Loading...
HomeMy WebLinkAbout20151023 Ver 1_Emails_20151105C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): � Wetlands � Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Tem ora T Site 1❑ P � T ❑ Yes ❑ Corps ❑ No ❑ DWQ Site 2� P❑ T Roadway Fill Mountain Bog � Yes � Corps 0.13 � No ❑ DWQ Site 2 0 P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ Site ❑ P 0 T ❑ Yes ❑ Corps ❑ No ❑ DWQ Site ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 0.13 2h. Comments: There will be 0.01 ac of Hand clearing impacts to the wetland at Site 2 additionally, <0.01 acre oi Temporar}r Fill in Wetlands in the Hand Clearing areas for erosion control measures. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of Average Impact length number - (PER) or jurisdiction stream (linear feet) Permanent (P) or intermittent (Corps - 404, 10 width Temporary (T) (INT)? DWQ — non-404, (feet) other) Site 1� P❑ T Bank Pine Creek � PER � Corps 5� Stabilization ❑ INT � DWQ Site 1❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 2❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 3� P❑ T Stream UT to Pine Creek � PER � Corps 10 Relocation ❑ INT � DWQ Site 4❑ P� T Dewatering UT to Pine Creek � PER � Corps 20 ❑ INT � DWQ Site 5❑ P 0 T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 67 Perm 20 Temp 3i. Comments: