L 589 �� 600 W" ^ ; � � , ; ; - - - - - _ - - � EL = 589.96' - -- -- _ � � : E . 90' ; � ; 4m�� - ---- -- - - --- - - - : �� ���� �� '^s* u ��� ��� � �� ���� i� li� — - ----�- --- ---, _ .. ... . . 2VN .. . . . ... .. .... .... .. ....... ... 590 mo�W 590 f -J0.3000% +�4�/. � f+11J8% � � � � � � � � � � � � � � � � �� � � � — � � � � � � � � � � � � �.� � . . . � � � � " � " � __ _ � � � � � � � --�_��az"--------- � � 580 ��, , — ---_ __ _.-�_.._. __ --__ ^ , ' �� ' 580 _ __,_.__ _. _ __ � � YTTti� �� �� Z�"l i � � ; � � i r� � �, c�c���� a, ti� i i - -- y: � RIGHT D�TCN � � mo��� �i� � , �� a* �� I - - -- - - � - - � I� � \ � _� ,� � � , � „ * " BEG/N SPE / C D/TCH i I � v _ � � ?u'�� W A 26+ [ i i W � W . J-� ------- - ----- ---- - - ---- -- �- i � -- - �--- -. - �L i - ` . � � . ... . . ... .. . 570 Wu W e� -saa.4s �� a ` �� � [FFT l�l�cH 570 � ���� � -; a � I = _ --- _ - - - �---J / � :_ '� ��'�� � a I � � , � ~ : � � � � � r \ � FOR -L- PLAN VIEW SEE SHEETS 4 & 5 ,� o Q � � �, � � W : �� �� 560 °? ,: ,. , , ,., ,., Z � _ 560 y � , , : . , , , , � . , . , . , . . , , • , � - i - - � , II - - - - - - - i . i i i - i i i i �i � � � ` �� _ �__ _ _ _ ' ' - -`- - `-' - � �/ FOR STRUCTURE PLANS SEE w� � � ��� � �� _ � __, � � _ � � , : , _,__ . , .. , _ _ _ __, - G� SHEETS S- THRU S- r� �� �� �� �� �� 25 26 27 28 29 30 31 32 19 20 21 22 23 24 25 �� � .,., � ■����■■����■�■��������������������������������������������������������������������������������������I�II�,� ����■A=��'C°�C�■��� „ ,'��' ,. !� .�.. ������ � ���W��u�llll!illliillliillllllll�IIIIIIIIiiIIIIIIIIiillliillliillllllll�IIIIIIIIiiIIIIIIIIiiIIi�SN■ Yu�:��� ��������uY�■Y� �� ���������� .°... I�IIIIIIIIIIIIIIIIII�IIIIIIIIII�IIIIIIIIIIIIIIIIIIi�3��:E=.9e��������:EE��9=.���� ���������� �I�II��I�I�I�I���I�III�I�I�I���I�I�III�I�I�����III� �eE�� ��='9 �� . ■■■�■■■■�■ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII���:����:�_.�:�■� ����:�� � � � . I�II����III����III���III���IIII�I�II�I�I� � �fi=E9� 3 �°e�'��'.� ' � ' ' � ' • : ' ., IIIIIII�IIIIIIIIIIIIII�IIIII�IIIIIIIIIIIIIII�! e �� � ■ ' � C ' • - -' . , " IIIIIIIIIIIIIIIIIIII � °• ��■■N��a�N :.. " IIIIIIIIIIIII ■�'��:C � i m: C m •, ■■�■IIIIIII�IIIIIIIII � ..:•� IIIIIIIIIIIII -'-, � �' . .. ■ '' ° ° ■ I0��11� •, �C�eC .:::::::::::::::: . ::::::.�:�� �����������C��p��: �—�s .................. ......... :: .��..��..�v.� ..v�..�e.—.....m... —��s������������������ ��������■ �m��m�mu—���mo�m���omu�m��o �—�������������������� ��������■ ��m�m�mo—� ��aaam��s�omouor�o ----iiiiiiiiiiiiiiiiii iiiii� �i����iii�mo�mn�iiAnom����moi�iii° ----iiiiiiiiiiiiiiiiii iiii ��m�m= s°� �s�����viu°°u w�ii : 1 : 1 �����u���������u��� u�� ������vm ��m �������������� u mwou��uu��s—o�a �aw—�w—��uum��. ������������� u �m��m��sm m—�—�mum�■ �������������� �t�a���aa��a—�s �t---�m��o�r■ �������������� o�i w�m��°�i���Ci� r mu��a �a •�= ��a -�iio �ui��u �A=� ' � •- r...='� � - ��:����:���� � �..��.._�.��.��. � '' - . _ - aC;.����.��.00�. �..... ...o .�.....�..�..... . i L� r - ��r� . ; � � � —�m�mm�mmv�� �� � ?� �j . . ��a�uu����ua�u���uu�suusm���m� • I / -�W�YYVY��Y_�Y���YY��YYY_��YNVY� � .. � _ �asm�oo o��aa�m��ao�muoa�m000� —�m�oo °o�o��o� �o��m�mu ov�oo �� .1 � � —�s�oa ��ao�m�ao�—ua—�oa ■ • � � � �Mw�aaww��w�r�a��aA�w�aww��www� . 1 i i ���a�o��m�����m�����mo�� , ' � II � ' I � � � • �-�����o�--� ■■iiiiiiii■iiiiiiiiii■iiiiiiiiiiiiiiiiiii�-�iao �ia �������s ao :' I /'• �• • i i �a�ooC���oCai��u�i�aa�au ===C�==�===C :::::::�::::::::::C :::::::::::::::::::�_���:������� , , : , —��—�sa�—��— �����������������r��������������������oa��a�a��oaC��aa�m��ao�sas—�oa � • � ������������ iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiio��°smo��o�� �o�� �m ' � = == :::::::�::::::::::C:::::::::C:::::::::�_�:°��:������C� , ,., — -- ......................................m—vm—m�—m�—m - , �.. — �.— ........................................e.��...e�..v�....�.....�..�...s : , � ......................................��.�....�.s..�.�..��..��...v - — . ......................................�.—v.��..��..��.�v.� , - ,-- , — ' ����������������������������������������—m�oo ��o���m�—uo—� — ' '/ �����������������r��������������������aa�—�m�on ��ao�m��m��muaa��m� � • �•- • � � / : ' .. iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiimi��� ��on mii��i��� �°°° ■ ° � • �-- � - o ��������������������������������������m—�m�m - = :::::::�::::::::::C :::::::::::::::::::����o�:� � u�uu�umu�umu�uu�u���m�om���waw��o� • � 1 II ����������������������������������������ou�—vo�u ��s -� �. � i� .. �����������������r��������������������aa��—maC�ao :::::::�::::::::::C :::::::::::::::::::�=�:°�C:C� , II ��������������������������������������-o�_��oo���o- � ' � � . � : � �iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii�i�s�a�i°o°a��i_i� I I . 1 1 • ��O1��W�ttt��U�tOt���tti'■iiiiiiiiiiiiii�iiiiiiiiiiiiiiiii�i�iiiiii'■Diiiiiiiiiiiii�i�i�i�iiiiai�Csro°i�ii�i � : • •I, . 1 1 �°���������i i� �i �i�� �i�i � i�i �i��i�i� � i� �ii� i i �� i�° �� i�i �i��iiiiiiii� =�mA��� �iiiiiiiimi� W����� �����������O�p\NN �� �� 0��� 0����nn �� •, ���_ :■■O � � �■YY�pp� ' • � ■■■■�� ■�0����m �m , ■■n fl��n� � ����0 � ���� �Bfl����flB�� ��� : 1 iuuu�i iiu�i uui�uu�iuiu ��u� : 1 �uu�u����u�uu�uu�uwu�u I �iii ■��i�iii�����ii�i�iiiii�������iim �o mo �����oo� ����� m am��m �m �� m �o��o����������o��o��o������o��m ��aoa��m�ry�oo a�m m��oo� ,On�„�NO�� °�0�ppp��0��� �OpN,�On°Nn��nNppp Bp��Np=n���H nN, � ��uu�■.p.����������w� 0•� ■O■■Y.p��O��WV�u■ ..■■�pp��V����pp��.�O�Yp � ���� �������-�Y�Y•�� �■�fl���■■�■��n���- �� ■ �o��oo�� — ��� �m� ��noam���n����m �— ■ ioo��ooi�ommo��owi� oai�onamioa�iiaau�=oii�s ai ■iou�n..i��!�iaio s��u�°u.iy���viau�i��uai i�� . °o��u°uii i°� �°uQi°uS~°ii i�°°u�� � . . � - .. . 1 ��oiiGi�iis�ii�i�G�iii��i����� m� � ��o�iiiiiGGi�iioii� ��� . 1 � G �� . �n :.'—�� �� � . � �imm �� � � .:m "p' :C�mmC. n� � �oxuw�ii�u�i °i°u� v��uu�uii Wu�iu°°i°� � ' °�i��°uG�iuiiu�6ai�m�au��� � • ' � . ::::��.m���.������.�C ......... ........ ......... . .. �. � • �..��. � . . . ......��..e._ . ..._ �.. .._......� ...�..... ...�E... ...�_ .. ....� . . , , .. .�..�.� ...:..... .. .— .. . ..... .�. ..p. ...... ... ..... ... ... ... ... .... .. � L� '� �a�.��� �.�� .��.� m :::::�:C: :::::C:: E:�:G:::: :C:=i=:> >:C:o :� a�C p'..a. apao.:� a: � � .0 : :u :.. �'.:u .W � .°�. �.0 :� ....�.. o ���.::C::T.C.'C:::.C.: ::T.C.:C� . T.�..�' .T.C.�.�� :.C.: '.'�:.:: a ::C.� :v . � . . . . , u�u���u����o�uu�ao�u��u�u�un�u���m���o�uu�uu�u�i ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ i ■ ■ ■�OO��ow�������ii�o��on�ao��oaow�� ,� .� 1 1 r � � � � � � � � Pipe or Ditch Outlet A L Square Prefoi Scour Hole (F (Rip Rap in basin not shown for clari DETAIL A PREFORMED SCOUR HOLE *NOT TO SCALE PLAN VIEW WSTALL LEVEL AND FLUSH WITH NATURAL GROUND A J SECTION A—A F��� PIPE (d = 15" OR 18") S�O �°�c D PSRM INFLOW NATURAL � _ �� GROUND LINER: CLASS B RIPRAP F�— B—►i WITH GEOTEXTILE MIN. 1' TUCK STA. 18 + 00 LT STA. 22 + 84 RT DETAIL F SPECIAL CUT DITCH ( Not to $cale) FronT ot Ditch NaTural � p�� �e< Slope Ground ?•j p F\O Min. D = 1 Ft. FROM STA.26+50 TO STA.29+38 LT FROM STA. 11+50 TO STA. 12+07 RT —SRVRD— FROM STA. 12+07 TO STA. 12+50 RT —SRVRD— FROM STA. 16 + 50 TO STA. 16 + 83 RT —SRVRD— B = 4.5' D= 2' w= s� K� DETAIL G SPECIAL CUT DITCH ( Not to Scale) Front �� Diich Nafural � A'1 ,�y< Slope Ground ?•) F��' d D Min. D=7.5 Ft. Max. d =1.5 Ft. Type of Liner= 4" CONCRETE DETAIL B TAIL DITCH ( Not to Scale) Natural � Natural Ground 3 � ,�.'� Ground D Min. D= 1.5 Ft. FROM STA. 21 +29 TO STA. 21 +82 RT FROM STA.21+69 TO STA.22+50 LT DETAIL D LATERAL 'V' DITCH ( NoT io Scale) b Natural Fill Ground ?y p 'L�'� 1"iFt. Slope d Geoteutile Min. D= 1.5Ft. Max. d = 1.5 Ft. of Liner= CL B Rip—Rap b= 5 Ft. FROM STA.23+09 TO STA.25+00 RT DETAIL C RIP RAP AT EMBANKMENT ( Not To Scale) 10'min. Ditch 7,0'mi� Grade � GEOTEXTILE � FROM STA. 21 + 67 TO STA. 21 + 78 LT FROM STA. 21 + 69 TO STA. 21 + 87 RT DETAIL H SPECIAL CUT DITCH ( Nof fo $cale) Front o� Ditch Natural � p,'� �g< Slope Ground ?�) Q\p d D Min. D=0.9 Ft. Max. d = 0.9 Ft. Type of Liner= 4" CONCRETE FROM STA. 14+50 TO STA. 15+72 RT —SRVRD— FROM STA. 15+72 TO STA. 16+00 RT —SRVRD— PROJECT REFERENCE NO. SHEET NO. B-5/23 5 RNJ SHEET NO. ROADwAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLE E PLANS DO NOT I;SE FOR i W qCQU[91TION Il'RELIMIN IdY I'LANS DO NOT USE FO CON9TRUCTION PERMIT DRAWING SHEET 10 OF 11 DETAIL E SPECIAL BACK OF CURB CUT DITCH (NOT TO SCAIE) _� NATURAL GROUND \•7 .11� � — — FROM STA.25+00 TO STA.26+50 DETAIL I RIP RAP BANK STABILIZATION ( NoT To Scale) EXISTING BANK 2' CLASS II RIP RAP w/ STREAM BED GEOTEXTILE TO NATURAL GROUND Length= 81 Ft. —L— STA. 22 + 10 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -SRVD- 12+43 Lt BANK STABILIZATION < 0.01 < 0.01 9 10 1 -L- 21+78 Lt BANK STABILIZATION < 0.01 < 0.01 9 10 1 -L- 22+10 BANK STABILIZATION < 0.01 < 0.01 81 10 1 -L- 21+69 Rt BANK STABILIZATION < 0.01 < 0.01 13 10 1 -L- 21+67 Lt BANK STABILIZATION < 0.01 < 0.01 15 10 TOTALS': 0.02 < 0.01 127 50 0 'Rounded totals are sum of actual impacts NOTES: � � � s � � T � �i � N � m� � °N'�o+ � �� �� o�. � T_ � �C N�L } O� a o� ��a o�� M N � � � ., � V W � � � � � � � � V � � O V See Sheet 1-A For Index of Sheets J BEG/N TlP PROJECT B-5/23 -� - sra. �3 foo.00 � --i � -� __ - � ii i ! ii i � ��� �,:��-�,i � � TO ATHE LIMITS ESTABLIS�,EDTBY AMETHODR �ORMED OF THE�CIN OF CON�CORDE MUNICIPAL BOUNDARIES -DET2- STA.Ilt84.66 i � � ����� �� ����� �������� �������� �� �������� CABARR U.S CO U1�TY LOCATION: BRIDGES #14 AND #19 011I US 29 OVER ROCKY RIVER A11tD ACCESS RD. TYPE OF WORK GRADIIVG, DRAi11lAGE, GUARDRAIL, PAVIIVG £�' STRUCTURES EGIN CONSTRUCTION -SRVRD- STA//+/4 -DET2- STA/4t3g +/- O _SR�R� � -DET2- STA.l7t23 +/- � � � EiV CONSTRUCTION \ � �,q -oEr� \sra2o+32.� �.� �� `�� ���,, �� �� -�ET2=,� � , � -- _ � �/ �� — — ------ - / � \� � / -- ------- - - \ � - � �� j l� � i i ��> ��� � � i i� i� i � \ / i /� � � �� / � �� ��� � �i � �/i i i i �� �✓i /i �j �' � �\ �� ;% ;; , -L- STA20t34 +/- -�rnrru- END T/P PROJECT B-5/23 � � -L- STA. 30+00.00 ��;�� �� �� ; ,� ,; ��_ _____, ��-_ _ ___-- __: _� _ , � ____-- � _ — ---1--�— __ __—___=====J=—,=--__ _:--_ ���_� , _— — ---- -- — ____— — s------- — -- " ---- % =__-- ---- 7A--�ON _ _- --- =__= — _ — —�-`7—==== __ _ — — �__—__—____=_— - - '�� � I� ----- --� I I y �,1 ` � I UII t � � \ � � � _---__� � �,, V " �l � � r I � I ) ' � ��� � i f '� �� / i 00 c���" � 2�° 2 PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION Prepored /n 1he Olf/ce of: �'DRAULICS E1YGIlYEER DIVISIOIV OF HIGHWAYS GRAPHIC SCALES DESIGN DATA PROJECT LENGTH STATE OF 1YORTH CAROLINA ADT 2016 = 32,30o DIVISI0IV OF HIGHWAYS $� 2$ 0 50 100 ADT 2036 = 50�30� 7000 Birch Ridge Dr., Raleigh NC, 27610 ��p MORtp� DHV = 11 % LENGTH OF ROADWAY TIP PROJECT 8-5123 = 0.280 MILES zo,z szaxnann SPEC7F7CATlONS ��� +'o� PLANS ' D = 65 % P.E. q � LENGTH OF STRUCTURE TIP PROJECT B-5123 = 0.042 MILES srcxnruxE: � : 50 25 0 50 100 T- 5 %* RIGHT OF WAY DATE: G.E. BREW. PE A a V= 50 MPH APRIL 29, 2015 f'ROJECT ENGINEER ROADWAY DESIGIV ''Rgf o�` PROFILE (HORIZONTAL) * TTST =2% DUAL 3% TOTAL LENGTH OF TIP PROJECT B-5123 = 0.322 MILES E1�GINEER OF Tp�y9e l0 5 0 l0 2p FUNC CLASS = MAJOR LETTING DATE: THAD F. DUNCAN, PE ARTERIAL APRIL 19, 2016 f'ROJECT DESIGN ENG/NEER PROFILE (VERTICAL) REGIONAL TIER P.E P.E. SIGNATURE: STATE NIGHWAY DESIGN ENGINEER Note: Not to Scale *S. U.E. = Subsurface Utility Engineering BOUNDARIES AND PROPERTY.• State Line ----- County Line ---- Township Line ---� City Line --� Reservation Line — � Property Line Existing Iron Pin Property Corner Property Monument Parcel/Sequence Number Existing Fence Line -x Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence Existing Wetland Boundary - - - Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary BUILDINGS AND OTHER CULTURE.• Gas Pump Vent or U/G Tank Cap Sign Well Small Mine Foundation Area Outline Cemetery Building School Church Dam HYDROLOGY.• Stream or Body of Water Hydro, Pool or Reservoir Jurisdictional Stream Buffer Zone 1 BufferZone 2 Flow Arrow Disappearing $tream $pring Wetland Proposed Lateral, Tail, Head Ditch False Sump ����� �� �����il �c������� �������� �� �������� CONVENTIONAL PLAN SHEET SYMBOLS � � O �zs —x—x- � � � -.�a- - - - .�a ECB EPB O O s 0 w 5z � 0 0 � � � �----J —�s - BZ 1 BZ 2 E - >— — O�"...� � � �� TrTl E— m RAILROADS.• Standard Gauge �-�--� CSX TRANSPORTN/ON RR Signal Milepost M/LEPOST 35 Switch 0 SW?CH RR Abandoned -� � -� �- RR Dismantled -------- RIGHT OF WfIY.• Baseline Control Point � Existing Right of Way Marker 0 Existing Right of Way Line - Proposed Right of Way Line �— Proposed Right of Way Line with � Iron Pin and Cap Marker Proposed Right of Way Line with � Concrete or Granite Marker Existing Control of Access ��— Proposed Control of Access � Existing Easement Line --E-- Proposed Temporary Construction Easement - e Proposed Temporary Drainage Easement TDE Proposed Permanent Drainage Easement — PpE Proposed Permanent Drainage /Utility Easement �ue Proposed Permanent Utility Easement rue Proposed Temporary Utility Easement rue Proposed Permanent Easement with O Iron Pin and Cap Marker � ROADS AND RELATED FEATURES.• Existing Edge of Pavement Existing Curb ----- Proposed Slope Stakes Cut --- �--- Proposed Slope Stakes Fill --- F--- Proposed Wheel Chair Ramp �C Existing Metal Guardrail Proposed Guardrail T T T T Existing Cable Guiderail n n � Proposed Cable Guiderail n n n n Equality Symbol � Pavement Removal � l�EGET�9TION.• Single Tree � Single Shrub o Hedge Woods Line �`'''-' Orchard fl f� fl f,� Vineyard ��^aY��d EXISTING STRUCTURES.• MAJOR: Bridge, Tunnel or Box Culvert coNc Bridge Wing Wall, Head Wall and End Wall - ��aN� WW � MINOR: Head and End Wall coNC �w Pipe Culvert Footbridge �--------� Drainage Box: Catch Basin, DI or JB ❑cB Paved Ditch Gutter ----- Storm Sewer Manhole OO Storm $ewer � UTILITIES.• POWER: Existing Power Pole ♦ Proposed Power Pole b Existing Joint Use Pole � Proposed Joint Use Pole -� Power Manhole OO Power Line Tower � Power Transformer � U/G Power Cable Hand Hole �H H-Frame Pole �� Recorded IA�G Power Line P Designated IA�G Power Line (S.U.E.*) - - - -P- - - - TELEPHONE: Existing Telephone Pole -� Proposed Telephone Pole -o- Telephone Manhole OO Telephone Booth ❑e Telephone Pedestal � Telephone Cell Tower � WG Telephone Cable Hand Hole �H Recorded IA�G Telephone Cable T Designated lVG Telephone Cable (S.U.E.*) - - - - -*- - - - Recorded U�G Telephone Conduit *_ Designated lVG Telephone Conduit (S.U.E.*� - - - -�_- - - - Recorded lVG Fiber Optics Cable � F� Designated IA�G Fiber Optics Cable (S.U.E.*� ----� F�- -- WATE R: Water Manhole OO Water Meter o Water Valve � Water Hydrant � Recorded U/G Water Line • Designated U/G Water Line (S.U.E.*� - - - -•- - - - Above Ground Water Line A.c wa,a� N: N Satellite Dish CC TV Pedestal ❑C TV Tower � U/G N Cable Hand Hole �H Recorded U/G TV Cable T° Designated U/G TV Cable (S.U.E.*) - - - -�•- - - - Recorded U/G Fiber Optic Cable *° F� Designated U/G Fiber Optic Cable (S.U.E.*r ----*� F�- -- GAS: Gas Valve 0 Gas Meter � Recorded WG Gas Line � Designated U/G Gas Line (S.U.E.*) - - - -�- - - - Above Ground Gas Line A�c cas SANITARY SEWER: Sanitary Sewer Manhole OO Sanitary Sewer Cleanout 0+ WG Sanitary Sewer Line s� Above Ground Sanitary Sewer A�c sa��+a�Y se.a� Recorded SS Forced Main Line Fss Designated SS Forced Main Line (S.U.E.*) - - - - -FS�- - - - MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility TrafFic $ignal Box Utility Unknown lA/G Line UK'i Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil WG Test Hole (S.U.E.*) Abandoned According to Utility Records End of Information • O 0 ❑s -z�.�- 0 0 m AATUR E.O.I. � N PAVEMENT SCHEDULE � fFINAL PAVEMENT DESIGNI `..� PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TVPE 59.58, AT AN AVERAGE RATE OF 168 LBS. PER 5�. V�. IN EACH OF TWO LAVERS. `..z PROP. APPRO%. 1 1/2" ASPHALT CONCRETE SURFACE COURSE� TVPE 59.5B, AT AN AVERAGE RATE OF 168 LBS. PER 50. Y�. � -L- PROP. VAR. DEPTH ASPHALT CONCRETE Sl1RFACE COURSE� TYPE S9.5B, $� 75' 49.5' 49.5� ��J� C'3 AT AN AVERAGE RATE OF 112 LBS. PER SQ. V�. PER t �EPTH. TO - BE PLACE� IN LAVERS NOT TO EXCEED 1L2" IN �EPTH. �O� �Z� �2� �2� ��.rJ� ��.rJ� �Z� �2� �Z� �O� ORIGINAL g� MULTI USE PATH PROP. APPROX. 4" ASPHA�T CONCRETE INTERMEDIATE couasE, GROU ND MULTIUSE PATH 3' � �� TYPE I19.B, AT AN AVERAGE RATE OF 456 LBS. PER S4. YD. R2 p� C� CZ R� T T R� CZ D� C� R�L 0_02 0.02 � - ?:7 0.02 �- -� o.oz , PROP. APPROX. 2 1/2" ASPHALT CONCRETE INTERMEDIATE COURSE, s- - ti:� O.O? i _ _ ______ _ O�_OZ D2 TYPE I79.B, AT AN AVERAGE RATE OF 285 LBS. PER so. vo. 6:j !l '6' ��� - � I�/�'� 6�' � -� � - ..:., '` --I f� Par� 6" PROP. VAR. �EPTH ASPHALT CONCRETE INTERMEDIATE COUPSE, 'r +�- -�- E� E� -�-I�-�a T TYPE I19.B, AT AN AVERAGE RATE OF 714 LBS. PER 54. YD. PER 1" S 14�� � �/ SEE INSET �B� W � �4�� S D3 DEPTH, TO BE PLACE� IN LAYERS NOT LESS THAN 2%Z" IN DEPTH OR E� V U E� GREATER THAN 4" IN �EPTH. GRADE TO THIS LINE GRADE TO THIS LINE E.� PROP. APPROX. 7" ASPHALT CONCRETE BASE COURSE, TVPE B25.B, TYPI CAL S E CTI O N N O. � AT AN AVERAGE RATE OF 399 LBS. PER S�. YD. IN EACH OF TWO LAYERS. * TRANSITION FROM EXISTING TO TYPICAL PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.6, SECTION NO.7 FROM -L- STA. 13+00.00 E,2 AT AN AVERAGE RATE OF 114 LBS. PER S�. YD. PER 1" �EPTH. TO BE PLACED IN LAVERS NOT LE55 THAN 3�� IN DEPTH OR GREATER TO -L- STA. 14 + 50.00 THAN 5�/p" IN DEPTH. �J� PROP. 8" AGGflEGATE BASE couase. -L- STA. 14+50.00 TO -L- STA. 16+50.00 -L- STA. 24+00.00 TO -L- STA. 26+97.04 R� 1'-6" CONCRETE CURB AND GUTTER. USE INSET 'B' IN CONJUNCTION WITH TYP. SECT. NO. 1 '-L- STA. 13 + 00.00 TO -L- STA. 14 + 50.00 R'Z 2'-6" CONCFETE CURB AND GUTTER. R3 5' CONC. ISLAND 4 -L- 15' 49.5' 49.5' 15' S a" Mu�riuse PATH 10' 12' 12' 12' 11.5' 11.5' 12' 12' 12' 10' ORIGINAL MULTI USE PATH 3' 3' MULTI USE PATH GROUND Cl Cl T EARTH MATERIAL R2 D� R1 T T R� D� R2 _'_ �.�2 �.O? J� ?'� Q:� �.�2 I � �.�2 �- -� a.�2 . I �.�2 U EXISTING PAVEMENT J� , � _ I I 6 GRADE b_ I I _ �� II \ 6:1 T��� 6" 14" 'ir POINT �ir 14„ 6�1Y"' T g � S E� GRADE TO THIS LINE GRADE TO THIS LINE E� V INCIOENTAL MILLING TYPICAL SECTION NO. 2 W VARIABLE DEPTH ASPHALT PAVEMENT (SEE STAN�ARO WEOGING oeTni�� -L- STA. 16+50.00 TO -L- STA. 20+34+/- (BEGIN BRIDGE) -L- STA. 22+54+/- (END BRIDGE) TO -L- STA. 24+00.00 46' � -� 46' 71.5' 11.5' 8' 12' 12' VAR. 12' MIN. VAR. 12' 12' 8' 4 -L- Detail Showing Method of Wedging � z Q � N � m o! r;? p. LI oa s �� � �I }� ORIGINAL �� 4� C2 R3 R3 4 Cl GROUND , 0.02 o.oz , � ?�� 4:1 - ---- -- ------ 6: ) _ _ _ _ _ _ \-F61rTT � GRADE TO THIS LINE T p� E� �4" y�r �„\ 14" p� El �J GRADE TO THIS LINE TYPICAL SECTION NO. 3 GRADE TO THIS LINE -L- STA. 26+97.04 TO -L- STA. 30+00.00 53'-2" 10' * 12' 12' 12' MULTI USE PATH � � � * � Q.�2 � �.OZ � -L- is� BRIDGE SECTION �- ORIGINAL GROUND VAR.SEE X-SECTION �ORIGINAL GROUND GRP.DE TO THIS LINE PROJECT REFERENCE NO. SHEET NO. B-5/23 2 ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION ORIGINAL GROUND x-secrrox ORIGINAL GROUND - ORIGINAL GROUND x-srcrrox ORIGINAL GROUND 53'-2" 12' 12' 12' * 70' * BICYCLE SAPETY RAIL MULTI USE PA7H TO BE DETERMINED BY * STRUCTURE MANAGEMENT UNIT o.a2 . 1 o i _ ADE INT BRIDGE SECTION -L- STA. 20+34+/- (BEGIN BRIDGE) TO -L- STA. 22+54+/- (END BRIDGE) � z Q � N � m o- �, o. �L� oa o `6i � �� }� PAVEMENT SCHEDULE lFiNAL PAVEMENT DESIGNI C1 3„ S9.5B C3 VAR. S9.5B D2 21/2„ I19.OB J1 g" ABC T EARTH MATERIAL U EXISTING PAVEMENT W WEDGING 3' 1 0.°2 � � —DET2— DETOUR BRIDGE SECTION -DET2- STA. 14+39+/- (BEGIN BRIDGE) TO -0ET2- STA. 17+23+/- (END BRIDGE) Ci —SRVRD— »� i t�� POINT i 0.02 � �, � — — _ _ _ — _ _ _ — — GRADE TO THIS LINE W GRADE TO THIS LINE ORIGINAL GROUND U Z�� . TYPICAL SECTION NO. 4 -SRVRD- STA. 11+14.00 TO -SRVRD- STA. 17+25.00 ��I���� �—�—`—'—� `-------- MIN. ------ I Detail Showing Method of Wedging U USE WITH TYPICAL SECTION NO. 4 3' *11' W/GUARDRAIL C� —DET2— �s� n� ir 4' FDPS C� GRADE POINT ,8, 4' FDPS PROJECT REFERENCE NO. SHEET NO. B-5/23 2A ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION �o.oz a.o2� I I I 2•� � ti'� �� T �iF�- 13.5" 6-�it� T ORIGINAL GROUND D2 �� ORIGINAL � � GRADE TO THIS LINE � TYPICAL SECTION NO. 3 -DET2- STA.11+84.66 TO -L- STA.14+39+/- (BEGIN BRIDGE) -DET2- STA. 17+23+/- (END BRIDGE) TO -DET2- STA. 20+32.72 ORIGINAL GROUND ��� -- �—SRVRD— � 13'-41' � 10'-29' VAR. � 7� � � 7� VAR. ' GRADE I POINT C1 1 T � 1 SLOPE PROTECTION 0.02� 0.02� (SEE STRUCTURE PLANS) � 1' VAR. � VAR. � — � 30'-58' 27'-46' � — — PAVED RT. SHOULDER UNDER STRUCTURE TYPICAL SECTION OF ROADWAY U N D E R STRU CTU RE @ SLOPE DETERMINED BY GEOTECHNICAL UNIT � Q � m � -o 2 M N �, Pipe or Oifch ou�let A L Square Prelo Scour Hole (I ^ROp Rop in bosin tshown farclori DETAIL A PREFORMED SCOUR HOLE 'NOT TO SCALE PLAN VIEW iNSrnu �EVe� nNO FwsN WITH NATURAI GROUND A J SECTION A-A �� PIPE �d < IS" OR 18"� s`�F o PSRM ��F�ow LINER: C1A55 B RIPRAP F^ 6� WITH GEOTEXTILE MIN. i' TUCK B = 4.5' D - 2' w- 8' iD8 S7A.18+00 LT OSTA. 22 + 64 RT � 1 CNARLOTTE MOTOR $PEEDWOY uc BEGIN TlP PROJECT pg 5�52 PG 0360 OB 5290 PG 333 �- ���. �3 f��.�� r,.Ur�`-�'' " �-wr•-�;�'�'�- - -.�--,='..� �TC�r��'R�-��W: -- -DET2- POT Sta.10+00 BST __� � � �-^_ ,�n�� � ���^�"� .� �� a � � �` w000s ��-'"i� \�� ` l � � _. . . . . . . .. .. .. . .- - q e s, N� R�w ,� - oi � ETE= - ° - - RI AP -�DI��FTAI� 15 RCP RIP a4� � �F - �_ � -��� _ -r �a p� Z��� rn �6"�&G � � DETAIL B TAIL DITCH � Hoi io s�aie� �.a� 1 �o,�,o� Ground 3_� ,s.� Ground D Min. D= 1.5 Ft. FROM STA.21+29 TO STA.27+82 RT FROM STA.21+69 TO STA.22+50 LT PROIECT REFERENCE NO. SHEET NO. B-5/23 4 DETAIL D DETAIL H WW SHEET NO. LATERAL 'V' DITCH SPECIAL NT DITCH (Na��o s�aie� �No.io smle� ROADWAY DESIGN HYDRP.ULICS p,o„� ENGINEER ENGINEER o„�� �.oi - F�u G�, � n� � sioae Ground ) p � 1"hl. Slope round 7�� F\o��e� d d D Min. D=0.9 F. Max. d=0.9 Ff. Geofex�ile Min. D= 1.5F1. Type of Liner= 4" CONCRETE Moz. d= 1.5 Fr. FROM STA. 15+72 TO STA. 16+00 ar -savao- PRELIMINARY PLANS Type of Liner= CL B Ri�Rap b= 5 Ft. DO NOT USE FOR CONSTRUCTION FROM STA.23+09 TO STA.25+00 RT DETAIL E DETAIL F DETAIL G SPECIAL BACK OF CURB CUT DITCH SPECIAL NT DITCH SPECIAL CUT DITCH ,�orTO S�A�E, ,�������a�e, ,������<O1e, FOR -L- PROFILE SEE SHEET b � GROUND D'itch Dit<h � ��ral � d'� �(g< SIoPe N � r I � 6� �`e� SIaPe Z. -�- -� �_ o.o��a z:� p ew" c�o��a L� D F\� M�,,. o=i.s Fr. NEATHER MORRiS JONES a� M��.o= i F�. d Ma..d=is F�. UONALO ALLEN JONES O O�PB50,6 P�'fi p2 ,� �° FOR -SRVRD- PROFILE SEE SHEET 7 Type of Liner= 4" CONCRETE � � FROM STA.25+00 TO STA.26+50 FROM STA.26+50 TO STA.29�i��38 LT ' w FROM STA. 11+50 TO STA.12+07 RT -SRVRD- FROM STA.14+50 TO STA.15+72 RT -SRVRD- �° °�o �. W \ FROM STA. 72+07 TO STA. 12+50 RT -SRVRD- `� FROM STA. 16 i� 50 TO STA. 76 �i� 83 RT -SRVR0. F � -SRVRD- PC Sia.14+07.86 � � �� RVRD- PoT S�o. lO+pp,pp -SRVRD- PT Sio. l2+1239 \�E � � 2� \� -SRVRD- PT Sto.13+7722 � � 5 6°0�_08. W\ -DET2- PT Sla. +20J2 EI,NSTALL OTCB, TE P.E�RARY PIPE AND DI BEFORE DETOUR ���g' � B �IDGFEQ I�STRUCTION. STEEL PLATE IN PIACE OF �� s Ne3q- 'DET - SiO. I�J'F�JLJG � OTCB'F6R-T�T€I�DETOUR BRI ' EMBAN T IS -SRV� Sb. 955/ z5• '} REMOVED REPLAGE'STF�ti�AZWITH CO - TCB ��9�n� AND�RE-�OVE�TE PORARY PIP -� I�.�, - y -SRVR�- StO. �4'�'�Z.QS Bp� pF NORTH CAROLINA � �� o�o; BEG APPROACH SLAB �= 28'�5i/' 02A' pB 9�50 PC 25i � N -SRVRD- /o. l t �� \ -L- �� �Z0+09+/- 2- �� O+ 4 s�° �_ � +�s -savR�- , CONS ��� l�`' � � � � ao� �r c� s"'eNr p,R � �es� �� END APPROACH SLAB ���6� 40.63' RT -Jl�V - s �f�. ��-f� . a�� �� �e p� � A a � ���/ 6�, oe �` O. e�c B_�/r� 7 , J� 3/ I RAP T EMBA KMEN �o �B. BAr41 O NORTN CA L�NA '�� y' �� � `� '�'4JJJ G � +oa -sevRa ''L, �9s. �� "W se a c �p�� � � 9�5o Pc z5t , -DET2- �RC 510. l9 +23--5R ° �\ � 43' LT - 6 T� � � I INSY L CB� i'IPES BEFORE DETOUR BRID�� � 50' LT +47- D- 042 ST 5 GF � � u s 10' RT \ �n. � TAIL DI H@ ° ONSTRUCTI�JRP. �tVS L ST C5'�� IN PLACE OF CB FRP.ME, +35 �6. �-4.,� -�% \ DE I GRATE, 8 HdOBS� AFT 15 VE0. REPLACE STEEL ,�,�i42 Q �a�S +34 -5 VR0. E. � �y. 11�0 \ ss<qs +80 L- � iE WI�W� GR�C;E,�PQN�OD o� � P T EMBA NT - PUS� \ � � � 64' RT 130 L � � S . Fy �, � � �`"' �✓�� 5 I l�'ltV I�y -y� 0-S RD- - . -S RD �i� VR0. SEE A�C �'r\ 730 LT +84 LBF SH \ \ t'"� i-76 -L- �r - �'J ''�,�T� CIAL D YS �' 46.20' �T,6 CL F� 148'L J \\ '� /1 � tn �- T F . iw � a2j, 7�i�^ GF ss\ s� 1� 63 -L- 753' L \ \ �. 67.50' LT � +27 -SRVR0. � � �6s��F� L.v\ 160'LT � 115' LT CL 8 RIP RAP II+79 -L-BST ��� _ � � � d f �� A�\ AT OUTLET \ � W O \ O E% R^N � 1Z� --- P PU �~ E � " \��'q�� EST 2 TONS °�, \ \ . qa" �w / 115' BY Rf'CEc A ' 0�5 PU�9?.84 N 0 S 0� I G „+ � -DET2- Pf�C StO. +4257 s rna n� s" F a� �' � ��s� 4 c� i� ea.av e Ev � ve /� �g�i o�o �uaves� � � .ss a � +75 -L- D � . 0 1 �5� � \ \ 59.0 +oo � - � V� ex � ' O7 �o�� � es �ia c oNC � �? END CL FENCE�'�P�E ex. cur izs� ar � � ' "� _� _ � � � V ' a �L- Sio.+i0.00 � � �'s P�F +oo -�- h .2"z60'xl6' � 040 j Fw�, i� 75 L _ � 'ry n' y�+-' `BRU H� �e S u � N'. s. 7°�8� .� w T ln � �nnr� sicN F _ � - V "� �� - � � � RCi�i�i`� ° p ��� is.s f I50' AT iqs" M EGAI �� p��B C� �'Z � RT ,� . - ET2-c � � �� 5� APPROACH � ER F-' J (� UNKNOW �;� esr �� �- �� = 5 e� ReMOVe- E LYFENCE . B°. F �E �irF 2z ao e_ '�� ��� � 16 w s � � v�- - � /�. +i82 e _ � -G- io. o � � � F . c � �c aNOi _ _ A �r P �- - - - Ex tn - __ --- ' � - 6- w � G U 350 ��; � l5" RCP-IV�_ 1�° RCP IV� '__�--, � O� � I(w ��t .�.�r�_..-� - � C � ;^ Cr�f - CB 15' NCP-IV � W , ,_ 6" C&G �s� - � ca - - - - � - � B �;�, ssT Re;�ove ! o00 �-- -i5 i \ 4� cv oaia�, N 1� N \ ��\ � N � O ` � � � ---o--- - -- -- - - - � O S' S6 �O IS" RCP �ES�ja� � - -�_ TYPE 350 50/L MEDIAN -- SD_ - - - 5O - 50 � SO - T - _ - YPE - M7L _ - SD � - �� - � � - � � ~ \ N � �B N N - _ - - �" - n- _ _ - -*"F�- - - _ 2 � m� � \ � is ece-iv oaiz � S oaio o n a � - Fo n �� � - -� - -�`� ,zs � , , , � „�, r � �� _ r� � o�`�'' - r Er � i - " i M r[�- - - B : ��,r _ a,.e,_ ,. � � . T� � e� F- � �� .� �-y�Q57 N � REMOVE \ 0 _ JS 29 _NBL __ 46 B.:J 16" pIP � / r_o _��� 040 N J l. �(dkff qs: _ GI 0 r - e� -- -� - --- � --sa� - �� S M � _ - --- - - N i �i c� -�_ - ?` - � �� = � - �� h l ' ��U�� ''P E� i �� - BEGiN � = ; , -� , ._� � . r a EM' � _ - -- J �� - � �cur.-- - �-_�,Ta� \T uv�-,^�- O _�_�-��Lef/21� - •.u{a..-\- . N-G-��''� oit n� - - - Z _�`. 2�j�!"' T � ..-�INC -� < X-X-� RETAIN F � � - -� � W + � - REIJ7 VE co ... E SPECIAL CUT I._ I � � o, �V o E � � _ �� � i i A,ri� ,+-y O +24 - LDER 7 +17 L_ � - .T A � \4� '� \ 5�+6 \FI\ OPiIC EX' � A A ^ 6 EX. ILW +5 L I bUE END CL FENCE+13 �- B%�CK OF CURB DITC Z �\ \ \ARKCR I +64 -1-1 G G� 92' RT � CL FENCE � O CRE PAVE �� � Q 82 RT SEE DETAIL E g0 J 135' T- F 70. �6Z16 7Cg- F AL DI 1' q +7 �- 91' RT EX. W�M F 135' RT 1 �� / � � P�ROAC � CMARLOiTE 40TOR SPEEDWAY LLC ��� I�' / ag $��Rr �� � ia�� Rr �/� � o a � �eiv,�na i°�,sr. cr�� �VQ To srn. +sa � LiNDA pg. 092�vG��2i RUSiEE Z � � � toa' r � \+ OB 5290 PPC 379 1 � � ^ � � PUE � P� Pl�] V \ \ f lQrjE � �S TON @f r�L F f -(�415 � � \ �, G ,p L C T �� LATE�p L'V' DITCH `�' 2" �� \\ � <�oo I<c ��c /dCST 0 GF _ L + BBr�S ,� � n o � � G i � Q a-n, -_i�, +,. nsae �. � - r tB. 9 N� NI C t.'1: [�Pd/1►[�7:3:71 �Z�3 � I►�:7 � I_\ I[�P►� C�7'7_\7 �.51 �►1 � `A /''�j,GP � ' _+�i(tET ���..._ �, TAIL H @ 0.3% _. VU . Im � +53 -L Jtt Ut15AILL SEE D TAIL D � � �J _ - - - / Gt�' �� 'D'�C`/ ��4 -� �'(35' RT/ /��%i„ � 5 DETAIL B 4' +42 -L- �c' 148' RT 65.5' RT EN � BRI�'if ( GRA55 � 2�L 135' RT ,c \ / , a�9 L �_'b` � .,�l +83_37 �. _ 135' RT 135' NT -�- f0.22f54 �F�- 149' RT � F �> RIPRAP kF tEMBA MEN t n1.43' CL II RIP RAP�48� RT � �F -SRV - //r,�'��12'� +b' RN RV ' S€E DE IL�' +35 -L- ' BANK STABILIZATION � \ � ' ' RT ec r�,0 135' RT q � EST. 6rTON5 L 135' RT � / �\ _ / � • �p� / / ' , w000s .ESr.7 s F �. ',,� I � � � � RIPRAP AT Ef1v18ANK E T ) � � / \/ +,61 �RVRD- qG / � 01�, � � 'r� : E DETA -S�7VRD- S%O. l6 �5.28 -L- Sio. 2/t1057 :� , ' /� / � � z /111 RT / / F "��' � �5 -SRVRD- � EST. TONS C B r � �' � � ��` 22, L7 ,� esr. n sv4F �� -SRVRD- StO. 15+� A 4 p= 7r 55� s2.� � ? _ \ / / / \ � j F �� � S , ,a ,G� 7 +55 -SR"Ra � END � TRUCTI :� � ae-�r -SRVRD- TA.l7+ .00 � -SftVRD- POT Sto.18+9029 I \ N +75 -SRVRD- I � � � 50' LT 9r_C -SRVRD- Pi Sto 11+39A5 Pl S�o /3+3655 Pl Sto 15+9027 p= l2 59' 0&A' (RT 1 p= l3' 22' 375" fRT1 �= l� 02' 435' fRTI D= 8' 48' 53A' D= lE 22' l2B D= 44' 04' 252' L= 1473/' L= 8/J2' L= 247.42' r= 7397' r= 4/A4• T= 182.4r R= 650.Od R= 350.Oi10' R= 130A0' -DET2- Pl Sto 11+54J6 Pl Sto 13+323i p= l7' 00' 43A' fLT1 p= l7' 00' 43A' fRTI D= 9' 32' 575' D= 5 32' 575' L = 178J5' L = I78J5' T = 89J3' T = 8973' R = 600A0' R = 600A0' � Q � m � m � � o_ -o 2 N �, Pipe or Oifch ou�let A L Square Prelo Scour Hole (I (Rip Rop in bosin notshown farclori DETAIL A PREFORMED SCOUR HOLE 'NOT TO SCALE PLAN VIEW iNSrnu �EVe� nNO FwsN WITH NATURAI GROUND SECTION A-A �� PIPE �d < IS" OR 18"� S��F D PSRM �HF�ow LINER: C1A55 B RIPRAP F^ 6� WITH GEOTEXTILE MIN. i' TUCK A J B = 4.5' D - 2' W- 8' 3N8 DETAIL B TAIL DITCH � No� �o scole� �.a� 1 �o,�,o� Ground 3 � Ground � p 3' Min. D= 1.5 Ft. FROM STA.21+29 TO STA.27+82 RT FROM STA.21+69 TO STA.22+50 LT DETAIL D DETAIL H LATERAL 'V' DITCH SPECIAL NT DITCH (Nat�o sc'I-I Fill INorto scale� o,om ,�� �.oi ��� � p� °� sioae Ground l p � 'hl SIoPe d 7'I F\o��e� d d D Max.d=09 Ff. Geofex�ile Min. D= 1.5F1. Type of Liner= 4" CONCRETE Moz. d= 1.5 Fr. FROM STA. 15+72 TO STA. 16+00 RT -SRVRD- Type of Liner= CL B Ri�Rap b= 5 Ft. FROM STA.23+09 TO STA.25+00 RT DETAIL E DETAIL F DETAIL G SPECIAL BACK OF CURB CUT DITCH SPECIAL NT DITCH SPECIAL CUT DITCH (NOT TO SCAIE� � Na� �o Scale� � Na� �0 5<ale� ^ �GROUND D'itch Dit<h \ O � ��ral � d'� �(g< Slope ry � r I � 6� He< Slope � Z. -�- -� �_ o.o��a z:� p ew" c�o��a L� D F\� M�,,. o=i.s Fr. NEATHER MORRiS JONES a� - M��.o= i F�. d Ma..d=is F�. � cp �ONALO ALLEN JONES DB 5807 PC 0l�5 Type of Liner= 4" CONCRETE Q O� �,6 �� FROM STA.25+00 TO STA.26+50 FROM STA.26�F50 TO STA.29�i��38 LT FROM STA.14+50 TO STA.15+72 RT-SRVRD-�Q FROM STA.11+50 TO STA.12+07 RT -SRVRD- FROM STA. 72+07 TO STA. 12+50 RT -SRVRD- - PT S�O �4 ZO.7Z FROM STA. 16 �i� 50 TO STA. 76 �i� 83 RT -SRVRD- PROIECT REFERENCE NO. SHEET NO. B-5/23 4-A WW SHEET NO. :OADWAY DESIGN HYDR.4ULIC5 ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR -DET2- PROFILE SEE SHEET 7 FOR -L- &-SRVRD- PLAN VIEW SEE SHEET 4 :� ° USE THIS SHEET FOR DETOUR CONSTRUCTION ONLY tie � � -DET2- PC 5/0.10+64.42 • � � � BEGIN� E / s�6°03 -DET2- Sfa. t39 +/- O� c�j 8" W�ELNSTALL OTCB, TE P�RARY PIPE AND DI BFFORE DETOUR � ����� '� B It�D�EQ�ISTRUCTION. STEEL PLATE IN PIACE OF �oi � �� � OTZB'F6R-T�T€I�DETOUR BRI � EMBAN T IS \1 \ �5q�z5° -DET2 PC S%O. I%'f52„3R REMOVED REPLAGE'STE�tPL�� E WITH CO - TCB \ z2q 5\W���. \ AND 'R€fLAO��TE PORARY PIP -� I. �-'i -DETZ- S%O. �5'�'7�.7T BANK OF NORTH CAROLINA 5'rn. ta+oo �r °o � DB 9�50 PC 25i �� sTn. zz + ea RT -DET2- POT Sla. /O+Oi0A0 -DET2- PRC t42 ����� � - RVRD- Sro. /4f/2.85 � '6°s>, s6°°9 ss s � w � ti. �a<> 9go -DET2- PRC S►o. i9+4995 9� � � ��; ENrP� o � �55r02A� �6s � � ��'\��� CNARLOTTE MOTOR $PEEDWSY LLC / v���s � 8j°3iQ Pe\� \� I RAP aT EMBANKMEN o B, � BANK OF NORTN CA LINA 6�3i 9o�y \\ �, �� DB 5�52 PC 0360 +�5 -sevao- �_ �s.�� � W � se . a c �-n, p�� ��� DB 9�50 PG 252 \�� �. �. � OB $Z�JO PG 333 � +04 -SRVRD- 503LT5 6 T Cp� � � � �NSY L CB� A IPES BEFORE DETOUR BRID�� 40' LT A3' LT $T 5 GF � 's /� 40.63' RT �. 042 � � � ONSTRUCTI�JR���tVS L ST Cf' IN PLACE OF CB FRP.ME, \ ,�, TAIL DI CH @ 03% �� E - \ -� �SC�DETAIL BA GRATE, 8 HdOBS� AFT ��15 VE0. REPLACE STEEL _��.��-��.� �4�`�__ Woa�S +34 -5 VR0. -� � N� /y � ss .f TE WI�W F GRRiE,�PQN�OD �`` �''�`^'��`���-- � - 64' RT +23 3R RD � �. o � � P AT EMBA ENT <q,� +80 L �US� � ^% - 53' S � � EX. RNJ � � I BRUSH) \ \ \ K��srwr`-_-- ---- --__- ''��`"r�" '�e �� - . � r 130' �i�76 -L- �� - - �- SPE��' I q�C�g.,�+"4 ;�- RVRD- 5��SRVRD- FVE , . .bETONS CLC ND R/� LT J \ \ �w� �� SPE I L CU D v82r . EST.7i�GF �T _ s 1�63 L- �84 -d ` \ \ �� � \ � 67.50' L7 � / G tn � wz- � TAIL F I� 35 L- � eg�s" + RVRD °6 751' LT 148' LT CL 8 RIP RAP 115' LT � / +27 -SRVRD- � _ ...IMAL 69' "`q..\�d f�' � z.� 160' LT 153' LT AT OUTLET � � � �� \ O __� +79 -L-BST � � � � � - .'� �\46.87 � � � � - / 17'RT 13`B"T7 �. Y� , , ' - �� ex. ww - --- P P _� � .�'�"'�",�'"�'''�,,, � � il5'av __ �i"�, A � 4R���q �o�� DET -��'Z,��� ° -DET2-�OT s rnan s„� -az � � � �9 c � ` �� � °� E +�s -i- oi � � WOODS �'-`'�N' \ S!O. II V , O7 �}- 5 EX. ' - _ �oTol � - . ES � l4 \ ON �� � BEGII�l CONST. 123' RT + � ' � ,� ` x ww _ � - � +oo � z�::eo��;:is� � IN �' • �,_`^ � -� � � R,w T� S��N w � �-w �( EX. a� i 4 aT 4s, 2cmr� �.riAi - -- -�ET M � . . R� " PV _ _ _ LNK )W " ' � B� � Exsr N� ,� � pW _�� - iEM - REMO�E- - - _ \ O - -- ^FTAI- 15 RC --O \ M - 9 . = r � �� � _.. _ _� z _a � 6„ � « � - RI RAP DI� � d_ P RIP RAP � 6/ 3 p. . .&' �EM�_ L � . - -. \2 � M!i � � � "" . - - -- - f.. _ _ .. . . _ _ . . _ � -�x � C T�.F q � � i � � - -'-'-'_- i C9 �v , �a A i � B5 �� 7 R -IV /-�--C ._,� � � \s� \"i �Q� _ , SOQQ6�- '�� � � r� o �. �, r r F� A - - � _ � -- -;n�29 SB- - � F46'B5T � D n -- ---_ �/ REI�OVE OAO � � Zllv - � z \ \\L -- 5�--- S6-'SO - � IS"RCP • --�R�P RA -'-- - - CONC SLAH - _- SD_ - - - 5O - 50 - � � 50 0 _ T -e i - - _ -- - - _ - 31ZRF�-- TL T =C - (75 29 NBL 24'B57 - REMOVE �\ '�'J Qq� \\ /S 29 NBL _ _ 46q;� BSI' _ II � _ _ _ _ _ _ _ _ wU5 29 NBL _ _ _ _ _ _ _ 040 ° F 0.14'(R E� c � � � �) - - - - - - f �o_ - _ _ - - r ro- - - - -�' s �%ze_ � ;; -�,��� g�.'�a--- ��-g-� �r - � ,'�"�`� QA6� POLC 2GI 0. � � -- ���' ��� �° ie oiP ie° aca iv � � - � � - � -- � --sa_ -� � � So 9e°a� �ce _ � Rn� ' _ � _ � - _ - o � � � � �- �� - ���?� ? ? M�e� ��z� � ie� oiP "�t G� � � -e� ��v� �--� � � �; ��� 0h �� � �cuv�"'� io'BM°� � � g . -� ��--- 9 _ � N� Ly�Dlh NLc� -x-x + eernw ',�c °o, �� ur�� - � - ��cur, - - - - - - - �� � � = � , ae,�ove � \s +, \ J � Bo��oE a � ��� so -�- - �, Fa� � c'�'6 \FIBER OPiIC '+24 -L- ,o ^ +17 L 135, +74 -L- � \�\ O \ \ARKCR I EX. RNJ / GF. G� EX. WW �Q _�_l. R7 � � T S� � +35 �_ +64 -L- 92' RT �147' R \ CMARLOTTE 40TOR $PEEDWAY LLC � � 6qp t35% i I /� / 135' KT � y �� . � CL �/RIP� P EX. RNJ +71 -L- �t DB 5�52 Pp 0%g �� � ( 90' m w� � � OB 5290 C � � � �/ e , +a� -�- ve i c f�1 rc-ri Y�� � sr 1oN �+qy � � / �,0` .� �0 135' RY SEE D TP. ,Y72' RT � �/E5T l0 GF � \\ \\ ` � / A GP // j �7�N � 135'RT �� TAIL H@ 0.3% r�,� W OD� 0 '�j,/ � / � SEE DETAIL B4' \� I \ O \ / � / G� �/ F ,� F / '" �� +g_ \ � / � RIPRAP k EMBANKME�� el.� \ � A ��/ +35 LS VRD � � � + \ \ . 90 -5 RD- , /e' / 2byRT � �� ��E DETAIL ��� � 1 �\ / . GF 0 � q � EST.6�TON5 CL �� os �r � • / `�� � w000s �sr. � s F \�s�. � +61�-SRVR0. '�(�� / // +3 LT V�iD- RIPRAP AT �BANK ENT � o�� RT � �� � r� �E DETA�I� C } EST. TONS L B E5T.11 SY F = ��F � � � /� ' ���. � f� -5 � ��� Sto.�+5528 +� � � / ' F � � � ������i esr z roNS °w �� qa° W Sio. 20 "w' Iv 0 � NO`� I �, -�+ �F `z 2 e�ai�e Ev ve �g�i o�o �uave� � � •�s a END CONST. � O ��C354 � E 59.0 rPV =M 8.98" �,\ \ . �P -1� °6, � � ; s P�F +oo -�- BRU_ R� �s. 7°38' .' W 81' LT �% , 5 �,�: R��`�F� � C zs.- e os�� � �R � � W � � � oa,e g w � , c � i � . F : � � �' R o � � T - IY • � / �O � _ z0 ..� f/� EM7 15' . ._ .. _ _ _ w . - _ - � "r - _, - g LLJ -- �?'�'� �� � _ -�- - _ - - -�� - - { N \ 0419 0416 y / u5 2� L . � �, � - � - - --\ � T - - SOIL MEDIAN - �O O _ - - � MTL SD + - - -� �_� - _ ... --�8 �D \\ \� 15" RCP-IV 041 US O4109 � N -� --- 1 .. � Q � - Mr�ce . a.�_���e>_ �� .��� _ � -�-- N �� \ �g � 15" RCP-IV _ - -� -� , CP-IV� �5`-REP�IV' - -' TS' RC�IY � � ' - DP MTLPOLEw �� -��'�P -- �. E � - - _ - _..... - �'*FY ��. J FIBER OPTI 0 14 ' �uY � o MARKER � E��-g� TE �\ /� I . I�(640. rp gM xi2 x �y � � �'A�r�� �G?rA�%E SPECIAL CUT Z `COf�cCRETPAVE ^3 bUE +13 -L- BACK OF CURB DITC � 82' RT SEE DETAIL E g0 J �� SPFQ�AL � DITC � �A�OAC +7� �- 91' RT `?SEE �I�JErna,. � O�� ro sTa +sa �oa r � LMDA pg.� �M(]072�vGN�2i RUSiEE _ �"�si. 3 cv '� _. p415 P � PUE � PUE PL�1 = BBE�S �TE�AL 'V' DITCH � O I � - W/CL RIP RAP +82 -L- _ SEE DETAIL A SEE D TAIL D � -_ < +42 -L �. +15 -L- i �13�RT .�..p� _�_ < m 135' RT 65 5' RT � ( GRA55 � �qq� R7 +53 -L- � 136' RT 735' RT 148' RT CL II RIP RAP 748' RT � � 148' RT �� � BANK STABILIZATION \ /�\ -L- 5 .2/+1057 � \ - Sto.15+24.77 � �� i > � � j� �= 7 55' 52lJ' � i �/� �� �- i � / � �� - � i �-SRVRD- POT S�O.IB'�'X%Z9 +55 -SRVR0. N \m � �� + 5 as� �r I -DET2- Pl Sto I1+54J6 Pl Sto 13+32.31 Pl Sta �8+52A5 Pl 5/0 20+49.66 p= lT 00' 43.0' fLT1 p= IT 00' 43A' fRTI �_ l8' 52' l5! fRTJ Q= l8' 52' l5! fLT1 D= 9' 32' S75' D= 9' 32' 575' D= 9' 32' S75' D= 9' 32' 575" L= 178J5' L= 178J5' L= 197,62' L=/97,62' T= 89.73' T= 8973' T= 997P T= 997/' R= 600.W' R= 600A0' R= 600A0' R= 600A0' � Q � � � s o_ � 2 M N �, 0 � � Por sro.23+0925 END TlP PROJECT B-5/23 JqY W MORR15. JR DB 286 PG �i, O ws �e� rc ooee 4 0 0 0 0 0 0 �TYF� PWR 011TLET5 tTYP) +97 -L- E%. R/W 6750' LT ..,..,..., ,. � � e �� Gt. � �� �� P_ • - , � . ' � �v......'�a.....��� — �1I�1���_� . �,. �; �,L , , f , - �� � -L- Sto. 28+3027 �R�� � i � �,�NA� � � o �.T oi � � � ' � �� Mr� i�� ANOP � � � � o � O PwR OIJTL I�I � DITCH +00 L- � PWR OIJTLEiS (TYP) EX. � � 64' LT �r�ai I — — — ��� — 9� aav � � GIJY - - - � 0�0 � WWR BOARD NV= 5. I' — W/ METER E � m�� P- Sw.60' � -- �'I"1'.� E we �— � _�N "5i5.OT' 6 --�� 50 � � � � BST VARIES _ - � IJS 29 SB� � ��— � � � � US 29 NBL 501=MEDIAN �� �� — �'-� L =��—�lF�f}y / —r F� w-1�%�� �"'�' L.�—� Sg =— -F '" - i6�� oiP - ���7W aiw - '�— a� � � � � � rv � � � � � � � � \ � � ��Y , • / TS �iYPi � / i / - - - �9 � � _ - - - _ - - - _ / / � � � soi� — — — — i i — �� � DI � -�'__ -"'- _ '_ -- ------w_-i - -- NE - - - - � - - - - - - � -- � — — 4 �' _ � --- -- --_ -_ 0 C J �.� F dEk )r� . .. I MTL J E I�,�HKI I; �2$� �� C +30 -L- - + 5 -L- Z IGN DO NOT � EX RhV � BL-rj 65.50'RT / G� m � � N �93Rr �� �I LINDA� �M�p� ip�N�2�RU5TEE� � Ex�� �p�,p ISTURB �� PUE � � s5r� _ I �� � f � � SPECIAL CUT I`' � J +41 -L- OC j�;`�'' S v BACK OF ¢URB D1TCH �5.50' RT J � � __ SEE DETAIL E �\ S »5' RT / / +Ol -L- ' _ \ y I / Y 136' RT Q � 148' RT 1 �, 1 f � I r � � \ � V 70 -L- OOD¢% WvV as ar A�T PR �Rto� PG p91RTNER CL B RIP RAP ( AT OUTLET ,y EST 2 TONS ` EST 7 SY GF '.� � � o� -L- -DET2- Pl Sio 3/+/9.94 Pl S►a 13+323/ \\ � � � � D = Z �3A. fLT1 p = g ar5 � !RT! \ \ / / pm , L = 575.49' L = 178J5' � � ,� T = 28967' T = 89J3' � � R = 2A40.W' R = 600.(Ji/D' / � / � � ^ � � O � � Q 2� � M '�i �� // E\P � � i � i � i , � / _�'' // ' / / �/// � / / �� g57 VAFIES / / i � / \ � � ai _ q5cr�� \ 5 S�tG�si6 U��/ � a,� t�E�,� _ � Y 3/ � y2 Y �T Fo Ok0 � �7 0 ��TYGB�Y � Q BILLBOAR� ~ GUY ----- -- -' yV00�5 -�� �\ r��� \ s s s�� n � o J � \ \ \ \ \ � \ PROIECT REFERENCE NO. SHEET NO. B-5/23 5 WW SHEET NO. :OADWAY DESIGN HYDR.4ULIC5 ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION FOR —L— PROFILE SEE SHEET 6 FOR —DET2— PROFILE SEE SHEET 7 � a, � � N 0 �L NQD � �Ri 8,3�2 �� S UR VEY C01�TROL SHEET PRELIMII�ARY A., _ pATUM pESCRIPTION THE LOCALIZED COONDINATE SYSTEM DEVEIOPED FON THIS PNpJECT IS BASED ON THE STATE PLANE COORDINATES ESiABLISHEd 8Y NCDOT FOR AqNU1,�NT "85723-�" WITH NAD 83/2001 STATE PLANE GRIU COORDINATES OF NORTHING: 589277.62t�4ti EASTING: t498673.652�4fi ELEVATION: 619.061fT) THE AVERAGE COABINEU GRID FACTOR USED ON TxIS PRWECT IGROUND TO GRIU) IS: 0.9998740 THE N.G LA�IBERT GRID BEARING AND LOCAIIZE� HORIZONTAL GROUND DISTANCE FROM "BSt23-t" TO -L- STATION t0t00.00 IS N 71° 27' 2T" E 902.47' ALL LINEAR DIAENSIONS ARE LOCALIZED xORIZONTAL DISTANCES VENTICAL UATl1M USE� IS NAVU 8B PROJECT REFERENCE NO. B-5123 Location an Po1NT �FSCo NoRTH F�sT E�_�v�TioN i_ sTaT1oN oFFS�T ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 1 B5123-1 58�2170621� 14`�86130652� E7�3o1�� OUTSIDE PROJECI �IM1TS 3 B�-3 58�5130�`�6�i 14��2�4o1�J4� 644073 OUTSIDE PROJECI �IM1TS 4 BL-4 589`�3�0552� 15��384a443� 5�35073 2���804� 43067 �T 5 B�-5 5°�1320538� 15�i1142o596�i 587041 27�86027 5�057 RT � -aMMY 5°����(� � 1 4`�i�� 1. ��? :i 77� � i' i��!� ��`� 1 ��'�4 35 ���' � 61. 7? ., 1 7 RT BM1 E�EVRTION = 63�02� N 58 756�i E 149�3�4 � STRTION 1���� N 53°55'32" W DIST �33 RR SPIKE IN BRSE OF POWER PO�E BM2 E�EVRTION = 587a42 N 58�75� E 150�235 � STRTION 18��1 66 RIGHT RR SPIKE IN BRSE OF POWER POLE �_��������__����_���������������.���.��� BM3 E�EVRTION = 58�0�� N 5���45 E 15���53 � STRTION 25�77 68 RIGH1��� RR SPIKE IN BRSE OF POWEFt PO�E � TYPE STP�TION NORTH ERST POT 1����,�� G895�4,5156 149�469,2733 PC 28-3�io27 59�2P�4,4�48 15�116P�,4828 PT 3�4��5e76 5�7�49oe�427 15�165Ae3927 POI 3��P8o1i 59�55�7,`�539 15�1734�332� NOTE: DRAWING NOT TO SCALE NOTES: 1. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTING PROJECT CONTROL DATA AT: HTTPS✓/CONNECT.NCDOT. GOD/RESO URCES/LOCATION THE FILES TO BE FOUND ARE AS FOLLOWS: B5123_LS_CONTROL.TXT 85123 LS_LOCAL.TXT SHEET NO. 7C-1 2. SITE CALIBRATION INFORMATION HAS NOT BEEN PROVIDED FOR THIS PROJECT.IF FURTHER INFORMATION IS NEEDED,PLEASE CONTACT THE LOCATION AND SURVEYS UNIT. 3. PROJECT CONTROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM, UTILIZING THE NCGS RTN SYSTEM (VRS). MONUMENTS USED OR SET FOR PROJECT CONTROL BY THE NCDOT LOCATION AND SURVEYS UNIT: • ZNDICATES GEODETIC CONTROL MONUMENTS FOR HORIZONTAL CONTROL ■ INDICATES BASELINE MONUMENTS FOR HORIZONTAL PROJECT CONTROL E3 INDICATES BENCHMARKS FOR VERTICAL CONTROL