HomeMy WebLinkAboutNCC240608_Site Plan or Location Map_20240301 iir
1P
\ / / / \ \, \ 1110 DATE:
�/ PAGE.
g / \
V11111111.
'- � 89 0
/ / \ \ r.\ /' •� __ nA. nBn .CFI ,.D. nEn wF.. „G,• nHn
,8111 NI \ \
.& I
li II, ,__7--
.,.,....
\ \ ( 26p \\ \ are /' 4 , ti d .NOUSE 1 II M.
I I HODS HOUSE
SITE GRNg9 ROAD I1 40. \,\\
6 �68 \ .� _ _ � �.��pL J1 Ay 2�GJ
\� ND. RD NDA. AyNGAr AY\ �\ CURB
Noes
\ S7 1.If needed,Tree Protection fencing should be Installed alonge buffer zone,wetland
ill, PyI 1 \\ \ Cbolt dory andloramund protected ees.provitling;radius':at least125 feetforeachd$ a \ lr, nonrrrr�������� fl . lre�3 fPTTTO'ST�E0.0A0 :9 ▪ N mn[iguous antl M1ave tliHerent)antl owners or rs,eacM1 lot should have intlividual Sik
-I Fences.
® 3.InsU11 required Silt Fence within 10 feet of property line to ensure there is no conflict with
y$ ��, ` 0\ S5 • eNTRAN septic system.It is the responsibility of the builder to ensure the installation of sediment
"s o 23 \ CURS INLET central measures apse not impact the septic system and repair area(a).
1 9 \ 4.Al least one Construction Entrance/Exit is to be installed per lot.
l., 4 p0.D11# \ Co \ 5 leasto tee away other dedicated easy managing ae building roses n cane shown at
\ \ \ \ no other alternative exists.Ifthis separation cannot be achieved,these areas must be
�2� \ OPEN 12 vh �ontamed behind Silt Fence.
l \ \ \ rG S.Inlets downstream of disturbances should be protected;streets should be swept when
\ SPACE \ sediment from the construction activity M present.
•1 I / 4]/ / \ N. .....1
..\NC-Environmental.jpeg 7.Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are
121 \ 020 provided on additional
TYPICAL LOT LAYOUT WITH CURB AND GUTTERts.Erosion and sediment control details are not tl awn to style.
Nir
67 e 2so
262 G8 �u'ID // \ 20 \ \ DATE: PAGE:
Lot Plan / ..,,A, '-'
/ // \ \ 1 Z2
e ` CONSTRUCTION /' b°� / \ 262 / \
LIMITS 110
// y3 ' \ #19264 123 1Sil Z.
VICINITY MAP
, 65 # /
i' , r=RUCTION \ \ a (
LIMITS any124 �_ 06IN.T.S. \ o64n 50 � gp 30"°� / '
\ '� 0 OPEN SPACE / Q � � ^�':°',,w°°
\ G' O AND / £ � 6, 6.�
p63n �11404110
.
AMENITIES �,
\\ \ 62 �G POSTAL CENTER // �_W
\ \ � ; ra.
DATE: PAGE: Lot Plan N _ �15 264 KKK-- - / 4llIllrOPENA \
"7Z7„ �I be R .1I 1.
i. e -ra74' • ' �, 'NW
- _ -'t'=II'�IL; x. posy \ \ ONSTRUCTION ` \ 14 // // 76 \
n I its pea e o 71 LIMITS / / Construction Maintenance,
Min M
�I Stokes ' Stakes 3. ntl 1. \ �� \ \ // \ 1.Clear the entrance and exit area of all vegetation,roots and other objectionable 1.Per NCG-01inspect t k and afterh1inch or
a.a minimum.10 feet beyond the toe SECnary SECTIONgra of \ \ \\ �J \ Lot Plan x \ / material and propadygrade t greater rainfall; k y requiredrepairsimmediately.
gat areas should.located at ihe()edge the '4. \ 1,3 / / \\ 2.Place the gravel to the Spedfic grade and dimensions shown on the plans and 2 Maintain thegravel pad- tit t prevent mud d ant
land disturbance.The ends of the silt , 72 "H" / \ / smooth t from leavingth construction T Thisy q periodic
l0 (1 pain �,� \ \ // /// _ i 3 Provide drone to carry water to a sediment trapor other suitable outlet topdress gwth2nch stone.
a•n^a*' AIo gam. (I ^e • �� \ 59 // 2 / __, 4 Use geotextile fabrics n order to improve stability of the foundation n locations 3 immediately remove all objectionable materials spilled,washed or
_ Oakotherdurablehardwoods.kes Lat Plan \ \_/ / ,�•y l- Subject to seepage or high water table tracked onto pub)c roatlweys
inch x 2 inch cross section should be driven N .
e.Stakessh be pacedatahe center of the \ �� �e f' ` CONSTRUCTION ENTRANCE/EXIT
maximummtervalof4feetoramaximuminte,Mal La 56 / 1 \ rS
rren<M1 th nakn,ilheslnsockrenteisnac.ina4mc, ___
Wood Mulch or Com st 4"Min. trench- 1 I s H / / e'��ti
0 1N5 height of l09 9 na 5. seven de(le.when / o
DNTRENDNED T DNsocks/wattlesarea,.a pave..dw s7 ebb° .,�
ISOMETRICw ,a,,.w.Sam...m.a,m.mm,.m,eaa,.,,a,�a.w,.. awn MAINTENANCE:aaawam.aeG«s�waakrod after
I ` /y \ \ Ilk
CONSTRUCTION SCHEDULE
1.SOCK r00 oIT¢ ea.1 Inch or greater rel.,Remove as 'G \ / I.Obtain all necessary permire mdplso approvals.Erosion and Sediment C°ntrol(EffiSC)permit ands Certificate of Coverage(COL)
ca.. \ \ �� must be obtained before any land disnubing activities oam.Acopy or the MSC permit the COC and shard copy of the plan must
CompostMulch or COmpoSt _ be kept on site,preferably in a permits box,and accessible during inspection.
for Uneendid Socks Deapn Demeter (tare (xv°,°.,^r)(Aso,°.hit)(coo.m) ,(J5r 2' Silt rank must he p a fig aV 2.Install gravel construction ewances Ors,then silt fences,reinforced silt fence
Prek<kd "m) am)^ 76 /1 outlets mrawattles.
Shen Flows .Nape a 50 10 a' I 3.Finish1 ng cod grubbingnecessary areas on the lab as they are started.
worxnree f Sllf tsock/nLe"gth(axJ (iesrm) (uzrm) ( m) (inn m re! a 4 B 1 gradingd excavation activities
Waf e ) (`aroer"7 / ^ con
xprou oar'rote
a conswchon reen n anent
g ate 7,0 (tiR 7neeert g(PReft n5mift S di...
i.. i shall the Muntilluae. e / ,./ S.B gin or with M1ous � p
JtJ" / \ 6.Fi'hull rips grading and hour All a o[disturbed for]day needs m have
(3 a°PPate�enM \ / g�owdw stall e.
/m/m) /mom) /m/m) /m/m) /m/m) dsmbenre�abeen aimerenW naa ebove,h 1 7.1 tall drrvways,wlks and patios
SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION *11,10 i r� �/ 9.Begin Las greamg of g mew
260 remplace8mulching1 tnl asodded stabilizing f 1st.1 .is n I to installation of ad an the kt me tit Lena will
is grassing stabilised and hold.
\ I / \ \ 10. IT hell d If' Pe of the - d d' viral m<asmcs and complete We following
J ___ combined If p of found the DENTS b
DATE: Wire Fene Filter Fabric PAGE: \ h. h https:IM1vxnv d g. g /b Vdt mineral d land ces/ rater rogram pdescanstmcton program.
Twelve ,0 f completespec r cos hall b kept d available for inspection at all twee It is,gh ISA Wed a
- copy be kept'a permits box.Ref U.S.113,4541 through G.S.113A57S 15A NCAC 04A0101 mmugp 15A
e
Sinai Past 8'Max.Skndard Strength tab'
NA..Extra strength fabric-out wire fence Wre Fence Wire Bock fill trench \ \ NCAC 04E0504 General Pewit NCG 010D00 NPDES for Construction Activities.
d Compact 11 Self f d sedimentation 1 bperformed least once every seven calendar days and
ek thoroughly with 20 hours f f hanl h.A needed shall be made rmmediamlymmaimem measures as
Steel Post
\ \ N.
. \ des find.All FSC shall be d specified'k details on.is plan.Amin6mge shall be installed
at the
--Mope
�_ within
project
d 1acceptancemonitoring.
l letters theproject thep hall contact NEMER to close out the E&SC
Plastic Or A to-24' d 26E� � Plan.After DEM inspection report the permintt shall visit
Wire ties 20 �al \ \ / / \ 'deg B vMCG01 mf submit ce electronicN nu of termination(o-NNOT).A$120 annual general Pewi[ke will be charged wtl eo-NO been flied out,
:along the trench
L Filter Fabric t \\ \ \ ` ^ \ \ // I ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY
1. °nnrun me sediment strength or extra strength synthetic filter fabrics. CROSSSECTION VIEW \ \v/ \ \ / n
/ NCGS 113A-54.1•IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR
�nmay Impound v2.Ensure that.olumes orwatersumaemmcaht ofthe sediment fence u efallure not corer roes atrunuth of the�lpt above
tha ground.(Higher fences
\ \ \ ` \ / - �\ / COMPLETED AS AN EXCEL SPREADSHEET.
\ \ \ \ / / AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED
3. ecurelt the filter astennle .e mmr°cipth onuous ly aewppoa post with 4 fret miinmumdoverlap When
the era p are
ost / EROSION AND
4.Support standardaenar filter fabric by wire mean fastened seenrelym me upalope aide of me pasta.exkd hence: \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE ISA
the wire rnesh support to the bottom of ps pe Maintenance:
sediment fences at least once a week and after each) \ xr-r______,
NCAC 048.0131 STATES THAT'...DOCUMENTATION SHALL BE ACCOMPLISHED BY
a mavmumm efeeland tesilestrsgh should be anvnn Ma shouleggre ter rainfall.
sediment any required
repairs immediately.
p \ INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE
5.When a wire mesh is APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING,
trench.Fasten the wire
securely he ground�ren�mofzeside of the fence post.Wire or plastic zip^es Incheapd s oor become ineffective, � H
6.Extra does 50 or50 poundnmse arorege volume mrmoae / /erenne / / •
CONTROL PLAN.'
].Ewavakme tren<hrier. lmetely 4lnMea wide and cinches deep along me proposed line of me posts end Removes I \/ //j__) /`\
I8.vlampe from thefsetelchwithsilpla oversmandaia.andanm. ,aenreareahasbee aeperly.i elnanaer�uecomOsulkirg / IIh \\ \\ \ \1O.ea<kmmecrenchwmeoiloa aOlomandsidenawa p Th g p nnnitheba<II,a andWo Omareab gradeandStabi \D ire,�nft�m,�pm �n�fi g�. red I i1 ) ��
ANC-EnvirCoroon lal.jpeg ) I M q
SILT FENCE \ I 7K �� \ . �� J l �,
0
az
\ � \� \\)�\\\ ////� I ' I /( / 260
DATE: PAGE:
4. MIN .� FENCE � , \ \ \\ \) \ �7//� ) /J1 �� PAGE 1 of
\ \\ I / J/// TOTAL DISTURBED ACREAGE: 1.16 ACRES
MDaTBE �\v \� �� I / (1 1 I LOT EROSION CONTROL PLAN
LOTS 58-60, 62-64 & 68
aTEELrNABOVE THE CEAHED \ �� J�� I J�J lI KIRWIN VILLAGE
HARDWARE WIRE DLD a , / - � 2 / /, / ' \ / PHASE 1A
„� DNTwEwBURS WIRE FENCE,FILTER FABRIC,
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION FOR
WASHED STONE _ a If CLOTH IN TRENCH
DREAM FINDERS
FILTER OF
3'FILTER FABRIC
NOTES: INTO SOLID GROUNDGeneral-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be
z67 ON GROUND 1.Hardware cloth andgreveI hoPART MuIdoverlaythesintenceoatleastAi2E relocated on the lot to insure that the potential for sedimentation runoftis eliminated as much aspossible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and o Ichingwillbemaintainedtoinsurepropergroundstabilizingcover. HOMES, LLC
88ro inches. Gravel Construction Entrance-The ravel ad should remain in a condition to prevent mud or sediment from leaving the construction site.This ma require periodic to dressin with 2-inch stone.After each rainfall,inspect an structure used to trap sediment and clean it out as necessary. Immediate) remove all
�a a,� g , p g y q ° top dressing p y p ry' y RAEFORD TOWNSHIP HAKE COUNTY
a 2.Stone outlets should be placed on low elevation areas of silt fence objectionable materials spilled,washed,or tracked onto public roadways.
and based on field conditions. Silt Fence-Sedimenifences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure SCALE:1rr=100' FEBRUARY 2024
MAINTENANCE: that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanou(operations. -
oP 1.Per NCG-01,inspect outletat lest once a week and after each or GRAPHIC SCALE
ter rainfall event Complete anyrequired repairs immediately. Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth
HARDWARE CLOTH FILTER FABRIC IN TRENCH greater 100 0 50 100 200 Mel
2.Freshen stone when sediment accumulation exceeds B inches. and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible.
3.Keep mesh free of debris to provide adequate flow. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be 9 = MMI 11
SECTION VIEW 4.Remove sediment when half of stone outlet is covered. repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass.
5.Replace stone as needed to facilitate de-watering.
..\NC-Envtr entot.)., Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope Of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third Of the wattles functional freeboard height.Removed ( IN FEET )
rr�-, Tm SILT FENCE OUTLET sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 fit.
Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305
fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE#F-0106
LAST SAVED:2/15/2024 7:43 AM LAST PLOTTED:2/15/2024 8:39 AM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\H&H CONSTRUCTORS\23-1367-05 KIRWIN VILLAGE-EC\PLANS\KIRWIN VILLAGE EC-LOTS 58-60.62-64&68.DWG