HomeMy WebLinkAbout20151023 Ver 1_Emails_20151105C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
� Wetlands � Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem ora T
Site 1❑ P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 2� P❑ T Roadway Fill Mountain Bog � Yes � Corps 0.13
� No ❑ DWQ
Site 2 0 P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site ❑ P 0 T ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts 0.13
2h. Comments: There will be 0.01 ac of Hand clearing impacts to the wetland at Site 2 additionally, <0.01 acre oi
Temporar}r Fill in Wetlands in the Hand Clearing areas for erosion control measures.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of Average Impact length
number - (PER) or jurisdiction stream (linear feet)
Permanent (P) or intermittent (Corps - 404, 10 width
Temporary (T) (INT)? DWQ — non-404, (feet)
other)
Site 1� P❑ T Bank Pine Creek � PER � Corps 5�
Stabilization ❑ INT � DWQ
Site 1❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 2❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site 3� P❑ T Stream UT to Pine Creek � PER � Corps 10
Relocation ❑ INT � DWQ
Site 4❑ P� T Dewatering UT to Pine Creek � PER � Corps 20
❑ INT � DWQ
Site 5❑ P 0 T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h. Total stream and tributary impacts 67 Perm
20 Temp
3i. Comments: