HomeMy WebLinkAbout20150205 Ver 1_Approval Letter_20151106Pat McCrory
Governor
North Carolina Department of Environmental Quality
Donald R. van der Vaart
Secretary
November 6, 2015
Dare County
NCDWR Project No. 20150205 v.2
Bridge 17 on South Dogwood Trail
TIP No. B-5417
REISSUANCE of APPROVAL of 40l WATER QUALITY CERTIFICATION with ADDITIOIYAL
CONDITIONS
Rachel Patrick, Public Works Director
Town of Southern Shores
5375 N. Virginia Dare Trail
Southern Shores, NC 27949
Dear Ms. Patrick:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
replacing Bridge iJo. 1 i oii South Dogwood Trail over Snow Goose Canal in Dare Coanty:
Site
SI
S2
TOTAL
Stream Impacts in the Pasquotank River Basin
Open Water �ermar�ent �'ill Tcmporary � �11 in
in Perennial l'erennial Stream
(ac) Stream I i
- I - 82
0.013 � 9 �
0.013 91
Total Stream Impact for Project: 91 linear feet.
The project shall be constructed in accordance with your application dated received February 20, 2015. After
reviewing your application, we have decided that these impacts are covered by General Water Quality Certification
Numbers 3883 and 3884. These certifications correspond to the Nationwide Permits 3 and 12 respectively issued by
the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed
with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply
Watershed regulations. This approval will expire with the accompanying 404 permit.
This approval is valid solely for the purpose and design described in your application (unless modified below).
Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the
new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying
with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total
impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the
conditi�ns li�ted in the attacried cer�ificati�n(s) and any addiiional conditions li5te a belo�y.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Phone: 919-807-63001 Internet: www.nctlenr.gov
An Equal Opportunity 1 Affirmative Action Employer
Condition(s) of Certitication:
Project Specific Conditions
1. The post-construction removal of any temporary bridge structures must return the project site to its
preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native
species. [15A NCAC 02H .0506(b)(2)]
2. As a condition of this 401 Water Quality Certificaiion, the bridge demolition and construction must be
accomplished in strict compliance with the most recent version of NCDOT's Best Management Practices
for Construction and Maintenance Activities. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H
.0506(b)(5)]
3. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the
bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated
buffers, etc.) before entering the stream. Please refer to the most current version of Stormwater Best
Management Practices. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)]
4. Bridge piles and bents shall be constructed using driven piles (hammer or vibratory) or drilled shaft
construction methods. More specifically, jetting or other methods of pile driving are prohibited without prior
written approval from the NCDWR first. [15A NCAC 02H.0506(b)(2)]
5. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface
waters. This water shall be captured, treated, and disposed of properly. [15A NCAC 02H .0506(b)(3)]
6. A turbidity curtain will be installed in the stream if driving or drilling activities occur within the stream
channel, on the stream bank, or within 5 feet of the top of bank. This condition can be waived with prior
approval from the NCDWR. [15A NCAC 02H .0506(b)(3)]
7. All bridge construction shall be performed from the existing bridge, temporary work bridges, temporary
causeways, or floating or sunken barges. If work conditions require barges, they shall be floated into
pos?tion and ther, sunk: The barges shall net be sunk an�i rhen dragged into pasitior.. [_inder no
circumstances should barges be dragged along the bottom of the surface water. [15A NCAC 02H
.0506(b)(3)]
8. The permittee will need to adhere to all appropriate in-water work moratoria (including the use of pile
driving or vibration techniques) prescribed by the National Marine Fisheries Service and/or the North
Carolina Wildlife Resources Commission. No in-water work is permitted between February 15 and
September 30 of any year, without prior approval from the National Marine Fisheries Service and/or the
North Carolina Wildlife Resources Commission. ln addition, the permittee shall conform to the NCDOT
policy entitled "Stream Crossing Guidelines for Anadromous Fish Passage (May 12, 1997) at all times.
[ � sa Ncac o2H .oso6ro�(2��
9. Adherence to The Guidelines for Avoiding /mpacts to the West lndian Manatee: Precautionary Measures
for Construction Activities in North Carolina Waters will be required throughout construction. [ 15A NCAC
02H .0506(b)(2)]
General Conditions
10. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact
between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be
discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills.
[15A NCAC 02BA200]
11. During the construction of the project, no staging of equipmeat of any kind is permitted in waters of tne
U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)]
l2. The dimension, pattzrn and profile of the stream above and below the crossing shall nct be modified.
Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC
02H.0506(b)(2)]
13. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream
stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life
passage. [15A NCAC 02H.0506(b)(2)]
14. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approvaL [15A NCAC 02H .0507(c) and l5A NCAC 02H .0506 (b)(2) and (c)(2)]
15. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce ihe introduction of other pollutants into the stream. [15A NCAC �2HA�06(b)(3)]
16. All mechanized equipment operated near surface waters must be regularly inspected and maintair.ed to prever.t
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC
02H.0506(b)(3)]
l7. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
certitication. [15A NCAC 02H.0506(b)(3)]
18. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface
waters is prohibited. [15A NCAC 02H.0506(b)(3)]
19. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water
quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act)
and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards
or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal
law is being violated, or that further conditions are necessary to assure compliance, the NCD WR may reevaluate
and modify this certification. [15A NCAC 02B.0200]
20. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition,
the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division
Engineer and the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and
(c)(21]
21. The outside buffer, wetland or water boundary located within the construction corridor approved by this
authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts
to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC
02H.0501 and .0502]
22. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal)
having jurisdiction, including but not limited to applicable buffer rules, stonnwater management rules, soil
erosion and sedimentation cantrol requi:ements, etc.
23. The Permittee shall report any violations of this certification to the Division of Water Resources within 24
hours of discovery. [15A NCAC 02B.0506(b)(2)]
24. Upon completion of the�project (including any impacts at associated borrow or waste sites), an authorized agent
shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all
work included in the 401 Certification has been completed. [15A NCAC 02H.0502(fl]
25. Native riparian vegetation must be reestablished in the riparian areas within the construction limits ofthe project
by the end of the growing season following completion of construction. [ 15A NCAC 02B.0506(c)(3)]
26. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this
permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow
sites, be located in ��etiantls ar streams, compensator� mitigation wiil be required since that is a direct impact
from road construction activities.[15A NCAC 02H.0506(b)(3) and (c)(3)]
27. Erosion and sediment control practices must be in fi�ll compliance with all specifications governing the proper
design, installation and operation and maintenance of such Best Management Practices in order to protect
surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3]:
a. The erosion and sediment control measures for the project must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Sediment and
Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures
must be such that they equal, or exceed, the requirements specified in the most recent version of the
North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all
construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned ar leased
borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina Surface
Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance
with the requirements of the Sedimentation Pollution Control Act.
28. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved
by this Certification. [15A NCAC 02H.0506(b)(3) and (c)(3)]
[f you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition
with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except
for official state holidays. The original and one (1) copy ofthe petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 2?699-67?4
Telephone: (919) 431-3000, Facsimile: (919) 431-3100
A copy of the petition must also be served on DEQ as follows:
Mr. Sam M.Hayes, General Counsel
Department of Environmental Quality
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 40l of the Clean Water Act. If you
have any questions, please contact Garcy Ward at (252) 948-3917 or Garcy.Ward@ncdenr.gov.
Sincerely,
��'
�
S. ay Zimmerman, Director
Division of Water Resources
Electronic copy on(y distribution:
Tracey Wheeler, US Army Corps of Engineers, Washington Field Office
Travis Wilson, NC Wildlife Resources Commission
Greg Daisey. NC Division of Coasta] Management
Cathy Brittingham, NC Division of Coastal Management
Garcy Ward, NC Division of Water Resources Washington Regional Office
File Copy
North Carolina Department of Environmental Quality
Pat McCrory
Governor
NCDWR Project No.:
Applicant:
Project Name:
Date of [ssuance of 40l Water Quality Certification:
county:
Donald R. van der Vaart
Secretary
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 40l Transportation Permitting
Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form
may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certifcation
I, � , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Date:
��EYtt'S �°Yll�r_'[llllll
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature:
Engineer's Certifcation
Partial Final
Date:
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 40l
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Phone: 919-807-63001 Internet: www.nctlenr.gov
An Equal Opportunity \ Affirmative Action Employer