Loading...
HomeMy WebLinkAbout20151158 Ver 1_Application_20151104iransportatian November 3, 2015 Mr. Tom Steffens NCDOT Coordinator Washington Regulatory Field Office U. S. Army Corps of Engineers 2407 W Sth Street Washington, NC 27889-1000 Dear Sirs: PRT McCRC7RY Covernor N[CHQ�.AS J. TEI'JNYSQN Secretary Mr. Stephen Lane NCDOT Coordinator N.C. Dept. of Environmental Quality Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Subject: Application for Section 10 and Section 404 Nationwide Permits (NWP) 23 and 12, Section 401 Water Quality Certification, Tar-Pamlico Riparian Buffer Authorization and CAMA General Permit for the replacement of Bridge No. 55 over Pantego Creek on US 264 in Pantego, Beaufort County; TIP B-5300; Federal Aid Project No. BRST-0264(53); Debit $400 from WBS 46000.1.1. The North Carolina Department of Transportation (NCDOT) proposes to replace existing Bridge No. 55 over Pantego Creek on US 264 in Pantego in Beaufort County. The project involves replacement of the existing 75-foot bridge and approaches with a new 95-foot double span bridge. The approach roadway will extend approximately 230 feet from the southern end of the new bridge and 174 feet from the northern end of the new bridge. The bridge will be crowned with a 2.5% cross-slope, with 12' travel lanes and 2'-3"shoulders and 5'-6" sidewalks, 28'-6" clear width and 42' (OTO width). Please see enclosed copies of the Pre-Construction Notification (PCN), Preliminary Jurisdictional Determination Form, permit drawings, buffer drawings, utility drawings, stormwater management plan, and roadway plans for the project. A Programmatic Categorical Exclusion (PCE) was completed for this project on October 31, 2014 and distributed shortly thereafter. This project calls for a letting date of March 15, 2016 and a review date of January 26, 2016; however, the let date may advance as additional funding becomes available. Project construction will require less 0.01 acre of permanent impact to surface water for placement of proposed bridge piers, and 0.01 acre of temporary impact for removal of existing piers. No impact to wetlands are anticipated. Bridge construction will also have allowable riparian buffer impact to 2,956 sq. ft. in Zone 1 and 2,174 sq. ft. in Zone 2. Utility work will require 0.04 acre of hand clearing in wetlands and allowable impacts to 1,551 sq. ft. of buffers in Zone 1 and 886 sq. ft. in Zone 2 associated with power poles and powerlines. �Nathing Car�pares�_ State of North Carolina � Department of Transportation � Project Development and Environmental Analysis Unit 1020 Birch Ridge Drive I 1598 Mail Service Ceuter � Raleigh, NC 27699-159$ 919-707-6000 T Regulatory Approvals Section 404 Permit: All aspects of this project are being processed by the Federal Highway Administration as a"Categorical Exclusion" in accordance with 23 CFR 771.115(b). The NCDOT requests that the project be authorized by NW 23 for bridge construction. We are requesting issuance ofNW 12 for utility relocations resulting from project construction. Section 401 Permit: We anticipate 401 General Certification numbers 3891 and 3884 will apply to this project. Tar-Pamlico Riparian Buffer Authorization will also be needed for impact to riparian buffers. Coastal Area Management Act: We further anticipate that the project qualifies for approval by the N.C. Division of Coastal Management under the General Permit for Replacement of Existing Bridges and Culverts. A copy of this permit application and its distribution list will be posted on the NCDOT Website at https://connect.ncdot.gov/resources/Environmental/Pages/default.aspx, under Quick Links > Permit Applications. A copy of the PCE is also available at the above website address under Quick Links > Environmental Documents. Thank you for your assistance with this project. If you have any questions or need additional information, please contact Gordon Cashin at (919) 707-6107. Sincerely, __ _ __._., _._. _ __._ �----�"_7 J Richard W. Hancock, P.E., Manager Project Development and Environmental Analysis Unit cc NCDOT Permit Application Standard Distribution List. �o� vvArE�,� Office Use Only: � � 4 � Corps action ID no. i�. � i � r DWQ project no. ° � Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: � Section 404 Permit � Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 23 &12 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No 1d. Type(s) of approval sought from the DWQ (check all that apply): � 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express � Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes � No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h � Yes ❑ No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? � Yes ❑ No 2. Project Information 2a. Name of project: Replacement of Bridge 55 over Pantego Creek on US 264 2b. County: Beaufort 2c. Nearest municipality / town: Pantego 2d. Subdivision name: not applicable 2e. NCDOT only, T.I.P. or state g_5300 project no: 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if not applicable applicable): 3d. Street address: 1598 Mail Service Center 3e. City, state, zip: Raleigh, NC 27699-1598 3f. Telephone no.: (919) 707-6107 3g. Fax no.: (919) 431-2002 3h. Email address: gcashin@ncdot.gov 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: not applicable 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): not applicable 1 b. Site coordinates (in decimal degrees): Latitude: 35.587494 Longitude: -76.662776 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 6.01 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Pantego Creek proposed project: 2b. Water Quality Classification of nearest receiving water: upstream: C, SW; downstream SC, NSW 2c. River basin: Tar Pamlico River Basin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Residential, urbanized, some forested 3b. List the total estimated acreage of all existing wetlands on the property 0.30 acre. 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 380 feet 3d. Explain the purpose of the proposed project: To replace a structurally deficient bridge. 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves replacing a 75-foot bridge with a 95-foot bridge on the existing alignment with an off-site detour. Standard road building equipment, such as trucks, dozers, and cranes will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained fo�r this property / � Yes � No ❑ Unknown project (including all prior phases) in the past. Comments: Requesting a preliminary JD at permitting 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: NCDOT Name (if known): Gordon Cashin, Tyler Stanton Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � No 6b. If yes, explain. C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): � Wetlands � Streams - tributaries � Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Tem orar T Site 1❑ P � T ❑ Yes ❑ Corps ❑ No ❑ DWQ Site 1❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ Site 3❑ P � T ❑ Yes ❑ Corps ❑ No ❑ DWQ Site 4❑ P � T ❑ Yes ❑ Corps ❑ No ❑ DWQ Site 5❑ P � T ❑ Yes ❑ Corps ❑ No ❑ DWQ Site 6❑ P � T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 0.0 Perm. 0.0 Temporary 2h. Comments: 0.04 acre of wetlands will be handcleared for a utility power pole. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of Average �mpact length number - (PER) or jurisdiction stream (linear feet) Permanent (P) or intermittent (Corps - 404, 10 width Temporary (T) (INT)? DWQ — non-404, (feet) other) Site 1❑ P� T Bridge pier Pantego Creek � PER � Corps 60 0.01 ac removal ❑ INT � DWQ Site 1� P � T New bridge Pantego Creek � PER � Corps 60 <0.01 ac piers ❑ INT � DWQ Site 3❑ P � T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 4❑ P � T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 5❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 6❑ P 0 T ❑ PER ❑ Corps ❑ INT ❑ DWQ <0.01 Perm 3h. Total stream and tributary impacts 0.01 Temp 3i. Comments: 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number— waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) or (if applicable) Temporary T 01 ❑P�T 02 ❑POT 03 ❑P�T 04 ❑P�T 4f. Total open water impacts 0.0 Permanent 0.0 Temporary 4g. Comments: 5. Pond or Lake Construction If pond or lake construction roposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Excavat Flooded Filled ed Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer im acts below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form. 6a. ❑ Neuse � Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Tem orar T) re uired? B1 � P❑ T Bridge Pantego Creek � Nos 2956 2174 B2 ❑ P� T Power lines Pantego Creek � NoS 1551 886 B3 ❑P❑T ❑Yes ❑ No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed bridge is longer than the existing bridge with fewer spans; the proposed bridge will be at approximately the same grade as the existing structure; an off site detour will be used. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Best Management Practices for the Protection of Surface Waters and Design Guidelines for Sensitive Watersheds will be implemented. An in-water work moratorium will be observed from February 15th to June 30t". Construction activities will adhere to guidelines outlined in Precautions for Construction in Areas Which May Be Used by the West Indian Manatee in North Carolina (2003 USFWS). 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes � No impacts to Waters of the U.S. or Waters of the State? If no, explain: Due to the minimal amount of impacts, com ensato miti ation is not ro osed. 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? ❑ Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: not applicable 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. � Yes ❑ No Comments: 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? N/A 2b. Does this project require a Stormwater Management Plan? � Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: See attached permit drawings. ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program � DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? not applicable ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Pro ram Review ❑ Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ❑ HQW (check all that apply): ❑ ORW ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No N/A 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No N/A F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State � Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) � Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes additional development, which could impact nearby downstream water quality? � No 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable 10 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or � Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act � Yes ❑ No impacts? � Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS County Site, NC Natural Heritage site 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes � No status (e.g., Nationai Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA Documentation 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA Maps 7 -� Richard Hancock �_, �°���� � � �:% ` ��.� ApplicanUAgenYs Printed Name �� qpplicant/Agent's Signature Date (AgenYs signature is valid only if an authorization letter from the applicant is rovided. 11 DCM MP-1 APPLICATION for � Ma�or Deuelopment Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicanf/ Landowner Information Business Name Project Name (if applicable) North Carolina Department Of Transportation (Ncdot) B-5300 Applicant 1: First Name MI Last Name Richard W Hancock Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 1598 Mail Service Center Raleigh NC ZIP Country Phone No. FAX No. 27699 1598 919 - 707 - 6107 ext. - - Street Address (if different from above) City State ZIP Email gcashin@ncdot.gov 2. Agent/Contractor Information Business Name Agent/ Contractor 1: First Name MI Last Name AgenU Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 Phone No. 2 - - ext. - - ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Beaufort Bridge B-5300 on US 264 US 264 Subdivision Name City State Zip Pantego NC - Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. , , , , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Tar-Pamlico Pantego Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural �Manmade ❑Unknown Pantego Creek e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed �Yes ❑No work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 80 LF 21,780.00 sq. ft. c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal waterlevel) (If many lot sizes, please attach additional page with a list) +/- 3' �NHW or �NWL e. Vegetation on tract Brushy/woody vegetation on the over banks. f. Man-made features and uses now on tract Existing US 264 g. Identify and describe the existing land uses adlacent to the proposed project site. Northeast, northwest and southwest quadrants have local business, southeast quadrant has woods and brushes. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, if applicable) ❑Yes ❑No �NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes �No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes �No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes �No ❑NA National Register listed or eligible property? <Form continues on next page> Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? �Yes ❑No (ii) Are there coastal wetlands on the site? ❑Yes �No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? �Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. N/A o. Describe existing drinking water supply source. N/A p. Describe existing storm water management or treatment systems. N/A 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial �Public/Government ❑ Private/Commu nity b. Give a brief description of purpose, use, and daily operations of the project when complete. The existing six span 75' bridge is being replaced with a proposed 95' double span cored slab structure. The bridge will be crowned with 2.5% cross-slope, with 12' travel lanes and 2'-3" shoulders and 5'-6" sidewalks, 28'-6" Clear Width and 42' (OTO Width). Existing drainage patterns are being maintained. Runoff is being discharged as far away from the stream as practicable. No deck drains required. Drainage inlets have been added to minimize flow from the roadway onto the bridge deck. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The proposed bridge will be composed of pre-cast cored slab segments which will be delivered to the site by truck and will be placed by crane. d. List all development activities you propose. Replace bridge and grade roadway approaches and shoulders. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 0.5 ❑Sq.Ft or �Acres g. Will the proposed project encroach on any public easement, public accessway or other area �Yes ❑No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. The proposed inlets will collect water from the roadway and discharge into Pantego Creek. i. Will wastewater or stormwater be discharged into a wetland? ❑Yes �No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No �NA j. Is there any mitigation proposed? ❑Yes �No ❑NA If yes, attach a mitigation proposal. <Form continues on back> Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additionallnformation In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) —(� are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already compiete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Phone No. Address Name Phone No. Address Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and foilow-up monitoring of the project. I further certif that the information provided in this application is truthful to the best of my knowledge. Date l� `� ZO \ Print Name M� 5• ��YY�S .L1L Signature � �� 'taP ���.� ���� Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information �DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information I�' ;`-'. <� . $ � ? �Z,i ._- 5, ,., e z . � �., .. , _� .. ;: S a r � . ' .;: c tT �. , . . . _ . _ ; a . . :. , r �. . x t i :f tf 4 i _ t 3, e . , . , . Form DCM MP-5 BRIDGESand CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. BRIDGES ❑This section not applicable a. Is the proposed bridge: ❑Commercial �Public/Government ❑Private/Community c. Type of bridge (construction material): Concrete Cored Slab e. (i) Will proposed bridge replace an existing bridge? �Yes ❑No If yes, (ii) Length of existing bridge: 75 (iii) Width of existing bridge: 28.4 (iv) Navigation clearance underneath existing bridge: NA (v) Will all, or a part of, the existing bridge be removed? (Explain) Existing bridge will be completely removed. 9• Length of proposed bridge: 95' i. Will the proposed bridge affect existing water flow? ❑Yes �No If yes, explain: k. Navigation clearance underneath proposed bridge: NA b. Water body to be crossed by bridge: Pantego Creek d. Water depth at the proposed crossing at NLW or NWL: +/- 10' at NLW f. (i) Will proposed bridge replace an existing culvert? ❑Yes �No If yes, (ii) Length of existing culvert: (iii) Width of existing culvert: (iv) Height of the top of the existing culvert above the NHW or NWL: (v) Will all, or a part of, the existing culvert be removed? (Explain) h• Width of proposed bridge: 42' j. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? ❑Yes �No If yes, explain: I. Have you contacted the U.S. Coast Guard concerning their approval? �Yes ❑No If yes, explain: Advance Approval requested September 10, 2015 m. Will the proposed bridge cross wetlands containing no navigable n. Height of proposed bridge above wetlands: NA waters? ❑Yes �No If yes, explain: 2. CULVERTS �This section not applicable a� Number of culverts proposed: b. Water body in which the culvert is to be placed: c. Type of culvert (construction material): d. (i) Will proposed culvert replace an existing bridge? < Form continues on back> ❑Yes ❑No If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: _ (v) Will all, or a part of, the existing bridge be removed? (Explain) f� Length of proposed culvert: e. (i) Will proposed culvert replace an existing culvert? ❑Yes ❑No If yes, (ii) Length of existing culvert(s): (iii) Width of existing culvert(s): (iv) Height of the top of the existing culvert above the NHW or NWL: (v) Will all, or a part of, the existing culvert be removed? (Explain) 9� Width of proposed culvert: h. Height of the top of the proposed culvert above the NHW or NWL. i. Depth of culvert to be buried below existing bottom contour. j. Will the proposed culvert affect navigation by reducing or k. Will the proposed culvert affect existing water flow? increasing the existing navigable opening? ❑Yes ❑No ❑Yes ❑No If yes, explain: If yes, explain: 3. EXCAVATION and FILL ❑This section not applicable -� c. (i) Will the placement of the proposed bridge or culvert require any excavation below the NHW or NWL? ❑Yes �No If yes, (ii) Avg. length of area to be excavated: (iii) Avg. width of area to be excavated: (iv) Avg. depth of area to be excavated: (v) Amount of material to be excavated in cubic yards: (i) Will the placement of the proposed bridge or culvert require any high-ground excavation? ❑Yes �No If yes, (ii) Avg. length of area to be excavated: (iii) Avg. width of area to be excavated: (iv) Avg. depth of area to be excavated: (v) Amount of material to be excavated in cubic yards: b. (i) Will the placement of the proposed bridge or culvert require any excavation within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL �None (ii) Describe the purpose of the excavation in these areas: d e 7 If the placement of the bridge or culvert involves any excavation, please complete the following: (i) Location of the spoil disposal area: (ii) Dimensions of the spoil disposal area: (iii) Do you claim title to the disposal area? ❑Yes ❑No (Ifno, attach a lettergranting permission from the owner.) (iv) Will the disposal area be available for future maintenance? ❑Yes ❑No (v) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell bottom (SB)? ❑CW ❑SAV ❑WL ❑SB ❑None If any boxes are checked, give dimensions if different from (ii) above. (vi) Does the disposal area include any area below the NHW or NWL? ?❑Yes ❑No If yes, give dimensions if different from (ii) above. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed below NHW or NWL? ❑Yes �No If yes, (ii) Avg. length of area to be filled: (iii) Avg. width of area to be filled: (iv) Purpose of fill: (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high-ground? ❑Yes �No If yes, (ii) Avg. length of area to be filled: (iii) Avg. width of area to be filled: (iv) Purpose of fill: 4. GENERAL a Will the proposed project require the relocation of any existing utility lines? �Yes ❑No If yes, explain: See attached utilty narrative If this portion of the proposed project has already received approval from local authorities, p/ease attach a copy of the approval or certification. f. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL �None (ii) Describe the purpose of the excavation in these areas: b. Will the proposed project require the construction of any temporary detour structures? ❑Yes �No If yes, explain: < Form continues on back> �°���� ��°'� �..� ��3���r��� ��a� ��'�a��.�<��•�:�, ����� � aa� �� c. Will the proposed project require any work channels? d. How will excavated or fill material be kept on site and erosion ❑Yes �No controlled? If yes, complete Form DCM-MP-2. NA e. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? g. Will the placement of the proposed bridge or culvert require any shoreline stabilization? ❑Yes �No If yes, complete form MP-2, Section 3 for Shoreline Stabilization only. 11' .{ � "t.v l� Date _�3p� f. Will wetlands be crossed in transporting equipment to project site? ❑Yes �No If yes, explain steps that will be taken to avoid or minimize environmental impacts. Project Name NCA�T ' ant Name `��. ` , w—' ��,�/� frh Co t�1G Applicant S nature s...}c.: .,� �.. , s,°.��i� , ? ..=��;i, ; -;:_. ! t.tr'�. , .r�;��,:��;; at3� 83e�a.-i� , , .�.i��_ ? . _..::ti�< �a> �::�;.�Ks PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: Gordon Cashin, NCDOT, 1598 Mail Service Center, Raleigh, NC 27699-1598 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: CESAW-RG-L D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: TIP: B-5300 Description: Replace Bridge No. 55 over Pantego Creek on US 264 (USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES) State: NC County/parish/borough: Beaufort City: Pantego Center coordinates of site (lat/long in degree decimal format): Lat 35.587606 Long. -76.662696 Universal Transverse Mercator: NA Name of nearest waterbody: Pantego Creek Identify (estimate) amount of waters in the review area: Non-wetland waters: See table, linear feet: 200 Cowardin Class: Riverine Stream Flow: Perennial Wetlands: 0.30 acres. Cowardin Class: Forested Name of any water bodies on the site that have been identified as Section 10 waters: Tidal: Pantego Creek Non-Tidal: Pantego Creek, upstream of the bridge E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination Date: ❑ Field Determination Date(s): 1. The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre-construction notification" (PCN), or requests verification for a non-reporting NWP or other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD, which does not make an official determination of jurisdictional waters; (2) that the applicant has the option to request an approved JD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions; (3) that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicant's acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal, jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable. This preliminary JD finds that there "may be"waters of the United States on the subject project site, and identifies all aquatic features on the site that could be affected by the proposed activity, based on the following information: � SUPPORTING DATA: Data reviewed for preliminary JD (check all that apply - checked items should be included in case file and, where checked and requested, appropriately reference sources below): ❑ Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant ❑ Data sheets prepared/submitted by or on behalf of the applicant/consultant ❑ Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps ❑ U.S. Geological Survey map(s). Cite scale & quad name: 1:24000; ❑ USDA Natural Resources Conservation Service Soil Survey Citation: ❑ National wetlands inventory map(s). Cite name: ❑ State/Local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) ❑ Photographs: ❑ Aerial (Name & Date): or ❑ Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: � Other information (please specify): Figure 3 and Tables 5& 6 from the Natural Resources Technical Report showing jurisdictional areas. IMPORTANT NOTE: The information recorded on this form has not necessarilv been verified bv the Corps and should not be relied upon for later iurisdictional determinations. Signature and date of Regulatory Project Manager (REQUIRED) K3 a � � ,3 /S 7 � � Signature and date of '— person requesting preliminary JD (REQUIRED, unless obtaining the signature is impracticable) Estimated Cowardin amount of Site Name Latitude Longitude Class aquatic Class of aquatic resource resource in review area 35.587494 -76.662776 WA oN oW PF01 0.26 acre(s) non-section 10 — wetland 35.587494 -76.662776 WB oN oW PF01 0.03 acre(s) non-section 10 — wetland 35.587494, -76.662776 WC oN oW PSS 0.01 acre(s) non-section10 - wetland Pantego 35.587494 -76.662776 Creek °N °W 200 linear feet section 10 — tidal 35.587494 -76.662776 UT oN oW 95 linear feet non section 10 — non-tidal 35.587494 -76.662776 Excavated oN oW 85 linear feet non-section 10 — non-tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal °N - °W acre(s) section 10 — tidal l ll¢;114�'zl4' North Carolina Department of Transportation � S lcli't� ik vc7 [['Y H ighway Stormwater Prog ram �: STORMWATER MANAGEMENT PLAN '�';•.::_::=� (Version 2.02; Released April 2015) FOR NCDOT PROJECTS WBS Element: 46000.1.1 TIP No.: B-5300 Count (ies : Beaufort Pa e 1 of 1 General Project Information WBS Element: 46000.1.1 TIP Number: B-5300 Project T pe: Brid e Replacement Date: 9/23/2015 NCDOT Contact: Paul Jordan Contractor / Designer: Shirshant Sharma Address: NCDOT Hydraulics Unit Address: Zg01 Yorkmont Road, Suite 100 1590 Mail Service Center Ralei h, NC - 27699-1590 Phone: 919-707-6700 Phone:707-357-5511 Email: pa'ordan ncdot. ov Email: shirshant.sharma amecfw.com CitylTown: Pantego County(ies): Beaufort River Basin s: Tar-Pamlico CAMA Count ? Yes Wetlands within Project Limits? No Pro'ect Description Project Length (lin. miles or feet): 500 ft Surrounding Land Use: Rural Proposed Pro'ect Existin Site Project Built-Upon Area (ac.) 0.5 ac. 0.4 ac. Typical Cross Section Description: (Approach) 2- 12' lanes with Curb and Gutter (Approach) 2- 12' lanes with 2' shoulders LT, 5' shoulder RT (Bridge) (Bridge) 2- 12' lane with 2.25' shoulders and 5.5' sidewalks 2- 13' lanes with 5' Sidewalk Annual Avg Daily Traffic (veh/hr/day): Design/Future: 390 Year: 2014 Existing: 530 Year: 2007 General Project Narrative: The existing six span 75' bridge is being replaced with a proposed 95' double span cored slab structure. The bridge will be crowned with 2.5% cross-slope, with 12' travel lanes (Description of Minimization of Water and 2'-3" shoulders and 5'-6" sidewalks, 28'-6" Clear Width and 42' (OTO Width). Existing drainage patterns are being maintained. Runoff is being discharged as far away from Quality Impacts) the stream as practicable. No deck drains required. Drainage inlets have been added to minimize flow from the roadway onto the bridge deck. Waterbody Information Surface Water Bod 1: Pante o Creek NCDWR Stream Index No.: 29-34-34- 1), 29-34-34- 2 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Class SC Supplemental Classification: Swamp Waters Sw NSW Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: Tar-Pamlico Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A Deck Drains Dischar e Over Water Bod ? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) � � � O N � O C'7 � � c� U' � � � � � � �� � � � � � � �. �r � � � � � � � z � �o ��� � � �� ��-� ��W {�� ��Q v��z ��� ��w ��� ��� � � -�,. ��� � �i t= ff� �4 ��^_ 0 0 � � � •� � � •, See Sheet �A For Index of Sheets See Sheet � B For Conventi onal Symbols THERE IS NO CONTROL OF ACCESS ON THIS PROJECT. � � ����� � ����� ���� ���� ��II ���� ��� �� ��� � ��� LOCA TI011t: REl'LA CE BRIDGE 11t0. SS. O T�ER PAI�TEGO CREEK 01� US 264 TYPE OF WORI�: GRADI11lG, PA VI1�G, DRAI1�lAGE A1�D STR UCTURE WETLAND AND SURFACE WATER IMPACTS PERMIT BEGI N TI P PROJECT 6-5300 y/ I / II � � / / I I � CD S � Q Q < CD � PERMIT DRAWING SHEET 1 OF 5 �� �� NAD 83/NA 2011 ����������� � II A��� �� ��� �.�� �'�� ���.���i�Q�����T Prepared In the Offlce of: HYDRAULICS E11tGI1�lEER GRAPHIC SCALES DESIG11l DATA PROJECT LE11tGTH �, 402 i Stirrup C�eeK Drive. Suite t OOI nfrostructure, Inc. amec Durhom,North Corollno 27703 50 25 0 50 100 '4DT 2017 = 4474 foster NC Englneering F- 9253 NC Geology C-247 ���� ADT 2037 = 7170 LENGTH ROADWAY TIP PROJECT B-5300 = 0.077 MILES wheeler �9 �9138 9-9900 �� o� ���� K = � O % 2012 STANDARD SPECIFICATI011iS �Q �Q PLANS D= 60 % LENGTH STRUCTURE TIP PROJECT B-5300 = 0.018 MILES W. S. HOOD, PE P.E. � a PROJECT ENGINEER SIGNATURE: r,� � 50 25 0 50 100 T= 14 %* RIGHT OF WAY DATE: � o V= 30 MPH TOTAL LENGTH TIP PROJECT B-5300 = 0.095 MILES M,o,RCH 20, 2015 BRAD TRIPP, PE ROADWAY DESIG11t a * — 0 — O PROJECT DESIGN ENGINEER E11tGI1�EER ��� Q�Q PROFILE HORIZONTAL � ��p Qo TTST — 8/o DUAL — 6/o �' o D��� �' 10 5 0 10 20 FUNC CLASS = ARTERIAL LETTIIIIG DATE: GARY LOVERING, PE SUBREGIONAL TIER MARCH 15, 2016 PROJECT ENGINEER PROFILE (VERTICAL) NCDOT ROADWAY DESIGN P.E. SIGNATURE: � r 0 N � O C'7 � � � � r 0 N � O C'7 � � � � � � O N � O C'7 � � c� U' � � � � � � �� � � � � � � �. �r � � � � � � � z � �o ��� � � �� ��-� ��W {�� ��Q v��z ��� ��w ��� ��� � � -�,. ��� � �i t= ff� �4 ��^_ 0 0 � � � • � � � •, See Sheet �A For Index of Sheets See Sheet � B For Conventi onal Symbols THERE IS NO CONTROL OF ACCESS ON THIS PROJECT. � � ����� � ����� ���� ���� ��II ���� ��� �� ��� � ��� LOCA TI011t: REl'LA CE BRIDGE 11t0. SS. O T�ER PAI�TEGO CREEK 01� US 264 TYPE OF WORI�: GRADI11lG, PA VI1�G, DRAI1�lAGE A1�D STR UCTURE BUFFER IMPACTS PERMITS BEGI N TI P PROJECT 6-5300 y/ I / II � � / / I I � CD S � Q Q < CD � Buffer Drawing Sheet 1 of 5 �� �• � � � ����������� � II A��� �� ��� �.�� �'�� ���.���i�Q�����T Prepared In the Offlce of: HYDRAULICS E11tGI1�lEER GRAPHIC SCALES DESIG11l DATA PROJECT LE11tGTH �, 402 i Stirrup C�eeK Drive. Suite t OOI nfrostructure, Inc. amec Durhom,North Corollno 27703 50 25 0 50 100 '4DT 2017 = 4474 foster NC Englneering F- 9253 NC Geology C-247 ���� ADT 2037 = 7170 LENGTH ROADWAY TIP PROJECT B-5300 = 0.077 MILES wheeler �9 �9138 9-9900 �� o� ���� K = � O % 2012 STANDARD SPECIFICATI011iS �Q �Q PLANS D= 60 % LENGTH STRUCTURE TIP PROJECT B-5300 = 0.018 MILES W. S. HOOD, PE P.E. � a PROJECT ENGINEER SIGNATURE: r,� � 50 25 0 50 100 T= 14 %* RIGHT OF WAY DATE: � o V= 30 MPH TOTAL LENGTH TIP PROJECT B-5300 = 0.095 MILES M,o,RCH 20, 2015 BRAD TRIPP, PE ROADWAY DESIG11t a * — 0 — O PROJECT DESIGN ENGINEER E11tGI1�EER ��� Q�Q PROFILE HORIZONTAL � ��p Qo TTST — 8/o DUAL — 6/o �' o D��� �' 10 5 0 10 20 FUNC CLASS = ARTERIAL LETTIIIIG DATE: GARY LOVERING, PE SUBREGIONAL TIER MARCH 15, 2016 PROJECT ENGINEER PROFILE (VERTICAL) NCDOT ROADWAY DESIGN P.E. SIGNATURE: � � r 0 N � O C'7 � � � � r 0 N � O C'7 � � � � i � O N � O C'7 � � BUFFER IMPACTS SUMMARY IMPACT BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT STRUCTURE SIZE / STATION ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 SITE NO. TYPE (FROM/TO) CROSSING BRIDGE IMPACT (ftZ) (ft2) (ft2) (ft2) (ft2) (ftZ) (ftZ) (ftz) 1 Bridge -L- 19+28 - 13+26' X 2956.0 2174.0 TOTAL: zsss.o z��a.o o.o o.o o.o o.o NOTE: 2956 SQ FT of allowable impacts in zone 1 2174 SQ FT of allowable impacts in zone 2 Buffer Drawing Sheet 5 of 5 Rev. May 2006 r � � N \ � � r– –––––– – i i i m See Sl�et 1 A For Index of Sheets � � � �+ � � � � � i[� °�° � � � � � � � � � """ �`"" `"°"� '°""°"� "° �°_ �" � � See Sheet 1B For Conventionol Symbols �l� N.�= B-5300 ��� ' m ���%�����T �� �������� ,��n�� ..ti.,w.� �,�. � 46000,1.1 BRSTP-0264 53 P.E, � \ 46000.2,FS1 BRSTP-0264 53 PiW I � � ' � ' �� 111WS PERMIT DRAWI11lG PLA11tS I �7 ' , � � , � BEA LIFORT COU11lTY i O � Q � c�c �°a 99 � i �.�. ,�a � M '�'yK� ��8�: sPS ,� � I � � , � ' ' / � LOCATION: REPLACE BRIDGE NO. S'5 OVER PA11tTEG0 CREEK ON US 264 � I - 1H41 , \/ , / � I � Riddick Rd� N,;,k;,,s n �� � , � � t�tility Permit Drawing i •• tB2 yuds0n 24�a �\ s�d@'' ponr 0 � V TYPE OF WORKr GRADING, PAVING, DRAINAGE AND STRUCTURE ��►eet � of�_ i � s�, '� P�.�� �� i ( , � ��'A� \ � � �j I � 1��1 �� i �r a ,� 11,�1r , NAD 83iNA 2011 i � �eie � �es� ��f I �I nkga � I � � �� 1828 wa p �� � � 284 � ' ��,� ie�e � � q I N 788 '�r 1704 F^� � BEGIN TIP PROJECT B-5300 ,Creek � "-03 »oe –L– POC STA, 16+00.00 �� � i � Chur\h ,py ��os $� 9 � _ _ _ � PRaecr � � � ��` i � , � i�oe �� � I� � �'' z a �\� BEGIN BRIDGE � `� n �' - - . 8 + . 1 � y � � g � � � ` @Q' f � � �� i 2ea � /� ,�� � ;�` @\V��/e b� � � � � I / \ \ I I � �, VICINITY MAP / \�'� � i %�� '� , ,, �, � ---� -- - -----� i �_ -------- -- --- � -- --- - - i — – – - - - - -- ------- - - - -- - - - - � !__ ___ ��, -,�-::_ :.::�::�_::::������ ::::.::::::::::-::�� ��_��: ;,,,�,.::.�.�:. -�::::_::.�::�._::_::_ �n DETOUR ROUTE , ....:............................................................... ������<<_,���:__���_�___�__;_ I } �.;_„____________________________`_,"; --- --'-•__'__-____`______ / I �', � ----f `\ \� �—/ i � –L– US 264 � \� � � �\ � i i ° � W o �� � w i � oWC i � � � V � � i � � END BRIDGE � � � Revised ° __ .,9+2., ► � � �� � � W i � r � END TIP PROJECT 8-5300 � T� � 0 11/2/15 � �o � �< � � l ►� � Z � � P ,� , o , THERE IS NO CONTROL OF ACCESS ON THIS PROJECT. � i � p�L,IMII�git'Y' I�L.A�S; i � CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. ��+��� ��� �H��F�� � � � THIS PROJECT IS WITHIN THE MUNICIPAL 80UNDARY OF PANTEGO. � � � Piepore0 !n lhe Offlas afr HYDRAULICS ENGINEER � GRAPHIC SCALES DESIGN DATA PROJECT LENGTH �u+EC e�i�o�� & r�r�osr��r��a, rx. 4021 S/l��u C�BeK Orlve.Suife 1Q� I � am Du�hom.NOr1Pi Co�lno �7703 i w ADT 2Q77 = 4474 Nc i��> >25 Nc cewo�y c-2a� „o�P z 50 �5 0 50 1Q0 �g��"�g�_g�j oF roc i � ��_ i/ ADT 2037 = 7170 LENGTH ROADWAY TIP PROJECT B-5300 = 0,077 MILES ,�� 4 � � �''' K� 10 % 1012 37ANDARD SPSCfAlCATTONS �a `�o� � PLANS o LENGTH STRUCTURE TIP PROJECT B-5300 = 0.018 MILES W. 5. HOOD, PE P,�, � � � �v D= 60 �0 PR0J6CT FNGINEBR • w . � �� � 50 25 Q 50 1Q0 T= 14 %` RIGHT OF WAY DATE; 9 = � �'c��; � �� ����` '-� TOTAL LENGTH TIP PROJECT 8-5300 = 0.095 MILES ROADWAY DESIGN �a a �Ww ■■■■■--I V= 30 MPH MARCH 20, 2015 BRAD TRIPP, PE �, �, � —� PRqJECT DBSIGN SNGLY68R ENGINEER � q �n �Z PROFILE (HORIZONTAL) * TTST = 8% DUAL = 6% �r �� 9QO�` i ��w O t0 �5 Q 10 2�o FUNC CLASS = ARTERIAL ���� �ATE� GARY LOVERING, PE r�A� >-'� ' ' MARCH 21, 2017 � °z�� V SUBREGIONAL TIER xcvoT�RO,inwerNDa�srw P� i ,��� PROFILE (VERTICAL) src�;aruxx• � o�v> I � � O \ N t � /� ��/ WATER-LINES OWNED_ BY BEAUFORT COUNTY SEWER LINES OWNED BY TOWN OF BELHAVEN � / - /__� _______'____',"_' ....-. . . � ---� . � / \� `� I � � � ,� --�. � �_..,� �I - - ��---�. `` `'�--�_._ _ ���;�v�F�--�:1"I'-�'��f�'C ' � _ ...,I-- 1'�C ST`FI. IFi � 0�. \ � `'�� _ I � ��\ ~�� �� I \ I � �y S`�--.5.��1f1 � �\ \ � �`�' - 1 � � ��� i . . . . - � `__� \ \ \ , I ��' I _ \\\\ \� � . _ _ _ __ 1 .� +� I - O ';x. ��\\\\ .\ ' ---- �' � � .� ,� �\ , , � , �; � `s���,. � ,-� � I '� \� \ � � y� � � / I � .. � 1�1 � -�, � � \ t �� I �- . �\,J � ".7 � � ��i ; � � � � � �� `/ � � 1 � \ `� . ' �\i i � � �.� ' PROP. 6" TAPPING / �p. I � � VALVE � � �� \ — � \ \ �� � ' i 1 0 ��,/ \ � �� � � �� FORCE MAIN .1 0 �C � � � � STATIONING-(TYR) �. i �� _ � �_ __�'� / \� � %� T�� \� ` —'% ���ss !' \ ��� - � � %1�� '�--= I ���\�� �; --_—_fi•_� rss-� --- � � _ � —�� --� � -.8,-� _ � � � ��� �:cF �.PROP. 6" FORCE AAAIN _.� __7 %��` __ � 6 � — �P CONTRACTOR SHALL LOCATE-_ BY OPEN CUT—� w� _ — EXIST.12" WATER LINE_ � —C ' � � I BEGIN NEW 12" WATER LINE�� II =—_—J __ r PROVIDE THRUST COLLAR PER DETAIL � � 1z' 1 �� - I AND ALLOW CONCRETE TO OBTAW +10.00 -L- �' I I . 3,000 PSI STRENGTH BEFORE INSTALLATION 28.00' RT . E3L-� _j ,qp�D- RESTRAINT OF 11.25 DEGREE BEND, 12' 45 DEGREE BEND � � � � 1 AND BACKFILLING SHALL BE ALLOWED pROP. 12" VALVE ! � ' � .. 1 +16.00 (-�-1 '' � . . � . 34.00' RT � I�� - . / ... 12" VALVE PROP. � � / / ` � . .. ARMH M4) I i i � � � � � � � +23.00 L- � `� � � �'l � 40.00' RT 1 � �--__ , ' �� �\ �- / � WL ARMH � / �\ 1 / +29.�� �-L=� � � � 46.00' RT � ,, , ; ,--., , ,, 307' OF 14 TRENCMLE55 INSTALLAiION IN SOIL 34' OF 12�TRENCHLE55 INSAIIATION NOT IN SOIL � t �� +33.00 ( L-) � 1 � - 21.00' LT � 6" TAPPING VALVE \ PROP. i 1 7-6" LINE STOP � PROP. � E�1�"FPLUG E�� f � ��€,�r \Y9.�_._ � L.aw� ABANDON 450' OF - = iz^ unurv v� FM�o- - .. . �� PR'thP. . . . , ... � `/ \ \�� �� � / . . 12".45 DEGREE BEND � � I / � '1 . . % ... � �-....__' _'_._...._..__� . .. .___"__._ / . % � � m.. .. ' . . � .. . - � . � � ' � � � I � � � � � � ' (q __.._ � / (9 Z _. � , . O _/_"__ _ ___ .� '"__".._.._-.__ _"_.._..."__""""____.. � ....._,-/� � ,� 1 � �� � � � PREPARED IN THE OFFICE OF: PROIECT REFERENCE NO. SHEET NO. 8-5300 ',.� ��� DESIGNED BY: 1RG THEWOOTENCOMPANY DRAWN BV: TK �,,,,, ➢ CHECKED BY: 1RG `�SN �Aq�(f'• .�, , ;:pP;....... ti. O Z �. "� APPROVED BY: MDS :�,Q�FESSIQH9 q'� � � , � _ u.�u�. � :4 C : � �" —% i �� REVISED: _ SEAL —� Z� VERTICAL SCALE � HORIZONTAL SCALE ? 3787e n o �• q �• iq• z�- p s�• sp• NORTH CAROLINA •., � ,�, Illffm ��iii�� DEPARTMENT OF '�:F%INEE?:'�,=' � TRANSPORTATION �'%.",'�FS"R:"�e�;:� — WATER AND SEWER LINE ,,,,,� CONSTRUCTION SHOWN UTILITIES ENGINEERING SEC ,� ,,,, PHONE: �919� 707-6690 UTILITY GONSTRUCTION ON THIS SHEET FAX: (919) 750-4151 p�qNS ONLY UTILITY CONSTRUCTION ,', � � \ ` � � I il �� ` _� ; �1� � �,, � �k 11 1;� �, � `I. I � 16'� ft (P (lv) ---\. � \\ , ABANDON 400' Ot �6" UTIL�TY PIPE � il� � WATER LINE - E i� SpTATIpNING � E �-��-�ITY� _�. «- -a-_ _ � _- `✓�rs— -- -� . - _ �a� �x- - �= = - ;. _ :i � o � F � � �� ,. I PROP. 4•-0„ MIN. � � � ARMH (FM) INSIDE PUE,i � � � � � � �„rP. �I I " � +33.00 -L- � � 42.00' RT � � ' � FM ARMH POWER POLE BY OTHERS � .+ 33.00 (-L-� \ ` � 50.00' RT i 2-6" 45 DEGREE BEND i i �� 308' OF 6' TRENCHLE55 INSTALLA710N IN SOR i i 34' Of 6' T0.ENCHLE55 INSAIIATION NOT IN 501 i� i I ' N 1 I ' � � A I oo' I ,O 'KU � n U � 6 n Z mi h��j// Z� / �� �/ � Utility Permit Drawing �' Sheet 1- of_� , � � / i / „_,__ �__ „_ , I, ' i5� ""_" � �/ � � i �. i . . . .. / ' ' 'I i � I ,I � �, , ,_ I O ��__ ""-"- ___ _ 1 i GJY �HAVE.NGk-R. JfP, o. .,x I 4 I � I I �� -- ' � I � � I _l� —' � I � � , � O � � � � ' �` E:� � — � � I . _, � ---- � - i , � �; �- ----- , ; �. 6" TAPPMG � I ...... . I I �i i ✓E I ' � � � ' _ +21.00 -L- _ � _ .: I _ . I � . '--- � I �`� 22.50' LT i �LINE STOP ��-6" TAPPING VAIVE I I � _/�-' � F � I PROP.�L �� PROP.6" FORCE MAW ruv 1-b" PLUG � �� gY OPEN CUT �� I�`. O � � 1,:�� �.31_.� � . ii i � � 5'-0" MIN. ! � SEPARATION�� POWER POLEI � BY OTHERS I PROP. i ARMH .00' RT � . !. . j � ' VALVE I I 12" PhUG - - - �_ p,,.z - .z.,, _< � PUE • +48.00 � _ 40.00' R � - -� 12" 45 I BEND I i / 12" VAWE� �- - ' � \� � � i ,�: , �,`�r�,� � �r--'�� � F 60.00 (-L-1 � \ � / .7.00'RT.... :. \� � \•'' i 2' 45 D�REE BEND . �� -� � Qy �� �CONT TOR SH L�CATE���� \ �\ � \ � j \\ EXIST.12' WATER C1NE;� \�� ��\ � j j< � BEGIN NEW 12 WATER LINE ��V?�� ��y� � �� � V , �_��PROVIDE THRUST COLLAR PER DETAIL �� �� ;�< � ����� � -� AND ALLOW CONCREfE TO OBTAIN \�� Y" � ,�f / GREE�- . 3,000 PSI STRENGTH BEFORE INSTALLATION \\� \\ r7 .'" '�\\y � AND RESTRAINT OF 11.25 DEGREE BEND, \ � � j, / ,� V AND BACI�FILLING SFiALL BE AI.LOWED � � a \ �� � � �/-/ I � � \� / � � � . � � _ � WL ARMH �� I � 1\� �� /�, I + 12.00 (-L-) . � � \ I t„1 47,00' RT � � .. PROR . .. O . . � � . . . --" I��v- / i � FM ARMH ARMH (WL) � I'� i �/. / I -- , �` IR \ .. � ( +20.00 -L- � � ` r � 45.00' RT � � � � � � ` , , ��� II' �' , I _ � _` _ ____"__` ' . � �J � 2-6" 45 DEGREE BEND \�� I ;- � - I � --� ilf ' ' - � ,..s: '- -------- ..� ` .� � � %� � � � I \ {—"__"""_"""_".""_" __""", ,..,I___""_""."__"_""__. _____�._""_"_ ._l_"._'_"__"—" —_.___—"" z L`�Y °o �a��� ddd} dpd#�6 d��d �-��QV ' _y'_� _____ �____ ___' ____ -�° C �A .���.4.1 °�°l/d.�� PROPOSED BRIDGE REPLACEMENT SHOWN IN BACKGROUND FOR REFERENCE PURPOSES ONLY � �� / I J�l, _.... . .. ' � I I __ I II _, � � I I� I , I .. . .. I II I � I _'_______ �{II-IJ' I I __ II I II . . _________ �.``1 'I I I I II I I II / \ ��-�� �II �, o- PROJEC� REFERENCE NO. � b^ / Q TYPICAL INSTALLION OF PROP. U/G TELEPHONE & CATV LINES AMEC Environment& Infrosfructure.Inc. B-5300 � a amec'� 4021 Stlr�up C�eeK Orive,Suite 100 WJI SHEEf NO. m,/ /� UNDER PANTEGO CREEK SUB GRADE / / Durhom, NOrfh Corolino 27703 ROADWAY DESIGN � NC En ineering F-1253 NC Geology C-247 ENGINEER / / �'/�_ �- _ _ _ _ . , � �, � o � ��` - - _ � � � � �,�t--- -_ � � -�: � � I � � � �. � � 1 I • .. � N ���99'S9' E � \ �490` � o �, �� '� \\ . � Ip.QWARD E.ROSE � UB 1686 PG 291 \ \ \ \ \ . EXIST. GROUND PROP. GROUND -- �---�------ `� , , --- � � � � � � � I � � � � � � / � i � � s�� � � � �� �4�� / vN PROPOSED U/G '>re �� �� � ` TEL.& CATV LINES �'�, o MIN a�„� BEGIN TIP PROJECT B-5300 `� -U- POC STA. l6 + 00.00 - -BL- 4 N (9 191 38 1-9900 �—�___� NAD 83i NA 2011 Utility Permit Drawing Sheet 3 of � 5 89•96'36' E 10.39' � d ODi , SHEEf NO. NWS-2A IYDRAULICS ENGINEER PRELIMIN.�KY PLANS UO NOT U9B POR CON6TRVCl'tON � �s• w azzr —�` \. / � ��; �N �0•qy.59� N 01' '49'.W . N 01'31'48' W N O136'02' W V 5 01'36'36' E '� EIP 'y--�\ V 4_ _ Ny- �)) \\\\ \ � � � -. ln .. ' 150.00• E ��� i.98' _. 3,20' _ 131.11' I00.00' EIP I I �� V . . , � : ip ' GUY SHAVENDER,JR.,et ux � \ . . . � o o ��� P OM NITY FIRE I \\\ \ _, , , e, �. � oo.po � N OF.PANTEG — — � DB 949 PG I88 � , . -° `�' o� � ' B�758 PC 33A � PROTECT�IBN�P08�. � � W000s I r1 HAROLD BRINLEY,et �. �/0�q mol coNC Ppo • �\ � _ . � m � DB Ii58 PG 441 ` � o N � / ' 31.3 • ' _� y C Q . v � N 01'20'01' W GARAGE � \ �� - . L� �\ /�� N f� �d ��� �" w � :� � 5o.0a' ALAN WAYN ��RUS -B�- 30+32 � y \ � a `�' 151' LT, ELEV.=3.9P _ � I� I 9 BRYANT Bl1CK, et ux � o�,y ���� Z m �N OB 6 P A3 � -L- STA 19+61.00 C -�I � IF DB 1381PG 236 O , B 9` �� . , , m F � P U IB9' LT U . TRACT I -BL - 5 + ��? � � PROP. U/G , �+�°,e9 Ftio �� \\r � , � o m �° TEL .& CAN � e�i s G. MvE S. 3 I �a-sa� � / 4Y C Fq � 7sfo o° z'� � Bsi N. m m B� JR., et ux -� O ,� � ��� ' �� , ��++��,,,,�� � ¢ r d a RAMP E �� j DB 1159 PG 977- I �6 ° � j+ ��9 R e � � � i 55'' ''..;; s i N �� N O 7 E: E , � . T Y P. I O I I� I � w , r � \ �CP; , � � I Woa�s �, A � N - ', - . BULKHEA Nm 18" P I '� r (� � �� y' � ��. Z m Q� �O REMA �n � 1 0 r4 9. B9 I � I u l 25F� } � \. \9. �P � �� ' �,- � � 1� ��. �� aa \ �� � 0 1 A0.00' _'I -. - / , � % 1 � � � \� I \ / �t: J/ ?� � .In I MTL FIRESTATION 0 I ' ' _ _ - . \ \ , • I F/s \�. � � � . \ �� . � � � ' � ;. E%CA TE 70 EL 1.36' � W m \ I ' 2SF� O I 72' CXL/3 ��+ . e - . y / � m ISfD SBW c � �[ h,f� �\ - . (STRU� RE PAY ITEMJ ______ CONC"_ _ _ _ ' .. � I 11+55.97 Ry 1\� /\\ , �} 2^ H(rie ro F �� B� - a6 =�J-�- I , 85.83• ory f�° r �� \� �°\ � C8 6U KHEAD) � O �w _ � 21s89.91 E I Y i4V •" , �.�a� / � \ . iN eaouci � h , E �E E ^� � 60' �j 35 18, isn � -i- i:�} �- �J � i�T �� � � - _ . � �• E - F F - F� � 10 liuc Q ( �ni�R�U[t iw u � � � o I 23.II.ai � 3" � 98' P F `- flDUCT F IB C114R r9_. �+�, �.,__; � " INNER�IJGi / � \2. ' \ \ \_� � _ _ - _ _ _ -_ -_ ._ � � - ,y )3 _ � \ \ � _ _ fS= A/M[E ST. lB"Q5T _—/ � \ �� _ _ - - _ _ _ _ _ - _ _ _ _ � \ 6 . �___ cxsrxc x � I ExsiN .� SY 23s3� , 2�,+ ___ OPK -'' � - . _ ��� \ % � � � 7 -�1 04� _ '�_ O r55-fMV� ' _ _' - *76.99. G 6� ry�� )qttNiW XS39. 62q c P1�� J`,5 101 ip _ I� f55 < 5 < �'--- . . _ � - - ' - - � � � � � a — 30.03' CB o 040 ° N � \ '' w 'NC , + P / � -� < - -` . �q.�pGP IB' RCP - ' �_- ' \ %� � � �S 260 2B"B 6 56 � � N � 5. w C I�� �° � I 40.05' °o ER�UCi I \� � \ or. POLE� pti �=?4•0 _ ` � U -_� b �-�_._ �� d� — �_ �� w P I CB � 407 •�p o N� I� � W I \�� �" �/ 0 0 �EIP ��Ora —_ ____� �._r-' -i- � _. _ _ .. __ . I N IY _ _ \ j/� � — -�w�— � � � CoNC WNX-� - - - _ _ _ m ° _ _ � �18 f3 � m � �' I�EIP �� �+�, /F� -�—�_ ___� RC - - �Z F�'�_�' _ _ [MisnHCaiY`�-+ m�� ~ ^� \\\�eS / j�9Ap� Fo „ _ .. .�: � .., . ;,.. � /I4Y 4Y �2• � _ _ • Fi w � �� \ J(, �vl. � � � I 0 , ' � F�. 'PUE— F PU Iml � al � "%HCa.��� \�Y�� �\a�'E1�/� /�� � �� �n, IY' � I I � � PUE PUE PUE — PUE SOII PPRKI G � , �o , w ' , �' � . '�'�,�Q/ �1"0 y�,o,��P j� Q X /� \ a I I N 4Y -BL - 3 'ml �� � I � EXIS ry-NP. � I � � � �m REM VE .IS" � IS BLK 0 olm IS BLN D ib� I j 30.13' �\\ /� $ \�\ �}pp�`J � I ql _ 1 I � i � I � .w � � � STU TURE � � p, � "� Y 4 98 X � �/ `�'. ' .�' \\\N \\ / 24�30. a �i � � � � W,. co c sw� � `� _ T PER RT.� ao m is ' ' .. _ - ,�\Nn \ i es.as- � ��� 120' S GUY H. SHAVENOER,JR., et ux c, �/ � / ti, �`� � D 1311PG9i2 �� m \\/%// e ° 6I I a ' zsro � zsro � �W � � �Ri Trs�ar wi2o�` � � z TAPER LT. � --_ � \�\ H< � `^ , mf {j' � ' � '� GRASS SWALE � - ,� MARIA ALEJANDRA � � {?d� \ � -- .. � � r�' S PEREZ Gl1ZMAN m� O � o�.qe ; ' BUFFER ZONE 7 3p,sg, ryryry���,,, z9*91,89 MARLIN Rl1DOLPH BLAKE 'I �p Q �o' i DB i475 PG 701 m zsf � I � DB 1563 PG 7B2 �� �-'l L ./� � � i� BUfFER ZONE 1 �' MARK�C. REYZER, NI --- � 1� m �o � � 2g•qe• � � ,� ARIA�ALEJkNDRA m u - 1�$ I � \\ � � C} '° �YOOOS PERE GU�AAN ti � DB 1177 PG 6n � I'-. II� I \ � o � � �� ,� - n . , O . OB I 75 P iO4 m° � _�'jN+, � I N N 0292'00' W 151.49 jj� n �� p \❑/ �' _ {�}�' 4Y 30' CMP a dYV] .6Z i �, \ \ � � � � � JOHNIE D. HODGES, et ux � JOSEPH A. HOOGES, ei ux � � N �--Eu � �" � � `� � � � � N o5'OP3 •E \ `�� � � � � � � DB 787 PG 506 `" � - DB 368 PG 280 m° EiP 24.00 E�P ,� /-� "' ' ' 7ry15 PARCEL WAS TAKEN FROM � o .. ` JACK C.RESPESS.et ux � ° � ' � I� _ � � � o , _/ � ' g BEAUFORT C0. TAX SITE ..f� . ..N oa27'a ' W I 1 DB 717 PG 684 �9 46"j6• W �� I_ ^ : � .. .. .. . . 95 � I I .. 6p'��' ClASS II RIPRAP W/FABRIC � N 01'q9•00• E I I � I N OI'q9'o0• E N OI'q9•0�' E -" I y TO TOP OF BERM 89,Zp� � -L- -DRI- �STRUCTURE PAY ITEM� II5.21' _ 121A2• Pl Sta /2+61.83 Pl Sta 15+92.68 Pl S10 23+9I.68 PI Sta I0+47.39 r � �, I _ N p= 4 3' 2 6' 2 5. 0'( L T I �= 4' I 9' 2 2. 0'( L T! �= 8 8' 4 2' S. 0° R T) �_`1 3 50'42.2'(LTl w I PROP. U/G t D= 8'43'02.1' D= 2'l7'30.6" D= 30'02'S3. ' D= 63'39'43J° . � J POWER & TEL.LINES END TIP PRO ECT 8-5300 I I I� nA L= 498.33' �^ L- 188.62' L- 295.20' T= 36.22' w I�- POT STA. 21 + 00.00 I� o T= 26/.83' o T= 94.35' - � �~ ° I R= 657.27' � R= 2.500.00' R= I90.68' R= 90.00' Q x I I��'o, o `_ _ a / �� II I � � I o I(Jl T I I ; = i �-,. - I I rn p � � m �� FOR -L- PROFILE, SEE SHEET 5 I I I � I � FOR -DRI- PROFILE, SEE SHEEf 5 � _ _ I 1 - S 10'01'36' W = - .. ml l l <� I W 150.00. O I � PAVEMENT REMOVAL 8+ I� T � I o � EIP J �I 36 E 4' ¢ � _ '� . �. "I c oo' v� I H � 190.00' � o j �^ .. .. .. .. ._ . - _ � BRIDGE APPROACH SLAB c� 2 I I n I oJ Z / FOR BRIDGE-PAVEMENT REIATiONSHIP r-� F I I t I Q -i SKETCH,SEE SHEET 2A-3 � .� FOR STRUCTURE PLANS SEE �� I I r o Q�� / SHEETS S-1 TO S-i \' - I --J c Q�O ���� � � � N 1 � � PROJECT REFERENCE NO. SHEET NO. , ��' ^/ � �' 402 � Stlr� p CreeK Dr/ve�Suitet 900I nc. B-5µ300 � No NWS , / / � amec'� Du�hom. North Corolino 27703 ROADWAY DESIGN HYDRAULICS / / � NC Enginee�ing F-1253 NC Geology C-247 ENGWEER ENGINEER � (9 191 38 1-9900 ! / /��� � � -- / �-� - � �; I � �� N�3� N�- A� � 'J � �, O �ko�� I t , , . .. � � Q� 5�0 �. � � �: � / � ... N //'99'S9' E L �Z4q,y�` � ,�y�..._ � � �l � . � �ARD E. ROSE � -, , B 1686 PC 241 \\ � BEGIN TIP PROJECT 8-5300 �' -L- POC STA.16 + 00.00 RUCTION ��Q�.�� B L I N Utility Permit Drawing Sheet_y ___pt__b,_ S 89'q6'36' E 10.39' � �� � ...�� - -- --- - � � � ei��� �� \\\ - � ' ` .. ' ' .. '� /0'99' ': `/ Q ��.�'z N 01' '99'.W . N 0137'98' W N 0136'02' W V 5 O136'36' E (� ISO,p�9 E 198' 3,20' 137.7I' 100.00' EIP � �j \\ \ �� � � X � �. ioa.00 OF, PANTEG !{ P . OM NITY FIRE I I I, �� \ � - � � �fT C • � � ' HAROLD BRINIEY, et �. w o� �, � �� �o•q B� 1)58 PG 334 m PROTECTION A SO A � �\ \� �-� , ^� � DB IISB PG 491 � o � P / � 3i.3 • � w �� �B 1710 PG 890 a W00�5 �`G` \ / N 4 � ❑� m� � � N ol'20'01'W GARAGE � � ' s' �' B�� 32 � � o o a � sa.00• a�AN WAYt� RUS F +7g.99 \ m 151' LT. ELEV.=3.9I' I O� y�yq �,�\ . . �� �N � DB 6 P 93 � _�- 5�89 9 61.00 _ C . ,o �F � \ : ,� o m '_ � "' PT Slo.16+8 .94 � Q v Bv �'OF. �\ �� �� � " o o�- w� ELLIS G. MYE 5, � c A �� �\ \, .' � zsr� o z a , \ � "' es m m esr JR.� at ux � '�9 q \ �` �� , a a,p � NOTE:E � RAMP E ��' �Q DB 1159 PC 977- � 0� +� �\ ��QCP%�� O� � � WOODS� � A� a v�i _ Q' ' • �gUOLK EEq� m �8" P(M 1 1 Q Pt99.89 I � � y� 1 � � � �e' e \ °' � / I '� �� Q° � r� � o no.00• -L- STA.20 3.5 � % 1 � � � � \ / � � m ` �n I MTL FIRESTATION G � �` \\\ � \�� ` \Y . �t �/ IS i5� . EXCAVATE TO EL 1.36' � � � I- POT STA "f_ -1.-f �'�!q� , 1 � � \ S� � � \ \ CC � to.� l4 98.3 � � i (STRUCTURE PAY ITEM) Wm � roN� D � 25F� � - m _ � � � � \ F � ' � --------- - ��.55.9� q � � _ _ - � �- B5.H3• +o�, e�`° � / \\ � _ ' IN ER�UCT � �+�, h E . E c � -E � u AD) E � ^J� � �y�LT b�i a� � �8� 91 Exisli _ KHE ' \ i�T �� ` _ . 4Y1 ��F F - F _ � 10 Q�' IN`RoUCt �N1 �t h d i - � `� i5 - _ 98• P F \- _ _ _ - 15 8=CA1Ri r9= �iW- _ > ;. ,< / \ � � \ � �� s�� _ �o- _ Evsinc xiN aoU[T _ � - _ _ ' L F cxlsi nc _ 4MCE ST.lB'B57 -- � ' \ _ � � -. - - � � F - - - . 0 _ � - .--. _ �PK _ � � r\ \.\�\ ���5-L, SS 0� _ '�! -0 r55-FMV� S - EB _ _ 6��-- C --`- .>' � � � \� i� / 30.036 ~ oCB o ��I � 040 ° (V I I �40.054OO DUCT `/( -` � �9. pGP 18' RCP� - - �- � ` � � � �5 2� � � N I' 2 /5.5� i'V C I, .. . � '�. ,.- . . � �� 2PBS7 � X o . M � -o � � EIP ���"�� -- � -�-- I W � P I CB 407 v�j I � � H 0 i ___ o � "� 18" RC � I O'^ O c� 'n P _ ___ �� _�� T g .,.. _,.. � O fV O I+ � 12' , � �,5 -��5�- ti-- - -�.-__-_ roNC w,u%- - ,, PRELIMIN�ARY PLANS DO NOT V9B FOR CONSTRUGTION � ' Gl1Y SHAVENDER,JR.,ei ux � DB 949 PG 188 .� �� i�° coNC Pao � I• IF BRYANT BUCK, ei ux UB 1381 PG 236 � TRACT i -BL- 5 j-� i ia sou _ _ _ -o o � , I �W + � zsro ' +� PROPOSED 6" N `72'�X`�3sev+ �+/ FSS LINE / �'�. � / �yp I 23�77.91 � 2 'L- �01.73• 4�+5 ��r��ex � 23.3I.29 . � 5 t0.'Cq 39.6$� �� \� �CP\ 5 Ri#s P1 �J` / \ �4p� FLAG S�.?F'P/ \ �� N � POLE£D +� � ♦ / / / 0�' a �--�.`�� OEIP ('�!�--�� - - J '-- - �2 - _ - -- - -- -- �% �.�/�/ � , m � � �� W 12' __ - n--- _ EIP -- H F� _• fl/ _ . EXiSiiHG P/Wr� �� � \\\\ vY\ �i i i 9 J�4 ( � o /� � ��� . � � � i 8 / � o- � � , - xs -��\� eJ �9 � ° , i � //. � I I � PUE F PU ml wl �HCki . �\� �� // � �p,� 6 � Q'N � �+, °I Q I ti �,P PUE .i.i SOILPARKIG � �£o � " ��� .;�,a.�/�y+e � �o;eh�i � Q // \ �Q � yy -BL- 3 �' � I�I � EXIS . ' � �m REMOVE0.15' � IS BLK 0 IS BLK � ���, I � 30.131 ��� � \� �}QpFJ / �X �I� I � � � � � I _ 16+65 -L- _ ;W' ( � SiUCTURE , � p � � .' � \\ N \ �/ 294L_9. ' < �� � � � � ;W � PRCJ6 5' k � T PER RT. " m � \ \\ ' \�� � e$ j°, a 0 "� CONC SM14 V � IS � GUY H. SHAVENOER,JR., et ux N \ , - `�,'' �� �+�, fl � l�'t8'! '�' e �2�� 5 � � � � ' \ � � � «E D 131IPG 972 � V / � � ��ea O I .. I 25FD 4Y zsFO � '" � \ �RieTrt�nr� vio� � "� rc TAPER LT. _. � ... �'''�, \\,, � � � � ;W � _ � � � p � � I GRASS SwAIE I MARIA ALEJANORA c^, � I � fl p� ( °1 PEREZ GUZMAN t�, 7 � �� ' MARLIN RUDOLPH BIAKE � __ E� `�' �o� BUFFER ZONE 4 J � 5 m`^r O � �i•<e � II f I' (J� i a DB 1475 PG 701 30.59• .• 1 ' 29.91.e9 BUFFER ZONE 1 ' AIAFK C. KEYZER, �I 25'_ �� m n�� � 29,q D8 1563 PG 7B2 _ � _ �-'l\ J� � '�� pRIA�AIEJMJORA m `� et ux PC Sio. 22+05.27 i II� e' � -- � � � $'� fJ � Woo�S PERE GU�MAN ti � OB II77 PG 64 �n, � � I� -. II � � i � \\ � ` -" � � OB I 75 P T04 N � Vy m�N 02'12'00 W -151.49 i�-L c�+ �j . O+ p. \\ I �i � � � � � A� JOSEOPH A. HODGES. et ux � � . � �-� . '.�� �} I 70• cMV J ; arv� .bZ I� � � / ? .�i' JOHNIE D. NODGES, et ux - � i N osor3 .E \ �-�' � � .�i' , UB 787 PG 506 < ��""" . `�� . I � i ' EIP 29.00 EIP DB 368 PC 280 ' - '- � ��� � � � . �� THIS PARCEL WAS TAKEN FROM ° o � JACK C. RESPESS, ei ux m° m � � � � -� � - � , S , BEAUFORT C0. TAX SITE ��f .. � N o4'27'00• W I 1 o9�q6. PT Sta.25 0.47 r I DB 717 PG 68S 6p. 36'ry _� .. .. -' .95' I ��' C1A55 II RIPRAP W/FABRIC m 01'49•00' [ I ' ��, � TO TOP OF BERM 89.20' N Oi•99'00' E __ I � -L- -DRI- (STRUCTURE PAY ITEM� 115.21' N ��'49'40'E - R1.02• Pl Sto /2+6/.83 Pl Sto 15+92.68 PI Sto 23+9/.68 m Pl Sta 10+47.39 w � �'"" I I _ � 4= 43' 26' 25.0' (LT J �= 4' l9' 22.0' (LT l �= 8 8' 4 2' S. 0° R T l 0= 4 3 5 0' 4 2. 2° ( L T ) D= 8' 43' 02.1` D= 2' l7' 30.6° D= 30' 02' S3. ' D= 63' 39' 43J" _ � END TIP PRO ECT B-5300 i I z�° I L= 498.33' � L= 188.62' L= 295.20' T= 3 6 2 2' _ w � U P O T S T A. 2 1 + 0 0. 0 0 � o T= 2 6 1. 8 3' o T= 94.3 5' T= I 8 6. 4 Y � - I� I � � R= 657.27' R= 2,500.00' R= I90.68' R= 9 0. 0 0' o a / D E N OT ES H AN D � F I I I� � � � a --I ¢ CLEARING J I > � �; � I � w i ��. � 2 I I m A I 0 �� FOR -L- PROFILE, SEE SHEET 5 I I I f'^j„� I � FOR -DRI- PROFILE, SEE SHEET 5 �_ S 1� = I �T� _. .. .. I`I I Tc I -..�� 150,006 I 1 y EIP Q � PAVEMENT REMOVAL 8* II � I 0 =6 E y x� - - ,� 60 00� � I h y ' 190.00' 2 �n � � ` J BRIDGE APPROACH SIAB .. __ .. -. .. , _ I 9 o � I I i� o' Z / FOR BRIDGE-PAVEMENT RELATIONSHIP r�l I f ,Q ¢ � SKETCH, SEE SHEET 2A-3 �� I o � FOR STRUCTURE PLANS SEE POT Sto. 28f0/. i�� I I I _ J Q� SHEETS 5-1 TO �Z . `� � / e Q� . \�// II � �� I � PREPARED IN THE OFFICE OF: PROIECT REFERENCE NO. SH ET NO. � WATF�R LINF�S OW�IED BY BEAUFORT COUNTY 8-5300 :��� � I I I I �i DESIGNED BV: JRG �; i � SEWE LINE OW ED BY TOW OF BELH VEN " 4O ---- ------- ------ ----- - -------- ---------- ------------ --------- -------------- ----------- ---------- -------- ---- ---------- -------. THE WOOTEN COMPANY „ ,,, DRAWN BV: TK ������r, '_---___ __'___'--- -_- --_— NEW BRIDGE IS SH N FOR REFE ENCE ONLY.N W WATER �j��.��eR,y(���"�<<�..� CHECKED BY: 1RG ,'�oe'j��SS �+t'�'q%I LINE LL NOT PASS IRECTLY UNDE NEATH THE N W BRIDGE �� APPROVED BY: MDS : QP� y9�. I a .. u.�;�r REVISED: - SEAL � I VERTICAL SCALE HORIZONTAL SCALE ? _ 30 � ._.-__.�_ _ o._. �__ � --------- -______ _ .._°----- - -- -- -----_--- ------ ------- ��' 9 `�' SP' NORTH CAROLINA a�e�e .;` , -_ _ -------N - ---- --�--- ------------ -- _ __ _ - — --r- -----_ ___�--- __M__.___-___�._ Iililm DEPARTMENT OF q�.NGINEEP`p��:• � �-�---r_. _ 1_ _.___ _- �1 w a_ �,m�i� ; � � I o � o ' o � I ' TRANSPORTATION ��''•�;Fa;p"1GPF".•° � ' � _+ WATER AND SEWER LINE unuros eN�iNeeniN� sec. �� 3° o =S+ N I ��n CONSTRUCTION SHOWN E. �9iy� �o��evo = o� a c�v a I �- � I Q+' �N THIS SHEET PHFAX: (919) 250.-0151 UTILITY CONSTRUCTION _� � + + Q t J.__ �� _ _ _ _.�__ I.���_.� .�..--__.�. � _ _"""__�� PlANS ONLY -?� - ------- �o- ----mj ----- -- -- -- - - -------_-Oa�"__�_-r..� _____. o^ 6 0 -- — — ---_. .__._____.__ _v_.___. � . . i � dROP UTILITY CONSTRUCTION ��� o� o� i i i d� N� 3� I 12" G TE VALVE I � I I � $TA.4+68+/- 1 O � VROP. l8" NCP-Closs /lI RqPOSEDI GFAOE La ��- AIIGNME I I PR P�EG�Eg """"" ""^__ "" ---"""- ""�"-^-" "^""_^""-- -"_" 1 O __—"��_ �e__..�.� ��._.�_��_" """� "_"�... �� m inv=0.70 (By Olhers/ - I -- _��____. _.""1"_'�"_" _____�__ _ -_�" TIE TO EXIST. 12° _L, M_ _""___� __� __�___�"" """_"_-' _—___ ___-� " _""_""° _ ___`"___ _..� _ : _y_"' _ - ' I � � � . . .. T_ _ _ .... _ . � ROP � � I _ �v /'�S I '. STA 4+75+/- HRUST �_=_1,. _>a � -1P�__.� >„ t._. ;. __.� o�aR i a�n_�=. a�_ _-_ =�, y_, _ � PRO -«�.-_.�_��- _--- fi-i � � L,. E,�e _ r=° ;-� �--_____ F14E SHOWN IS �ASED QN STf�TIONINO ALONG --- ___... ; _�, ��Y-�- --�.c�eaa,_..---. I _ .. � ; � � . , _ �.Wo,,,,;,� -__ ---_--- L_' � P OPOS D WAT R LINE ALIGNMENT A NG 0 -- O --- -- E` =-- --------1 ------ --------- -----�-='- �- -------- -�--- -+_ °_-�._-°-- �-- -- -_- nc-wow.-u�- --------- ------- --------- ------ ------- ----- --------- — -i----- -------- --------- ----------- -------- -------- ---------- — -- . . .. '-0'MIN. '_"'r'_""""I"._ll ',�. 1 �,'' � ___ _= 18��-- t--=. ROADWPY ALECiNMENT -L- � - ---�- -- � --- - ( �-- - - - - --,{. � ,, i PROP ' '--' ',_ - �N.= _ _ ____" ___ I 1� ,`\ l ,�l PROP (SE SHE T UC-4) ' / -�'�- .-. �� ' � °/j i� THRUST 45 DEGR E BEND '� � � - � -�\ ��� ; ''�i I i% COLLAR (�IE TO XIST. 12" Wl] ��� -� O STA. 0+7 +/- � `�� \�� __-� �- , ~�� % ' _ _ ___'_ _' ____ -__—___ __________'_____ ___'_______'____'_____________ __-____-_ _______" ____—_-_ '_-__—____ _______-__ _____-_- -______ _—__— __- ____'___ _ --__-_' __--__'__-� 0___ __-________ _—_____ _ __ —_ __ ___ ___'_" _�\ _'__ ______-_ _rt +_�_____� _"�_" _ ' -FR F__'--_- , ' 12" GATE VALVE RCE MAIN PROP ST .0+15+/- ( � -_�. 6" FORCE MAI ' I{ I PROP.45 �9 DR1e `�b�-a�" C900 �DR 18) V`�!' Permi Drawi g DEGREE BE D �� \`\� M�N� '� y �he { � i . + � :' �f _'LO STA.0+54i -i �� ' " � � ' '__ __-___ �:� „' �n '_'__'_-__ '___-__— _ _ + __-- ___-_ �_ "__ __—____ --.--_ _- ---_______ __________ '__"_""' --.� _____ ____- - __'___________'_ _'___'_______ ___'______ ______________ ___'--_ _ '______" _____--_ --_--_ '_ ' _ ________ _ _'____'___ ____—__ __-__-'___ ___'_ ____'-____ _________ � � 341+/- L OF STREAM �ROSSING BY 'Q 60' OF y LO 71' OF 72" FI HORIZO TAL DIRECTIO AL �RILUNG � �2" ��� �¢_' Q R1DI WATER LINE � �16" HDPE, SD 9) WATER LINE � -�O '� ClASS 350 � CLA55 350 _-_-- _______-_- —_____- -___-__- _____--j-'_-____'_ _ _ __ '_ _'__ _ _ _ _ -__ -- --' -__ __ -___ _____ '______ ______________ -'_'__'_ -"_ �_-___ __— _'"_'___ '_- -__—__- -_'_—_ ' - _'__________ __'_________ -"____ -__'_____' — � � � _____-40___ _____ _____ ______ ___ 1�" W a t e r L i n e B a f o rt C o u n t ____ ________ _____ _______ _____ _______ ________ ______________ __ _____ ___ -�o ___ y -50 -50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 -- _ ___ . _ _-.-_ IU ,,, _ :; � ` 40 � : • : " ': :: _ 40--- ----- ----- ------ ---- ------ -- - ---- - - ---------- - ---- ---------- ------ ------ ---------- -------- ----------- -------- - ----- ------- ------- -------- -------- ------------- ----------- --------- ------------- -- - --- ----------- ---------- ------- - --------- -- — i -,— \ � ' N BRIOGE IS 5 WN FOR REf RENCE ONLY. EW FORC - \ ;' fAAIN WILL NOT PAS DIRECTLY UN ERNEATH THE NEW eRID E '_� ..e5 a+� (�' tV . -30 - ------ ----- --- -- �— ---- ----- -- �-- �� A:, ------ ---- -------- --- ----- --- ------ -�---- ------- -- :� — � �-- -- � --- --------- -- ----- ---------- ------- ----- ------- ---- ------ ---- ---- - ----- -- ------ —30 ; i.:,;; '» i„ I_ � I _ I„ � I =+ � ��` PROFILEi SHOW�I IS BASED O�1 STAT,ONINGi ALON � "� � i � �` �� �� �� � � � � � ! �`' : �m � � PROPOSED FORCE MAIN LIGN ENT AL NG LLoo . o �� . � � �a`h,a+ I I .._20 __�----- No± --�a---_�� � __--- � I- ---- -i---� "��-- ------- ---- __ __ �___�_ ____.___.ROADWAY ALIGNMENT -L-___ ______ _ ,__-- -__._,__- ------ ------ _._____.. _ __20_ _ �°-- - - � (� oa � � Yw�� o �I . Wea�n ,��, u � �, �, � (SE HEET C-4) � 6 � I I PROP a y ; � PROP. /8" RCP-Cl s lll - I �� I 2-45 DEGREE BEND lo I Inv=0.70 /BY Oih is/ �OPOS�D GRAO (il- -l_ AtIGNME T I I STA. 4+92+/- - ------ -' " "^- ""_"""v""""" _"�"T "_____ " """W _ __�.__ "_____.._._... ___--_._ __�."_"__ _""�'- __'_- � I �_____"_ _ "_ _�__ _._._____ __ ( R _�__ �____"°_ """"""_"_"" " —.� _"__.__._ _ __.__�_. '_ ' �._�__ 1 ; — -{-____1_ ._ _�eiE nr ro�� �_ � .1«� �:� � x � _v �...I,K__- � a�. _ - ���v _ � = - � � - =�`=` - m_�a °- _ - - � - =i � �-- 1�I - -- ----- --- -- -- � j � ---- -------= -` - - -- - -- ---- - ROP '_'�a '_' ___ -". O "TAPPI�rG VA E �-E..�"wmer� .',:� � �.Grade '__" _""" _' _ _ _""_ ___ __ �.�_""_ "�__"" """`__"�" ""��_ _-_- ""W�� __"�" __-_—_— ___""_"""_ _-_�"__ __"__°_""'"_ __"__""'_ ___"--_ __"________ "__�___ . ���-- - Y-:�------ ---- .y� _—_"'__'_ _�__—_ ' �__ __ ' > ______� _�' "�'_.� -�-" � _ '_ G �d FYf - __ _ _ ___ -- - _ ^ 31-�' __. ( _ �'- -- � 518 rN ( EVERSE TAP T EX) '-o' "�'7.- �� + FUSIBLE PVC O l_Y_, I %'� f T�� '- 18"htiZ��t '�"'____'�. _' "'_'___"'_'_ __'____'__. y�..�\ IIN. ' '- __Ir'_' '-` -DIPSRANS(i � _'-�'_'.. \_ �'___'_ " \ I \ . �D. % � Woier �� O / I � � _.-�.__ , � � , ___ _ � __L ...-_' � r �� � . / � . PROP 18°MIN. �'� � � \� � 1 . 3� � i�� � 6„ p� ZR P 2-90 DEGR E � t � - DEGREE _1 O ' R1DI .'. � 1�� ' �ii� I ��. FI NG, VE BEND '__--"___ -____ '-'____'-__ _____-____' ________'_- __'_'__ _- -______ `. � /, 9 _______' -____-___ _ VERT_ BEND_ ___-__ _' _ -_-_ _ ' _L'-F INGr-"____ '__— _��___ -- 1 ,\ / ; , � - ____ _______SYP __________-__ _ - ___________ ____-__-_ _______.._____ ___—____ _ _ � O _ � I \\'_'_ , _�,__ __5T 5+'S9fT-____'_-_'_-____ __'__'_'___'___ ___'_'__'___ STA. 0+25 - I P `� � .,,, PR \`\ � _. 2J1 DEGREE BEN ��� � � ISTA 1+OS+f- �� / . . � ` _ - MIN. . '•�• y� ________' ' � "' __,�J-_ _____ �___ _.__ ... + -2O � _�",�W ___ __ _____ ____—__ _"^ ____'__ __" ___ ,______ _ ____'________ _____________ __"____ _____'____ _ _________ __—___ _ _—_______ � � ------- ---------- --------- ----o --- --- -- � - ----- ----- ---- --- -- -- ---- „ ------------- -------- -------- - ------- --------- ------- ------- �� > � * - � 3 +� LF OF 5T EAM CROSSIN ' BV ,'� <n ° 155' OF 6' F F 115' OF 6" H RIZONTAL DI CTIONAL DRIL ING ~ � � R1DI FORCE MAIN � I 6" FUSIBLE C 00 PVC DR 1 � R1DI fORCE MAIN y -�O N CLASS 350 N C1A55 350 y _ _____________ -__'_'____ _'_'__'__ _____'___-__ - � '_ ______ ______-- '___"'___ __ _____ PROTECTO 401 �LINED)--____' -_'_______ __'_—_- --____ _____-__- _______'_ ' '--PROTECTO 407 (LINEDI-_________ ____-___" _-'_.____ _ '_____ __' _______ ___"_'_ _____'_____- _______--__'_'__'___— _ -_______"_' _'__'_______ ______'—__ � _ _-__' � � u �� __=40_ _____________________________ _6„ Fo r e a i n Tow of Be I h v n__ -�o �� �� � �� Nd1 �" -50 -50 �� 0+00 1+00 2+00 3+00 4+00 5+00 6+00 � NM il � Li� � O N � N � � � WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) A1 AERIAL POWER LINE 16+65 to17+g3-L- 0.04 TOTALS: 0.00 0.04 0.00 0.00 0.00 0.00 0.00 Revisetl 3/3t/OS Utility Permit Drawing Sheet � of � i � I �' I m See Sl�et fA Fo� Index of Sl�ets -"�T ��` erwls srwn v¢omcr qvenrt+ce em i � See S/�et 1 B For Conventional Symbols � � � � � � � � � � � � � � � � � � � � N.�. B-5 3 00 N�' � � � � �� V' ����� �ll ���� VV � 11 � srwnwna�m. r.�.niar.eu oam�rex� � � 46000.1.1 BRSTP-0264 53 P.E. � \ 46000.2,FSt BRSTP-0264 53 R�W , � I � 1![li� ��l\�L l �l0« f I iL �I {J �j.1L-11 �� I s � �!y , i c � �� � �iG�VL'L�1L VoV1Yl d i M� � y�w�°�. 'e,5,�� a /-/ 9 9 l � I ' ' 0 � / cross I � � � � � LOC�4TION: REI�I.ACE BI�IDGE NO. �� OVER I's4NTEG0 CREEI� ON US 264 I Riddick Rd' WIIKins n �1 � \ � �1 ���{ ` � � / � � 3uffer Drawing ' — � ,e?4 � � s ;, ' � V �= ���eet � of 3 � '' ,e2 yv"s°n �� \ �@�� Pontego �� TYd'E �F WOIdK: GIZADINfB, I'AVI19tG, Dlt�llll�AGE A�lII) STRUCTURE i � �y.� \ � Pop. �7r O �- �� � C� � A� �- I ,, � � �eie � �82� a 11��1 �ro NAD 83iNA12011 � � � I � Ba I � �i� 1828 wa p �Y� � 284 I � � �, 1818 � i p` �' '" '88 �` f �„a � BEGIN TIP PROJECT B-5300 � p Church ek � 1703 »ob ��oa -L- POC ST , 16 + 00.00 � i � � Ry ,�os �+ 91 _ / _ � - -�PROJECT � � �, i � i � , ,:� z� t�oe� �\ � i � � �" � a � \ • BEGIN BRIDGE , � , � �\\���� �`� • - - . + , 1 � sea ; l� �/ � � � `��Tl�,�j� �j� j Q V � � \\���\ � � �' � / (V � VICINITY MAP / ��--�� ��,, L _ _i { __�� , �, --__ ---- � ___ J ---� � - - - - =--- - - - �j r — -�__ - - -_;_:_��_�_:---_ _ - = --- - - 1 �' --- - - - - - -- - - ` � ___..�___-- u...N>..... �.<__._Y_...... = _---...-:�. ,..s ............._..._,.. ` `} � DETOUR ROUTE -a,...-..-.�;.__............�. __.._,�_ .... ...............-:.. ------ �� _ : _. _....�.... � =1..= ..... . .... ............. ...�.. _..........................._ ... ........... � --- ----� - -------�- ------ ----------------- �-------�--- , �. ................ . � .. . .. ______:____.__.:__=�r__ _ . . . . . . . . . . . . . . . _ . . . . . . � T � \ \��� .� � -L- US 264 � - � � o � � � � ° � W ° \ �� i � m v� � i � v � I } �i ' �E O i i � � END BRIDGE i � -- ,1 + .1 � L � � W � j� � i } i END TIP PROJE CT B-5300 � ��—., � i o � � � O i Z � I � i � � o j � i _ � THERE IS NO CONTROL OF ACCESS QN THIS PROJECT. � ° CLEAR N T I PR E AL BE PERF ED TO THE LI IT E TABLI HED BY METH D III. ����i�r���o� ��' �� � � � ING O H 5 OJ CT SH L ORM M S S S O ::;;::: ............._..........._....__.....�....__�;.,.:.:::::.. : � , .::.:.:.:.:.:.:.:_.:..:.::.:..:..::.:.:,�:..:.:.:.:.:.:_......_. _......._... � L° THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARY OF PANTEGO. � E C�9 � � Preporeo in f1w Offlce of: XYDRAULICS SNGINEER GRAPHIC .SCALES DESIGN DATA PRO JECT LENGThT aNEC EnvlionmeN & Infras��uclure, rnc. I i 4021 Stl��u C�beK Diiv Su1te 1Q7 � ADT 2017 = 4474 C�Pl�l Durnom,Nah�Co�lno �7�'03 � z 5d 5 50 1 0 Nc rneeri f25 Nc Gedagy c-247 � bpqp i �, � � Q � Q ADT 2037 = 7170 LENGTH ROADWAY TIP PROJECT B-5300 = 0,077 MILES �91���'� ,�.�° �'�� � � K� 10 % 1012 BT,fNDARD SPBCIFICATIONB a�. 90� i � PLANS D= 60 % LENGTH STRUCTURE TIP PROJECT 8-5300 = 0.018 MILES W, S, HOOD, PE P�, 0 s � Q �� � 50 �5 Q 50 �QO T= 14 °h ` RIGHT OF WAY DATE. PRQJBCf BNOINSBR , 9 = i �mw � ' ' TOTAL LENGTH TIP PROJECT 8-5300 = 0.095 MILES ROADWAY DESIGN �,� a �w V= 30 MPH MARCH 20, 2015 BRAD TRIPP, PE �, ' � — � PRCvBCT DSSICrN SNGA'B&t �' 't ,� ;a PROFILE (HORIZONTALJ * TTST = 8°� DUAL = 6% �xG�� '�r o� i �}w Q �0 5 Q �o ZO FUNC CLASS = ARTERIAL LETTING DATB: GARY LOVERING, PE �� r����@ i °;�� MARCH 2�1, 2017 PROJECT HNCEN88R ��� V SUBREGIONAL TIER NCDOT ROADWAY DBSlQN P� � N�� PROFILE (VERTICALJ � src�ruxsj I `- - - - - - - - - - - - - - - - - - - - - - - - - - - -- - m PROJECT REFERENCE NO. SHEFf NO. ��^ / � � 402 � Stirrup Cr eK Drive,Suitet 100I nc. B-5�300 � No NWS-2 � m / / � amec'� Durhom, North Co�olino 277�.3 ROADWAY DESIGN HYDRAULICS / / NC Enqineering F-1253 NC Geoloqy C-247 ENGINEER ENGINEER � (9 191 38 1-9900 / '' � � , ��`� -=- � -- - �--� f- -� - -:- -- � Q �� '� � � F'RELIMINARY PLANS / \O DO NOT UBB POA CONSITtUGT10N � , ''! - - � o �k0�� � k � �: }t� � 5;°� Buffer Drawing �� � ,v 50� � . ��, ' G -f--___� S ,��,0 ` ' n�t Of ,3 NAD 83� NA 2011 • � P - H oi I .. ��. � �...�... � , 1 `� • .. � N I l'9g'Sg•` / ; 0 �'a BEGIN TIP PROJECT B-5300 � � � -U POC +0 0 � , � � �1 �` \A.16 . N , ..� � N��•99�59• E� � � EIP N OI33'45' W � ' �� ��o.00- � : .. . 'Gr ... ez.zr ' �ARD E. ROSE � Q . � �, \ � . ` DB 1686 PG 241 / S��•y9,59 :(�� '"' N CQ STRUC%��lV _ BL q S 89'n6'36' E 10.39' � Y / � O �\ N � � � � . � .bo, W ORl- PO �TA. 0+00.00 �,� � �� � , / � - _, _ ° ; , o,- � EIPQ � r \\\ '. � ` � �N ���99'S9' -' . _ Q ��.�2 N 01' ' 9� W . N 01'3i'48' W N 0196'02' W 5 0136'36' E � �li � \\ � (n . /SO,pO. E � I. 8' ` _ 3 20' , 13�.11' 100.00' EIP � � �o �, Gl1Y SHAVENDER, JR., et ux \\\ _. eo -. '^x ioopp. N aF_PANTEG P . OM NITY FIRE : � o o � � � ��� � LF I DB 949 PG I88 �\ HAROLD BRINLEY, ei �� io•y ' B I758 �PG 335 PROTECTION A SO A� C a � - e� � � DB 1110 PG 890 � WoODS � 1 • \\ \ - Nm � OB I758 PC 941 0� Q .� -, 31.3 � CONC PAO i� . Q � N o r z o• o r w �� \ �� - 7 9. 9 9 m �.G` \ Q T r _..,. r. r -BL- 30a32 � \ \ � /��' � � � �� J sa,00' AI. A N WAY N ��RUS `� ISP LT, ELEV.=3.91' + I y \ \ a F �,I I� I A BRYDBT13&PG 236 Ux . �esy'aG �;�\\ \� � /:� � i', fl mi- � `�N DB 6 P A 3 � L 589' 9T61.00 � I TRACT I � � �\ ,{ 6 . o F " . \ : ,� � - � Q Sta. 16+8 .94 � -BL- 5 + e9A�O� �\ \f \ \ %' . o Q. Q PT --� m B� E1L15 G. MYE S. : I3 I� - � i4' SoIC � ; / � ��9�q � �� \\ � � fl 2SFD ¢ Y d a RAMP � ��� JR.. 8T Ux I p � O a � 9 � � a a,o E OB 1159 PG 97� � . I £� � sn � � ��@c� , � 1 woo�s� A ; � - � • n °�ENFS . 1 T TYP. �� I I� £�I w � / �+ � ��\�.\� ,o�� I�- • Q m R m ie P �ih �n i O +49.89 I r - IIkT, � �i�' � zsFO ' } �� �a�e A , � � a,'� � � � � �� a° � N � o I� ao.00� � -L- STA.2 +3.43-- � � � � � � 1 � � � I \ �m ' MTL FIRESTATION ' ' _ ' _ � f/ \2 \ \�`� \ ��� � W isFO � ` W m \"f" -D l- PO Zs oTA f Q 7 � X + _� � ��[ �ss\ �\ � " (STRUCTURE PAY ITEM) I _____ �NC_ _ _ _ �=• CH��356W � � C C t a. l 9 9 8. 3 £ I � ns55.97s qy ' \� / \� � Y . - IS -[bF m' Z.�„ H (TIE TO F �� gy7 '. � ='J_L_ . . r���c . 85.83• 4 fo > � \� V\_ .�' BU KHEAD) p � 6 0 2/+g - ��a� -_ ry �� ^ � � \ � � . IN� EROfI E C8G E � M � 35, 9•91 ExiSii . � • � �. _ 1 \ l�%� �\ � � � - � � ' � 1y E � F � F - F� 10 i a lk RDUCi /W M 23i)I.91 � 3 - � \2 � - C i E �. . Q �{ ).:..,� INNE � / � = ' _ _ 98'P L�- CxisiNCHiM ROUCT - F _ _ &CIAB�.39 I; ... _ '-- � 1.., b„ � 23sL 9 73 p� _ E (1 GflM- - _ ft01JL \ � ` � _ _ _ \ �S /_ - � \ � � /MCE 5T. /B'QST _ - / , --� � � � ' - - - - - - _ _ _ \ � � ro _ _ F -_ ��' , + p / �55 s _ _ '�.QL q rs5- s�- GB _" _ _ -. ' � _ �� x���bq 39.55z � P� � ��-' -- _ \+\ \\ / / __ i6 5-I 04� - GMVo- ° _ � O I a76.99 6'� _ I rv _' ",� . ,a , / R x'p - ,� OJ4ly/ _ _ . I _ q � " . ___ , _ � e OI, -� C'- - �RG IH' RCP _�_� � 09 30.036 � y ce o N l' 2/5.5' W ono T ° N I � ao.os- o NNeaoucr �� � +�" " r�ac �, aP � ; _ --`" "`a' P � � � o � ,• . ^ �' / � . _ __ _ US � o , x N � +`5 ? ��� � 2B"B57 X O I POLE / � EIP �� 6 � - ���� --- I� W � 18" RCP I CB � 407 d. H N o I�(7 I � - _ ��� / /�0(�, � \ p --- ------� -�,=° _ - --� t I �2• � � \`� / '' • � � �-iT-d'5��-- OEIP CnHC� �� - - _ _I - - - _ _ _ _ - IY _ - _- - _ - - - ^\ \� � � � �/ n�J � I' �� � � I � � �� � / � 12 -� F f - -_ _ _. f'� - _ ' IS11NG R/IY`� i �� ~ \\ � e � .� J�'4o �%�, IGR/ . EN I vf I I 4Y v I. �� F F ¢ � x s. W �� � Y s _,�� l�� P� � / � I I I � � PUE PUE I°' I ,w . i+. ,�,�& n\��� ��`"� /�� � I I y � $:� Q' � ' �n, .. PUF� PIIF PUE SOIL PMKI G � �o " �.� �e y+. o`� r Q \ d "' - B L- 3 I � 4 Y . IS BLK D I S 9 L I( D �i�, 30.1 3' /� �� 8 } e F,e � d // � � 1 �� exisr 19+04 -L- � I �` m � 05`�0` �r /�x b((���. I � 1 � � I � � 17+82 -L- 18+04 -L- 8+35 -L- d , , , ��� \\ ��P X ('��° I� � � I � � I f'.� 4I "ml " �9+61 ' 40 � � P ' ' . , � �- \\\Nn � / . 28�30.98 GC" K 0 19+41 -L- • m IS ' � GLIY H. SHAVENDER,JR., et ux \ c, � � 5•35 _' �I II � 12�' S�� � D 1311PG 972 �/ � _ I zsro zsr� A2 ( BZ2 ) =471 FT 2 � � TAPER LT. � .. � �\ � \\� �, �/ � � , -� � � I : I E�''� 9i, MA ALEJANDRA - 1 �� � I fl� � �--- .. ' { �' PERE Gl1ZMAN 7 m � ��- 1� . MARLIN RUDOLPH BLAKE `\� � � A3(BZ1 )= 740 FT 2 ;o� � �a 5 m� O �'I � 25'01�9e ; ��m �I��� " z,,91.a9 C50 a � UB 14i5 G 701 � MARK C.KEYZER. 3p.59� . 1 I 79.9g• DB 1563 PG 7B2 �� L 1- � I � � PC Sto. 22+05.27 �� � � ( �;� � A4 BZi H�1 FT2 ARIA�ALEJANDRA o et ux , 1� I � \ � � p � : j I � I �- PERE Glh%1MAN N � DB n77 PG 69 I - _ � I� n II� - � � � � 4' f�+�, �� D8 I 75 P7 704 N � r;ti � _ f - . � A rt w N 029Y00 W 151.49 b 0+ O �� � ca �.,' 4Y � I� �m C� � �/ S Y 3 d%].6Z I i \ ❑ / �� � � � W .. 30 CMP `] . I N osor3 •E \��� � JOHNIE D.HODGES,ei Ux � � OB 787 PG 506 �' S � �� -� - � E�P zq,00 oa 368 PG 280 ArJ BZZ 415 FT 2 �__ � � I EiP -� /-�� ,, THIS PARCEL WAS TAKEN FROM � � �- . 1 JACK C.RESPESS,et ux ' �' BEAUFORT CO.TA% SITE - � I S 09•4 ' � --N oa�z-r•oo•w PT Sta. 25 0.47 � r I I � I DB 717 PG 684 6�.00'6 W CLASS II RIPRAP W/FABRIC N 4�'99'00• 95 ' ��, � � TO TOP OF BERM 89.20' - .• V.. N ol'49'00' E I I I N 01'99'00' �n n, u w� -L- m -DRI- (STRUCTURE PAV ITEMJ PROPOSED ��s.zr � e � - � � N � � 6 U/G WL PI Sio /2+61.83 Pl Sta 15+92.68 PI Sto 23+91.68 P/ S1a IO f97.34 y N " �z�.or . �- --- I o N p= 43' 26' 25.0' (LT! �= 4 l9' 22.0' (LT ) �= 88' 42' S.0" RTJ �= 43' S0' 422" (LT I w I �� D= 8' 43' 02J' D= 2' /7' 30.6" D= 30' 02' S3. ' D= 63' 39' 43J" _ � I END TIP PRO ECT B-5300 I I Z p L = 68.87' a � �� L= 498.33' � L= 188.62' L= 295.20' T= 36.22' w � ALLOWABLE IMPACTS ZONE 1�, pOT STA. 21 +00.00 _ � I� � � T= 261.83' o T= 94.35' T= 186.41' - o � I �, o R= 657.27' R= 2,500.00' R= I90.68' R= 90.00' o a x �o ° L_ _ T� /� ALLOWABLE IMPACT ZONE 2 �J I I� � ---I v o I�. ��� U` " I I U = i i Irnn I m h�� I I I ��, II s ro•- � �- - � _ LI �i iso.00 w � 8� 1 ^� I � I EIP � I II <o 0 y m � N=23��i6• E w . " .. x . I 190.00' �_ � j � .. .. .. _. _. . _ 6000' I 9 °o ? �� I � � I � ��I o �� / POT Sto. 28+0% ;� I � _ � Q Q Q� ���1 � �--_� y � r 0 N � N � � � BUFFER IMPACTS SUMMARY IMPACT BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT STRUCTURE SIZE / STATION ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 SITE NO. TYPE (FROM/TO) CROSSING BRIDGE IMPACT (ft2) (ft2) (ft2) (ft2) (ftZ) (ft2) (ftZ) (ftZ) A2 Power Line 17+82to 18+04-L- 471.0 A3 Power Line 18+04 to 18+535 -L- 740.0 A4 Power Line 19+04 to 19+41 -L- 811.0 A5 Power Line 19+41 to 19+61 -L- 415.0 TOTALS: �s5�.o 886.0 Uk; �:�y Buffer �rawing Sheet 3 of= � ;, \� � � � � �„ ,� � �� _, >; �> � ' C� � � �, �� �_�,, m� j �- ��� � o _ �, � o�� �Q �T 0 � ��� ��' o� o�� / ��� 0 0 � � � ., � � � � � � O N •, See Sheet � A For I ndex of Sheets See Sheet � B For Conventi onal Symbols ����\� ���� �J�`� �� ������ �� ��� ���J� � � �� ����� ��Y �� ���� _����� LOCA TI01�: REPLA CE BRIDGE 1�0. 55. O VER PAI�TEG4 CREEK 01� US 264 TYPE OF WORK: GRADII�G, PA VI1�G, DRAII�AGE A1�D STR UCTURE THERE IS NO CONTROL OF ACCESS ON THIS PROJECT. � a� > � � �s a� m �� �� �• • � � DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared i n the Of f i ce of: HYDRA ULICS E111GI11lEER GRAPHIC SCALES DESIGII� DATA PRO,%ECT LE11lGTH �; 402 � Stirrup C�eeK Drive,s� tent �� nfrastructure, Inc. 50 2 5 0 50 100 ADT 2 016 = 4, 3 3 9 a m ec Durhom, North Carolino 27703 f o ste r NC Engi neeri ng F- 9 253 NC Geology C-247 � ��� --- ADT 2036 = 7,035 LENGTH ROADWAY TIP PROJECT B-5300 = 0.077 MILES wheeler 19 191 38 9-9900 �� o� ���� �I�I� � - � K — � O % 2012 STANDARD SPECIFICATIONS �Q �Q PLANS p= 60 0�o LENGTH STRUCTURE TIP PROJECT B-5300 = 0.018 MILES W. S. HOOD, PE P.E. � a PROJECT ENGINEER SIGNATURE: � � 50 25 0 50 l0o T= 14 %* RIGHT OF WAY DATE: a _ TOTAL LENGTH TIP PROJECT B-5300 = 0.095 MILES BRAD TRIPP PE ROADWAY DESIG11l ��, a� V 30 MPH MARCH 20, 2015 � E111GI11lEER ° PROFILE (HORIZONTAL) *�ST =�% DUAL = 6% PROJECT DESIGN ENGINEER ���� 00��� l0 5 0 l0 20 = ARTERIAL LETTI11lG DATE: ARY L ERI PE �� �� p��� FUNC CLASS G OV NG, SUBREGIONAL TIER MARCH 15, 2016 PROJECT ENGINEER PROFILE (VERTICAL) NCDOT ROADWAY DESIGN P.E. SIGNATURE: / � c9 � � � Note: 1 �ot to Scale *S. U.E. = Subsurface Utility Engineering BOUNDARIES AND PROPERTY.• State Line ----- County Line Township Line --- City Line -- Reservation Line - Property Line Existing Iron Pin Property Corner Property Monument Parcel/Sequence Number Existing Fence Line -X 0 EIP -� 0 ECM 123 -X X- Proposed Woven W�re Fence � Proposed Chain Link Fence �' Proposed Barbed Wire Fence '� Existing Wetland Boundary - - - -WLe- - - - Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary Known Soil Contamination: Area or Site � Potential Soil Contamination: Area or Site �- BUILDINGS AND OTHER CULTURE.• WLB EAB EPB :• � Gas Pump Vent or U/G Tank Cap O Sign � Well ° w Small Mine � Foundation � Area Outline Cemetery i Building School � Church � � Dam HYDROLOGY.• Stream or Body of Water Hydro, Pool or Reservoir Jurisdictional Stream Buffer Zone 1 Buffer Zone 2 F I ow Arrow Disappearing Stream Spring Wetland Proposed Lateral, Tail, Head Ditch False Sump �----� �s - BZ 1 BZ 2 � --- --- �--- --- -,.�_.,. � � � FLOW � � � � � � i � � � � � � � � � � AMEC FosterpWheeler Envir Su e t OOI nfrastructure, Inc. \ a m e c,, Durhom, Nortn Corol no 27703 � � �%% � � � ��� �� � � � � � � � foster NC Engineering F- 9253 NC Geology C-247 wheeler �9 �9138 9-9900 RAILROADS.• Standard Gauge RR Signal Milepost $WltCil RR Abandoned RR Dismantled RIGHT OF WAY.• Baseline Contro) Point Existing Right of Way Marker Existing Right of Way Line Proposed Right of Way Line Proposed Right of Way Line with Iron Pin and Cap Marker Proposed Right of Way Line with Concrete or Granite R�W Marker Proposed Control of Access Line with Concrete GA Marker Existing Control of Access Proposed Control of Access Existing Easement Line Proposed Temporary Construction Easement - Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Proposed Permanent Drainage / Utility Easement Proposed Permanent Utility Easement Proposed Temporary Utility Easement Proposed Aerial Utility Easement --r- CSX TRANSPORTATION 0 MILEPOST 35 � SWITCH � � � � Proposed Permanent Easement with Iron Pin and Cap Marker ROADS AND RELATED FEATURES.• Existing Edge of Pavement - Existing Curb - Proposed Slope Stakes Cut - Proposed Slope Stakes Fill - Proposed Curb Ramp Existing Metal Guardrail — Proposed Guardrail = Existing Cable Guiderail — Proposed Cable Guiderail — Equality Symbol Pavement Removal I�EGETATION.• Single Tree Single Shrub , W Hedge Woods Line � � ♦ 0 R i� 0 .. � ��� � .�. �- iC� �A, c E E TDE PDE DUE PUE TUE AUE � C F CR ti :���������: �3 � Orchard Vi n eya rd EXISTING STRUCTURES: MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall - MINOR: Head and End Wall Pipe Culvert Footbridge Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES.• POWER: Existing Power Pole Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Pvwer Manhole Power Line Tower Power Transformer U/G Power Cable Hand Hole H-Frame Pole Recorded U/G Power Line Designated U/G Power Line (S.U.E.*) TELEPHONE: � � � � Vineyard }--- CONC J ��N� WW � ONC HW � CB O -5 i b � � O � � .—. P _._.{ - - - -P- - - - Existing Telephone Pole -� Proposed Telephone Pole � Telephone Manhole O Telephone Booth ❑� Telephone Pedestal ❑T Telephone Cell Tower � U/G Telephone Cable Hand Hole HH Recorded U/G Telephone Cable T DOCUM Designated U/G Telephone Cable (S.U.E.*) - - - - -T - ��ESs Recorded U/G Telephone Conduit T� Designated U/G Telephone Conduit (S.U.E.*j- - - - -T�- - - - Recorded U/G Fiber Optics Cable T FO Designated U/G Fiber Optics Cable (S.U.E.*-j- ----T Fo- -- WATER: Water Manhole O Water Meter o Water Va lve � Water Hydrant � Recorded U/G Water Line W Designated U/G Water Line (S.U.E.* - - - -W- - - - Above Ground Water Line A�� Water TV: TV Satellite Dish C� TV Pedestal ❑� TV Towe r � U/G TV Cable Hand Hole HH Recorded U/G TV Cable T� Designated U/G TV Cable (S.U.E.*) - - - -T�- - - - Recorded U/G Fiber Optic Cable T� F° Designated U/G Fiber Optic Cable (S.U.E.*� ----T� Fo- -- GAS : Gas Va lve Gas Meter Recorded U/G Gas Line Designated U/G Gas Line (S.U.E.*) Above Ground Gas Line SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Above Ground Sanitary Sewer Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E.*) MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line U/G Tank; Water, Gas, Oil Underground Storage Tank, Approx. Loc. AL��iGT�'Q�ES��� i� O I Geoenvironmental Boring U/G Test Hole (S.U.E.*) Abandoned According to Utility Records End of Information 0 � _�_ ----�- A/G Gas � O ss A/G Sanitary Sewer F55 - - - -FSS- - - - • a 0 � - ?UTL - 0 UST � � � AATU R E.O.I. C-' �� � cv �� �. �; � 5 � �J � �' r � �� � ��� � �' �' � , o-� � ��- �� L_ _� � ��� �� � N 3 � �, �� � o- ��� ��- ��_ C1 C2 PAVEMENT SCHEDULE (FINAL PAVEMENT DESIGN APRIL �0, 20/�� PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, C 3 AT AN AVERAGE RATE OF 112 LBS. PER SQ. YD. PER 1" DEPTH. TO BE PLACED IN LAYERS NOT LESS THAN 1%2" IN DEPTH OR GREATER THAN 2" IN DEPTH D1 PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.OB, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0B, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" D 2 DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN 2%2" IN DEPTH OR GREATER THAN 4" IN DEPTH E1 I PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0B, E 2 AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO BE PLACED IN LAYERS NOT LESS THAN 4" IN DEPTH OR GREATER THAN 5%2" IN DEPTH BASE TO BE STABILIZED WITH 200 TO 400 LBS. PER SQ.YARD L OF STABILIZER AGGREGATE MIXED WITH THE TOP 3" OF SUBGRADE SOIL AT LOCATIONS DIRECTED BY THE ENGINEER � � T U W1 2'_6„ CONCRETE CURB AND GUTTER 4" CONCRETE SIDEWALK EARTH MATERIAL EXISTING PAVEMENT VARIABLE DEPTH ASPHALT PAVEMENT SEE STANDARD WEDGING DETAIL NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. SuRVEY � i 10' 2 � 12'-3,,, � _�_ � � I � I � 12'-3,,, � _I� � � AMEC Foster W heeler Env1 ronment & I nf rastructure, I nc, �, 402 � St1 rrup CreeK Dri ve, Sui te � 00 a m e c Durhom, North Coroli no 27703 foster NC Englneering F- �253 NC Geology C-247 wheeler f9 �9� 38 �-9900 US 2�4 2' 10' 6„ VAR. i R � ' R -�"�D1 ` �2 Cl Wl � C2 D1 , � * I GRADE Cl * .02 \ ,,,' ��� .025 � POINT .025 VAR. SLOPE �- � ,' i ---- ------ % �EE X—SECTIONS ' --- ' ---- -------- , , , - ;- - _ � ,T 6�, I � i 6„ � �� � I � � ��� � U ���� ,� � ,- �, E1 ,; , El , , „ i � � � , �, S VAR. SLOPE SEE X—SECTIONS �' \' ----�'� � i �4" CONCRETE SIDEWALK ' '� i SEE PLANS FOR LIMITS ,�' GRADE TO THIS LINE ,' ,� � � � GRADE TO THIS LINE � � , ,' � � , , ,_--------, � /� �� '��\\ /i �-'� �� ,� TYPICAL SECTION NO. 1 � � � ' � � � � , � � ,�� R � � C1 ` �, � IN C2 � , , � w� , � * � ;� D1 .025 , �, � , - � , i � ° — i � i � ° �� � � � � � — � � � ,' T 6„ ��„ ;, ,, , U � � El E1 ' `, SAWCUT �' �� REMOVE EXISTING,�� GRADE TO THIS LI�NE PAVEMENT ,�� , � �, � I NSET "A" USE IN CONJUNCTION WITH TYPICAL SECTION NO. 1—L— STA. 16 + 15.00 TO —L— STA. 17 + 55.00 LT & RT USE IN CONJUNCTION WITH TYPICAL SECTION NO. 3—L— STA. 20 + 00.00 TO —L— STA. 21 + 00.00 RT Detail Showing Method of Wedging VAR. SLOPE SEE X—SECTIONS VAR 10' TYP .02 . Ti 6„ � GRADE TO THIS LINE 2 � 12'-3„ Q w Z � _ V �C Dl * .025 , � i i � i � i 12'-3„ � _�_ GRADE * POINT ,025 . US 2�4 i , »„ � R L E� i E1 TYPICAL SECTION NO. 2 VAR 2' 10' TYP 6„ VAR. 5, � 4' TYP. R , .02 , 6" S T PROJECT REFERENCE NO B —5300 ROADWAY DESIGN ENGINEER SHEET NO. 2A —/ PAVEMENT DESIGN ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED * .025 SUPERELEVATION CHOSEN FOR HYDRAULIC SPREAD USE TYPICAL SECTION NO. 1 —L— STA. 16 + 00.00 TO —L— STA. 17 + 55.00 NOTE: 1) TRANSITION FROM EXISTING PAVED SHOULDER TO PROPOSED CURB AND GUTTER SECTION (SEE PLAN) 2) TRANSITION SIDEWALK FROM EXISTING SHOULDER AT —L— STA. 16 + 00.00 TO PROPOSED BERM ,-� ��, � , , � � � , Q � , � , � , � , w � , Z � , � , � � J � , 6� _ � ' U � � � , � � � � � � � � � � � � � � � � , , T � , C2 � , * � � � ; VAR. SLOPE ,pg , .025 ; ', SEE X—SECTIONS — ; � � � —�` D1 � � � � � � 11" � � � , E� L , � , � , . , . , . , . �`� GRADE TO THIS LINE �'� , . , , � , � , I NSET "B" USE IN CONJUNCTION WITH TYPICAL SECTION NO. 2—L— STA. 19 + 26.19 (END BRIDGE) TO —L— STA. 20 + 00.00 LT VAR. SLOPE SEE X—SECTIONS -�-- USE TYPICAL SECTION NO. 2 —L— STA. 17 + 55.00 TO —L— STA. 18 + 28.81 (BEGIN BRIDGE) —L— STA. 19 + 26.19 (END BRIDGE) TO —L— STA. 20 + 00.00 o� -r ��� 0 N � U O[ i O" �� �� N 0 -�. ��� 0 N � U O[ i O" �� i i i i i i ° � � PROJECT REFERENCE NO. SHEET NO. �. � '� / � ,� AMEC Foster Wheeler Envlronment & Infrastructure, Inc, B-5300 4 ; � , 402 9 Stirru CreeK Drlve9 p Suite lOO tLW SHEET NO. i / � amec Durhom, North Corollno 27703 ROADWAY DESIGN HYDRAULICS � foster NC Engineering F- �253 NC Geology C-247 ENGINEER ENGINEER � � � � � wheeler (9 99138 �-9900 � � % �', � � � � ��-------------,-- , - ___ �, � �'� ���� � � � , �, � �� � , / � � � � � I I I �� NAD 83✓ ' � � '� y� �� NA 2 O11 � � � � , � � , � � � � p0� � �� `'>�����;.� � � �^'� x i � �-- �� `�_�si '� ' -- �; ��p° DOCUMENT NOT CONSIDERED FINAL � �� , �� � —�'-r'��� UNLESS ALL SIGNATURES COMPLETED � \ � �� � �„-z,�' Q�' N OTE : � � � � � �_ _� EXISTING BULKHEAD TO REMAIN �� ' '� _ , AND BE UNDISTURBED s �'�2��� � � � i \� � • _ N ll°qg,s9� E ' ��� BEGI1� TIP PROJECT B-5300 � � � ��.� ; � ,, �, � = ��"�r� �' —L— POC STA.,16 + 00.00 N � � � � � � N ��9,Sg„E � �� � �J'� � � � kIP N 01°33'45"W �� � � �� � S S 89°46'36" E � � 82027' i ��� � ` I�NARD Ee ROSF � � �� � i � � � , ' �� � � � �� � `, �� �3 �68� P� ��i � � �`� s �� �� -�;�GIN CQl1/ TRUCTION �� � io,3g� ' � � i � q� � - �,�, - � � ��,-�, ,,,� i , �� � � �,, �, � �'-��- �i �aoo ���'" � �`�-�� DRl- POT '�A. +00.00 ���, �� -'� � - 4 ��� � �,, ,� �� � � � � � � � � �� � N 8���� 50. ° E AH ���� � � � ; �, , � � ' � �� � `�-�, ` � ` � ,�, �j -- __�— � p � � `� � �s��"'���� E i � ' �� � i � �` �` N �0° r�� � N 01° �44"�W r. N 01°37'48" W N 01°36'02" W S 01°36'36" E � � i �� � � ` � � � �� `'� ��`"' �� . . 4g�5g,� L� u _ �/� E.. '-��., �� ��.�2 � � � i � `� `� � �' � `�'� IS�o��, E � 1,�98 �� �_ 73,20' 137071' 100,00' EIP � i � '� �� �� � � � � N � � `� �o� � \ � � �� ��- � � � � i GUY SHAVENDERy JRo, et ux i i V ' \ V `�-_ �'-'�-" `�'-a, ' � �� ° � � �v a � o � �� � �� _ � � �0 w I� .o F P A N� o �z 4 �,-� m � � � rv rv � `� � `� �s��� �, o � � `u^ _ o L � � , _. � � � � � � � r � C 0 M N I T Y . N� C � � � �� �'� `� c, `�, � � �„ _.� � o HAROLD BRIN�EYg et �, o o�, � � I� qg �� I l'�� �_� 4�, ROTE�TI JN ASSO IA�I6�g N� z � so.o � -� � DB 949 PG 183 i �; � `� � � � � i '^� � o � � � � 9' � W00DS � z -I I i � �� ''� � �_� m� DB 1758 �G 4ql � - � 3l, w ��, DB 1710 PC 890 � � � • � `� � � � A` �V � i ��"-?, � � � � � N 01°20'01" W � 3 � ° � '�- -$�1=1 i - � � � � � � CONC PAD j � �� \ `�,� `� � � � �� � �� '� � 50000� �ARA�E � - _ � T S�' �/0+79.99 _ � � � � � , �'3 � � , w � ,,3 � A�A QY ��RUS � �, rT, � � � m � � -8�- 30-�-32 �� � �= BRYANT BUCK �'y � � � �� 151' I_T, ELEV,=3,91' m �' w� � i� �� � � � DB 56 PG 43 � „� � u� � � g et ux i i � S�, i � � i � z � � � � � - � w � � _�... STA 9+61000 -� o� � � � � i � q� � � � �� i � / � ,' � � v� � w � `�. � !89' L_1'� z �° � � �� � DE3 1381 PG 236 � � � %� �� � ,,�� �, , ,; � ��� � , ,, � m � !� � � ,-� PT Sta. 16+8 .94 �� � � � � � � �' - -----TRAC-r i , -��- 5 ,' + � p O ��� � �s� � � �� � ,� o m �s � � ,�' � ?� o o� � � � = ELLIS l�e MYERSg � z � - � � , I � C �'�� � �� �� � I l ��� �' � 2SF� O � , z � �� � `�'� � � ° � m BST � �Roq e i uX � l4'SOIL __�_� � �, � �� � I � � V � � � i � �, [r � � � o z �RAM Y - �� � � � � ` � , � i � '� z � � i i � E �(� D� 1159 PG 977� �� � � , � � � � � � ' c� � / Q Q z i i `�,�� � Q � � �} � i ' � � � � � �� � -„ C i � I WOODS �'� � � � � � � � I � � �' � .r v w �� ,' � \ \ ' ' � � � '� � ` " -L - P�T ST A. 2 /3.4.� _ "' �, ' , % i �� � � 6�\ c� o i � z m�,, � i � � �s, 18 Pu�(IV � i P � � �� `�� �'� � �� � � � �� y� Q Ur � �o � �� � � -� 2 �� +q9o89 2SFD = � i � n� � �, T �� °' � / i`-�r� I� �� o �° c^' � �� \ � � 0 4 0 e 0 0, i� i � ' �� �' � � �g `� ' �-`�'� � � � � � � � � , � ;� -D - T ST l +52 � 7 � � _ , , � , , � � � � �� �� I � \ = m , � r'� � �, � MT� FiRES � A � ioN � . „ � . _ , � , � � \ ���',� � �� ���, �,��'�� � � �sFO , � � � � - �� � N 38 /4 0 6 E� K� ---- � ,,- � A � �� V � `��'" �; � � i EXCAVATE TO EL 1.36' ` o � W �� 72° CNI-/35BW ,+ � �� ��, Fs� s � �- � � � e. . . � 2SFD � � � X � i -� - sT� � �/ s � �- i � � � � (STRUCTURE PAY ITEM) I � � CONC �X � , ii+sso �'�� � � � �\ �� � PCC fa. l4 98.3 ���Ex�s coNC '�� ao � -------_- --- - — ,� ____� � ,' , i H5 47 � � � A ��T� F �° � i i 2'-6" H (TIE TO � �t` � es� � —,J-�_ � � � 83� �io� �o � � � s \ � �°\ , \ -�'� •� 40 i C&G �� BU KHEAD) _ �,� � � __ ` � 2i+gqa91 I � FMV �'� ��� �� _ - '� � � � - _ � � ERDUCT , • ,�� � � � , �� �� � � i i � �' -L_ � e � i o �-� ���� `' � � -. � � E E E 6O I � i 35 �g, �xisri , � � r i F _ _ _ � : _ A - 10_ .�—�xi �i,�c � _ F �� � �o � � 23+77041 ,' ���� i � � � � _ A %� \ _ _ � IN � Q • � � iw M i � � r< � \ � � A ��FSS- _ _ _ v Fo- � ���_ �xisT�NC siw �� ' � NNFRDIJCT - - _ - _ �iNr �� - -�- � � -L- i �,�IOIo73� � �,�`� \ INNER �2 _ \ � `� 48 PV , F \_ _ _ - /- - �- � � -- � i =� — -- a \ �� �P- � -� - -� - - — -- � — ° �' � �&-�.�T F Exs�iinc ' � MAPLE STe l8'BST � A / � 6�� - - �- � �� � F�s- �� �ss- - - - � �R��. �.. �B j-f �br rv I�MP- - _ � � - - _ - ��v F�- - - - r r� rv EX�s� � �3+31e2 i � �� T � - -FSS-F.� � --- 0 - -. - c - -- ���NC 3g 4 ' �o i �PK � _ _ _ W � Q � -040 � � FM� - - - � � �- . - ��s� R � 66 � � � � < � � � � - - \ +67�56 r- � 4 � � CB � � � c� o � 76044 0 6 � U� \� � �P ��i � � - -' �'� ��' / 0 I -_� � ������� ��%4> 30003' ~ p CB cv � i u o � i 0408 0 0 � N I � I 40oQ5' o INNERDUCT - �� R�y SriN i �� \�c' �� / i � � F� � � R�P I8" RCP �� a / US � � p N 2 W o � I � ' ti � � M � ' FLAGs �� F, I � �/ � � AH°� �y � ����� 264 28'BST � x N . � ° � � � ° � T ���� �� °OLE� +� i��� � � -_���_w�� � � � w o o c� 0403 CB „ � 00 � p�n p O I o � , � � / i � EIP ��_ ��ip �� 00 18" RCP IV 18 RC IV B '_ ' � 0407 � o N o � � � w 1 ,o° � � � �_� � �� _ -�- � + I � 2 " / � �� � 4 � � � / � � O��C I � � � � - _ � , _ � � � O E I P CONC WALK - � W � � I � - - _ _� 12 " ' � E - w - - - - � \ � r � � r�'2 -_ � - � � ��j � 12' �� � � � � � `� �. - _ � _ � �- � _ � �- - � � - - _ - —� � — � . EXISTING R/W� I _ �� � � \ �-1V F / � � � � I � �I �I , � � I � g `� � / � � �'�,��- _ - -_ - -� �- -� - \� EIP ���;�'- -_ F i ExisTiNe Riw �I ` F � � - ,- �. � �� i � °�°' J�' o i � � �� � �F � F �_ � IA/ i '- i F � e �� ° I . I i X�sTiNC �� � ��� � �� �G �<<o�� ��� I I 4 �� PUE - PUE ��w� R� Y � � � �� � � � . I �� � � �� s , P�JE� PUE ' PUE� PUE soi� P,�RK� � � � I+ ` �„ ' w ��d' � ��Q �� �-� � � �� ��, �� � � _Q�_ � I z � I � m ��� �ii.,i� , � � , o� �� � � � � � � � �;� i � �, � �� � - oo,5i A�,� � i IS P�K D i �?� � o J � i � � � `� � ��'� �o � EXIST � 30� � � � �' ' 30,�5' � �, � °o� ��i �� ! � � 300.3, � � � � � � c� i � IS E3LK D i /< Q � � i �X �) �3 e `' �� � � &40' �� � i�C. i� i �� � � � � � EX SOVE � i _ �n i � � i � � � � � � �``�� , i x � � �o��° �� � � . � � i� i 1 STUCTURE � �A � _�, �' � � � � `�' i ,' � , ��� � V `n � -L- I � � � � � � � � � �'?� �P. �W � �% � � � � � , � � � i � � i � � v�� N�, �� / 24+3� g8 `-s 50 � ' z �:�"I = '� N z �W � �1\ PROf' 5 � ° + T PER RT. &ao� � ,' � �---' - � � � , �� aso35, � w� � � � o° co U � � �� 8` i �� � I- - � — t U X Q / � i CONC SW � � , w o GUY Ho SH V�_NDCR��R�y � .\ /, i �� � I � o� i EXIST �- e w �I � ' �, � o \ � - � 2 0 S � N� o„ � \ �, � � i � �o � _ o i� i � � _ � ° � DB 1311 PG 972 � A �� V / �Y i i � � � ���Y' 2SF� � w �� � � \ �3 TON�S CL � �- � � � '� °r� � o , m �,� �j � ' � � � - � � � I 2sF � � �� � RIPRAP W/20� � TAPER LT. = 40 '� �_-- �' -- � `� � � � � � i �� � I � � � i� � GRASS SWALE �' '�' \ �� � i � �} � �Q � SEE DETAIL 1 �� /' c°� � MARIA A��JANDR/� � � � � � �� � c� � � � � � w � _ � �� � � � i � �_� � ��� � � � � � i .i � � � z � PEREZ GUZMAN �0 7 °� � �'� 25+� -- �- �°i� � - i MA�I_IN RUDOLPH BLAKE � �� � i a i BUFFER ZONE 2 � Q �� � ��r o��48 i ��p ��� , �- � �_ � � i i � � z DB 1475 PG 701 30059, � 24+g�ogg i DB 1563 PG �82 -� �' � �� i zi BUFFER ZONE 1 �,� � , � � °� MARK C, KEYZERg � � � f + � __-' � � � � � 29o4g� � � _ � � , a, �� � MA�iQ �,�F�,n�o�� � C S o. 22 05.2 —_ et ux � �,� � i � �' � �' � � � PERE C�U�MAN �� o O �i ' � � i � i � w�)o;�s � v� i � �� �� i i�� � � o � �B 1177 PG 6q � �� � �� �X i � �� � ��� DB I 75 P 704 �° e � �, N 02°I2'00" W 151,49 �T z� - i�, i O i I � � � � �} � � � I °�i � � �'� � --� - � �-------_===�-r- m �W� ��bz � � � O-� i � i �v, � -- - ��� ---`a��---- 30"CMP � I � i � N 05° � � ���-� � � � � JOSE �g A8N P�G�506et ux � co �___ -- - �� � � �' o �r�r � , � � � � � ' � � � � � � JOHME D� HODGESg et ux � w °- � � -� � � � � � �� 3 �� E � �, DB 368 PG 280 � i i � � °� � �'"?� � - a i EIP 24ao0' E�P ,� /-� � � i�� T�llS PARCEL WAS TAKEN FROM � o __� �� �'� �'� i `i � JACK Ce RFSPESSg et ux � b i i� �EAUFORT CO3 TAX S�TE � - � �� �-�� �' � � , � �, � � s o9�46, � � �' --�--�,,���- �� � N o4°27�00�� w �; o PT Sto. 25�0.47 � � DB 717 F'G n84 cn � 36" w � ��' � �3a_95 w w i � � � 60°00" CLASS II RIP RAP W/ � �o�� E `� o / ,,-' � ,�m � ��; � �I i "� � GEOTEXTILE TO 89020' N 01°qg����� E _ � � � X � i -DRI- N oi°q��oo�� E � � ---' � � ' ,' �, i -L- ; � TOP OF BERM ��5,2�' i i (STRUCTURE PAY ITEM) i27,o2� - "'��` _ - � � � m � Pl Sta l0 +47.34 � �' - , ° � �� � _ Pl Sta l2 f6/.83 Pl Sta l5 +92.68 Pl Sto 23 +9/.68 0, „ �• i - ; p= 43° 26' 25.0" (LT ) 0= 4° l9' 22.0° �LT l �= 88° 42' 5.0" l RT l o , „ � ,� � o , „ o, ,I o , 0= 43 50 42.2 �LT l �� ' D= 8 43 02.1 D= 2/7 30.6 D= 30 02 53. D= 63 39 43.1 � E1�D TIP PRO ECT B-5300 0 � L = 498.33' � L = 188.62' L = 295.20' L = 68.87' � � �'� � oo �� � � T= 26/.83' � o T= 94.35' T= 186.4/' � T= 36.22� �� � L— POT STA. 21 + 00.00 3 �� �� o � R= 657.27' o�, R= 2,500.00' R= 190.68 R= 90.00 � � o �� � o � m SE = SEE PLANS SE = SEE PLANS o w I�, � �—_ , , cc � � � � � i � � � FOR DETAIL OF -DRI-, L � � � U� �,,T, � � � SEE SHEET 2A-3 � �� = o x i � Q � __------ � � � c� � �� nl z7o i w � �� � i � o z FOR -L- PROFILE, SEE SHEET 5 � � �j° � � DETAIL 1 Q ! �z i � � � STANDARD BASE GRASSED SWALE � � FOR -DRI- PROFILE, SEE SHEET 5 / _ _ _ _ _ - - - - - � � � � , i � � ���'3��� W ( Not to Scale) �°u � � ��, � � � � < o �� o � PAVEMENT REMOVAL � g I o� i � �S�°0�� Natural Natural � � � � � � �� c'� EIP Groun / Ground � i � 'C" N 0 2 °3 I'3 6 ° E �'P F � p „'.� ,��� � � �'�-'-�v-' � ��"� m � X � i m� �90,00' ��i'F �F� � m � � � � � 60 00�_ �, i i R O � � BRIDGE APPROACH SLAB �� � �� z � z i �- � R � Min. D= 0.3 Ft � � �'� � i �, � � �_-� � � °-�� 1) �LONGITUDINAL SLOPES BETWEEN 0.3%B AND a o°a o � FOR BRIDGE-PAVEMENT RELATIONSHIP � � � �� i� � / 2 MODIFICATIONS MAY BE NEEDED, AS APPROVED BY � i � �, � � = SKETCH, SEE SHEET 2A-3 � � ENGINEER. Q � � � i �� STA. 17+73 RT. � �' FOR STRUCTURE PLANS SEE �'� � � � POT Sta. 28+0/. 2 � ' �� � � � i i- � o � SHEETS S-1 TO S- � � �� � � c� o _� / � z � � � i °� � � � � � /i� �� i o� `� � � -- i c�� � w i i