Loading...
HomeMy WebLinkAbout20181031 Ver 1_RoundHillBranch_100066_MY2_2023_20240229MY02 MONITORING REPORT Round Hill Branch Restoration Site Buncombe County, North Carolina French Broad River Basin - 06010105 DMS Project #100066 DMS Contract #7534 DMS RFP #16-007334 (Issue date: September 8, 2017) USACE AID #: SAW 2108-01168 DWR #: 2018-1031 Monitoring Data Collected: 2023 Prepared for: NC Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699 Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 MY02 Monitoring Report Monitoring and Design Firm                 KCI Associates of North Carolina, PA 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 (919) 783-9214 Project Contact: Adam Spiller Email: adam.spiller@kci.com   KCI ASSOCIATES OF N ORTH C AROLINA, P.A. www.kci.com Employee-Owned Since 1988 MEMORANDUM Date: February 21, 2024 To: Matthew Reid, DMS Project Manager From: Adam Spiller, Project Manager KCI Associates of North Carolina, PA Subject: MY-02 Monitoring Report Comments Round Hill Branch DMS #7534, Contract 100066 French Broad River Basin CU 06010105 Buncombe County, North Carolina Please find below our responses in italics to the MY-02 Monitoring Report comments from NCDMS received on January 23, 2024 for the Round Hill Branch Restoration Site. 1. Cover photo is from M1. Please update to a current MY2 photo of the site. KCI Response: This change has been made. 2. A supplemental planting is planned in early 2024 for the portions of T2 and the downstream section of RHB. Please include an update in the MY3 report and include species and quantities of planted material used. Please ensure that species selected are from the planting list in the approved Mitigation Plan. KCI Response: We will be sure to include all of this information in the MY03 report. Species selected will be from the approved planting list. 3. Please include boundary update in MY3 in regard to adjoining landowner fence issue and include photos of completed work. KCI Response: Fence work is planned for March 2024. An update regarding this work will be included in the MY03 report. 4. DMS field visit conducted in April identified landowner stockpile of logs/debris encroaching into easement near Sta: 18+00 on RHB. Please verify that this has been corrected and discussed with the landowner. KCI Response: The landowner has been reminded of his responsibility towards the conservation easement. As of the end of year site visit on December 11, 2023, no further signs of encroachment were noted in this area. 5. No areas of encroachment were identified in 2023 according to the report. There were several areas of potential mowing/scalloping encroachment identified in April 2023 along the unfenced areas along RHB. Please verify that these areas are encroachment free. KCI Response: There is one area of scalloping along the T2 boundary. This area has been added to the CCPV and the visual assessment tables. 6. T1 and T2 Hydrograph: Recommend adding consecutive days for camera observation for each graph. E NGINEERS  S CIENTISTS  S URVEYORS  C ONSTRUCTION M ANAGERS 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 (919) 783-9214 (919) 783-9266 Fax KCI ASSOCIATES OF N ORTH C AROLINA, P.A. www.kci.com Employee-Owned Since 1988 KCI Response: This change has been made. 7. Gauge malfunctions are reported for both T1 and T2. Please verify that the gauges have been repaired/replaced and are functioning correctly. KCI Response: These gauges have been replaced. 8. At the 2023 IRT Credit Release Meeting, the IRT recommended including a representative game camera photo of stream flow in future monitoring reports as an inset with the photo. date to document the supplementary data. If possible, please include or add to Photo Reference Points section. KCI Response: Representative stream flow photo have been added for both reaches. Please contact me if you have any questions or would like clarification concerning these responses. Sincerely, Adam Spiller Project Manager Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 MY02 Monitoring Report TABLE OF CONTENTS Project Summary ........................................................................................................................................... 1 Table 1. Project Mitigation Quantities and Credits ....................................................................................... 1 Current Conditions Planview ........................................................................................................................ 2 Table 2. Goals, Performance, and Results .................................................................................................... 3 Table 3. Project Attributes Table .................................................................................................................. 4 Monitoring Results ....................................................................................................................................... 5 References ..................................................................................................................................................... 5 Appendix A – Visual Assessment Data Table 4. Visual Stream Stability Assesment ................................................................................................. 7 Table 5. Visual Vegetation Assessment ...................................................................................................... 10 Photo Reference Points ............................................................................................................................... 11 Vegetation Plot Photos ................................................................................................................................ 14 Stream Flow Representative Photos ........................................................................................................... 15 Appendix B – Vegetation Plot Data Table 6. Vegetation Plot Data Table ........................................................................................................... 17 Table 7. Vegetation Performance Standards Summary Table .................................................................... 18 Appendix C – Stream Geomorphology Data Table 8. Baseline Stream Data Summary ................................................................................................... 20 Table 9. Cross-section Morphology Monitoring Summary ........................................................................ 23 Cross-section Plots ...................................................................................................................................... 24 Appendix D – Hydrologic Data Table 10. Rainfall Summary ....................................................................................................................... 35 Table 11. Overbank Events ......................................................................................................................... 35 Table 12. Stream Flow Criteria Attainment ................................................................................................ 35 Stream Hydrographs ................................................................................................................................... 36 Appendix E – Project Timeline and Contact Info Table 13. Project Activity and Reporting History ...................................................................................... 40 Table 14. Project Timeline and Contacts .................................................................................................... 41 Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 1 MY02 Monitoring Report PROJECT SUMMARY The Round Hill Branch Restoration Site (RHBRS) was completed in December 2021 and restored a total of 2,142 linear feet of stream. The RHBRS is a riparian system in the French Broad River Basin (06010105 8-digit cataloging unit) in Buncombe County, North Carolina. The site’s natural hydrologic regime had been substantially modified through the relocation and straightening of the existing stream channels, livestock impacts, and clearing of the riparian buffers. This site offers the chance to restore streams impacted by agriculture to a stable stream ecosystem with a functional riparian buffer and floodplain access. Site grading was initially completed in June 2021 with no major changes from the construction plans. From August 15 – 18, 2021, the site received 7.6” of rain. This large scale rain event caused a significant amount of deposition to the upper portion of RHB-1, mainly upstream of the first crossing. This deposition, along with a few areas of bank scour along RHB-2, was repaired in September 2021. These repairs involved removing the sediment that had been deposited in the stream and sloping back and reinstalling coir matting on the scoured banks. One small area of floodplain scour located on the left bank, just downstream of the confluence of RHB and T2, was left as a floodplain depression. This area has been stabilized with floodplain vegetation and is not anticipated to expand. It also acts as an ephemeral pool and provides beneficial habitat diversity to the site. Project planting was completed on December 20, 2021 and the monitoring components were installed on January 19, 2022. Table 1. Round Hill Branch Restoration Site (ID-100066) Project Mitigation Quantities and Credits Project Segment Original Mitigation Plan Ft/Ac As- Built Ft/ Ac Original Mitigation Category Original Restoration Level Original Mitigation Ratio (X:1) Credits Comments Stream RHB Reach 1 705 702 Cool R 1.00000 670.000 Crediting at full 30'-width buffer (STA 10+21); 20' exception for crossing STA 13+51 to 13+71; exception at crossing STA 17+11 to 17+26 RHB Reach 2 622 590 Cool R 1.00000 555.000 No credit (limited widths/crossing) from STA 17+26 to 17+92 RHB Reach 3 284 284 Cool R 1.00000 284.000 T1 387 384 Cool R 1.00000 375.000 Crediting begins at full 30'- width buffer (STA 100+09; no credit at crossing from STA 103+84 to 103+97 T2 258 253 Cool R 1.00000 258.000 Crediting begins at full 30'- width buffer (200+53) Total: 2,142.000 Project Credits Restoration Level Stream Riparian Wetland Non-Riparian Wetland Coastal Marsh Warm Cool Cold Restoration 2142.000 Re-establishment Rehabilitation Enhancement Enhancement I Enhancement II Creation Preservation Total 2142.000 ! ! ! ! ! ! ! ! ! ! !( !( !( T2 T 1 RHB XS10 102+00 18+00 2 5 + 0 0 12+00 B e g i n c r e d i t i n g Begin crediting B e g i n c r e d i t i n g PP10 C o n s t r u c t e d S w a l e B r i d g e s C o v e R d Madie Hill Dr 2 1 3 1R 2R 3R X S 1 X S 9 X S 8XS7 X S 6 XS5 X S 4 XS3 XS2 PP4 PP7 PP9 PP6PP5 PP2 PP8 PP3 PP1 2 6 + 0 0 24+00 23+00 22+00 21+00 20+00 19+00 17+00 16+00 15+00 14+00 13+00 11+00 10+00 203+00 2 0 2 +0 0201+0 0 200+00 103+00 101+00 100+00 Project Easement (4 .24 a c)Low Stem Density AreaEasement Encroachmen tInstalled New Fen cingExisting Fencin g !(Stream Gau ges !Ph oto Point Locatio nsMonitoring XSStream Resto ration No C reditExisting Wetland s (0.24 ac)Vegetation PlotsMeeting All Success CriteriaNot Meeting All Success Criteria ±0 15075Fe et CURRE NT CON DITIONS P LANVIE WROUND HILL BRANCH RESTORATION SITEBUNCOMBE COUNTY, NC Image Source: NC OneMap2019 Orthoimagery. Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 3 MY02 Monitoring Report Table 2. Round Hill Branch Restoration Site (ID-100066) Goals, Performance and Results Goal Objective/Treatment Likely Functional Uplift Performance Criteria Measurement Cumulative Monitoring Results Restore channelized and livestock- impacted streams to stable C and B-type channels Relocate or stabilize channelized and/or incised streams to connect to a floodplain or floodprone area Hydraulics 4 bankfull events in 4 separate years; 30 consecutive days of flow 1 pressure transducer on RHB-2; 2 pressure transducers and cameras on T1 and T2 2 bankfull events and both reaches recorded >30 consecutive days of flow in 2023 Install a cross-section sized to the bankfull discharge Geomorphology BHR<1.2, ER>2.2 10 cross- sections; annual visual inspection All XS with BHR<1.2 and ER>2.2 Create bedform diversity with pools, riffles, and habitat structures Geomorphology Percent riffle and pool, pool- to-pool spacing, and facet slopes as designed Longitudinal profile in MY00, annual visual inspection No signs of instability Restore a forested riparian buffer to provide bank stability, filtration, and shading Fence out livestock to reduce nutrient, bacterial, and sediment impacts from adjacent grazing and farming practices to the project tributaries. Geomorphology No change >10% in cross- section measurements between monitoring events 10 cross- sections; annual visual inspection No change >10% in any XS Physiochemical Fencing installed as designed, vegetation meeting success criteria Estimated reductions based on converted land use Fencing installed Plant the site with native trees and shrubs and a herbaceous seed mix Geomorpholgy and Species composition 260 stems/acre and average height of 6’after 5 years, 210 stems/acre and average height of 8’ after 7 years; at least 4 species from the approved planting plan in each plot w/ no species making up >50% of the stems 6 vegetation monitoring plots 5/6 plots >260 stems/acre, 5/6 plots >4 native species Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 4 MY02 Monitoring Report Table 3. Round Hill Branch Restoration Site (ID-100066) Project Attribute Table Project Name Round Hill Branch Restoration Site County Buncombe County Project Area (acres) 4.24 Project Coordinates (latitude and longitude decimal degrees) 35.6305 N and ‐82.7369 W Project Watershed Summary Information Physiographic Province Mountain River Basin French Broad USGS Hydrologic Unit 8-digit 06010105 DWR Sub-basin 04-03-02 Project Drainage Area (acres) 471 Project Drainage Area Percentage of Impervious Area 3% Land Use Classification Forest (62%), Pasture/Farmland (25%), Low‐density Residential Development (12%), and Roads (1%). Reach Summary Information Parameters Pre-project length (feet) 2,214 Post-project (feet) 2,289 Valley confinement (Confined, moderately confined, unconfined) Partially confined to confined Drainage area (acres) 471 acres Perennial, Intermittent, Ephemeral Intermittent - Perennial NCDWR Water Quality Classification C (Aquatic life, secondary recreation) Dominant Stream Classification (existing) F4/G4/E4 Dominant Stream Classification (proposed) B4/C4 Dominant Evolutionary class (Simon) if applicable Stage IV Wetland Summary Information Parameters W1 & W3 W2 W4 Pre-project (acres) 0.17 & 0.01 0.10 0.10 Post-project (acres) 0.17 & 0.01 0.10 0.10 Wetland Type (non-riparian, riparian) Riparian Riparian Riparian Mapped Soil Series Tate Loam French Loam Tate Loam Soil Hydric Status No No No Regulatory Considerations Parameters Applicable? Resolved? Supporting Docs? Water of the United States - Section 404 Yes Yes SAW-2018-01168 Water of the United States - Section 401 Yes Yes DWR# 18-1031 Endangered Species Act Yes Yes USFWS Historic Preservation Act No N/A N/A Coastal Zone Management Act (CZMA or CAMA) No N/A N/A Essential Fisheries Habitat No N/A N/A Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 5 MY02 Monitoring Report MONITORING RESULTS The MY02 vegetation monitoring was conducted August 1, 2023. Five of the six vegetation monitoring plots achieved all of the success criteria. Plot 3 had only 2 native hardwood species and 208 stems/acre. This area of the site, which includes the very bottom of the main stem and the area around T2, did not see as robust growth of the planted woody stems as the rest of the site during the first two years. KCI is planning a supplemental planting in this area of the site, which will take place in the winter before the 2024 growing season. Despite this small area of poor vigor, the site as a whole is well vegetated with many healthy woody stems and a thick and diverse herbaceous layer. The MY02 cross-section survey found that the stream was functioning as designed with some small variation as is typical for stream restoration projects. Several of the cross-sections showed signs of aggradation, particularly along the tributaries. This is a result of the large sediment source from the unbuffered reaches just upstream of the project. KCI does not believe that these small amounts of aggradation are signs of instability in the streams, but rather just the natural movement of sediment through the system. During 2023, the gauge on RHB recorded 2 bankfull events. The stream gauge on T1 recorded a maximum of 36 consecutive days of flow, while the flow camera on T1 recorded a maximum of 102 consecutive days of flow. The gauge on T2 recorded a maximum of 136 consecutive days of flow, while the camera on this reach recorded 115 consecutive days of flow. Differences in the number of days recorded by the cameras from those recorded by the gauges are generally due to the cameras becoming obscured by vegetation during the growing season or the stream flowing at levels too low for the gauges to accurately record. There are two issue areas in terms of fencing with adjoining landowners. One area is at the top of Round Hill Branch where there is existing fence located approximately 5 feet inside of the conservation easement. The second area is at the bottom of Round Hill Branch where an existing fence pole is within the conservation easement. KCI has addressed these issues with the adjacent landowners and is planning to move the fence to the appropriate location in early 2024. The site boundaries were inspected on December 11, 2023. Besides the ongoing issue described above, no other areas of encroachment were noted. REFERENCES NCDENR, Ecosystem Enhancement Program. 2009. Upper Yadkin Pee-Dee River Basin Restoration Priorities 2009. Raleigh, NC. https://files.nc.gov/ncdeq/Mitigation%20Services/Watershed_Planning/Yadkin_River_B asin/2009%20Upper%20Yadkin%20RBRP_Final%20Final%2C%2026feb%2709.pdf NCDEQ, Division of Mitigation Services. June 2017. “As-built Baseline Monitoring Report Format, Data and Content Requirement.” https://files.nc.gov/ncdeq/Mitigation%20Services/Document%20Management%20Libra ry/Guidance%20and%20Template%20Documents/6_AB_Baseline__Rep_Templ_June %202017.pdf NCIRT. October 24, 2016. “Wilmington District Stream and Wetland Compensatory Mitigation Update.” https://saw-reg.usace.army.mil/PN/2016/Wilmington-District-Mitigation- Update.pdf USACE, Sprecher, S. W.; Warne, A. G. 2000. “Accessing and Using Meteorological Data to Evaluate Wetland Hydrology.” https://ntrl.ntis.gov/NTRL/dashboard/searchResults/titleDetail/ADA378910.xhtml  Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 6 MY02 Monitoring Report APPENDIX A Visual Assessment Data      Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 7 MY02 Monitoring Report Table 4. Round Hill Branch Resotration Site (ID-100066) Visual Stream Stability Assessment Assessment Date: 12/11/2023 Reach RHB-1 Assessed Stream Length 702 Assessed Bank Length 1404 Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat.0100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% 0100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 7 7 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) 7 7 100% Amount of Unstable Footage Totals % Stable, Performing as IntendedMetric Number Stable, Performing as Intended Total Number in As-builtMajor Channel Category Table 4. Round Hill Branch Resotration Site (ID-100066) Visual Stream Stability Assessment Assessment Date: 12/11/2023 Reach RHB-2 Assessed Stream Length 590 Assessed Bank Length 1180 Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat.0100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% 0100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 2 2 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) 2 2 100% Amount of Unstable Footage Totals % Stable, Performing as IntendedMetric Number Stable, Performing as Intended Total Number in As-builtMajor Channel Category Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 8 MY02 Monitoring Report Table 4. Round Hill Branch Resotration Site (ID-100066) Visual Stream Stability Assessment Assessment Date: 12/11/2023 Reach RHB-3 Assessed Stream Length 284 Assessed Bank Length 568 Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat.0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. N/A N/A N/A Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) N/A N/A N/A Amount of Unstable Footage Totals % Stable, Performing as IntendedMetric Number Stable, Performing as Intended Total Number in As-builtMajor Channel Category Table 4. Round Hill Branch Resotration Site (ID-100066) Visual Stream Stability Assessment Assessment Date: 12/11/2023 Reach T1 Assessed Stream Length 385 Assessed Bank Length 770 Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat.0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 4 4 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) 4 4 100% Amount of Unstable Footage Totals % Stable, Performing as IntendedMetric Number Stable, Performing as Intended Total Number in As-builtMajor Channel Category Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 9 MY02 Monitoring Report Table 4. Round Hill Branch Resotration Site (ID-100066) Visual Stream Stability Assessment Assessment Date 12/11/2023 Reach T2 Assessed Stream Length 253 Assessed Bank Length 506 Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat.0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 5 5 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) 5 5 100% Amount of Unstable Footage Totals % Stable, Performing as IntendedMetric Number Stable, Performing as Intended Total Number in As-builtMajor Channel Category Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 10 MY02 Monitoring Report Table 5. Round Hill Branch Restoration Site (ID-100066) Visual Vegetation Assessment Assessment Date 12/11/2023 Planted acreage 3.68 Bare Areas Very limited cover of both woody and herbaceous material. 0.10 acres 0.00 0.0% Low Stem Density Areas Woody stem densities clearly below target levels based on current MY stem count criteria. 0.10acres 0.56 15.1% 0.56 15.1% Areas of Poor Growth Rates Planted areas where average height is not meeting current MY Performance Standard. 0.10 acres 0.00 0.0% 0.56 15.1% Easement Acreage 4.24 Invasive Areas of Concern Invasives may occur outside of planted areas and within the easement and will therefore be calculated against the total easement acreage. Include species with the potential to directly outcompete native, young, woody stems in the short- term or community structure for existing communities. Species included in summation above should be identified in report summary. 0.00 acres 0.00 0.0% Easement Encroachment Areas Encroachment may be point, line, or polygon. Encroachment to be mapped consists of any violation of restrictions specified in the conservation easement. Common encroachments are mowing, cattle access, vehicular access. Encroachment has no threshold value as will need to be addressed regardless of impact area. none 0.016 0.4% % of Planted Acreage Total Cumulative Total Vegetation Category Definitions Mapping Threshold Combined Acreage Combined Acreage % of Easement AcreageVegetation Category Definitions Mapping Threshold Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 11 MY02 Monitoring Report Photo Reference Photos PP1 – MY-00 – 1/18/22 PP1 – MY-02 – 12/8/23 PP2 – MY-00 – 1/18/22 PP2 – MY-02 – 12/8/23 PP3 – MY-00 – 1/18/22 PP3 – MY-02 – 12/8/23 Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 12 MY02 Monitoring Report PP4 – MY-00 – 1/18/22 PP4 – MY-02 – 12/8/23 PP5 – MY-00 – 1/18/22 PP5 – MY-02 – 12/8/23 PP6 – MY-00 – 1/18/22 PP6 – MY-02 – 12/8/23 Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 13 MY02 Monitoring Report PP7 – MY-00 – 1/18/22 PP7 – MY-02 – 12/8/23 PP8 – MY-00 – 1/18/22 PP8 – MY-02 – 12/8/23 PP9 – MY-00 – 1/18/22 PP9 – MY-02 – 12/8/23 Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 14 MY02 Monitoring Report Vegetation Monitoring Plot Photos Vegetation Plot 1 – MY-02 – 8/1/23 Vegetation Plot 2 – MY-02 – 8/1/23 Vegetation Plot 3 – MY-02 – 8/1/23 Vegetation Plot 1R – MY-02 – 8/1/23 Vegetation Plot 2R – MY-02 – 8/1/23 Vegetation Plot 3R – MY-02 – 8/1/23 Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 15 MY02 Monitoring Report Representative Stream Flow Photos T1 high flow – 2/17/23 T1 normal flow – 3/10/23 T2 high flow – 2/17/23 T2 normal flow – 3/10/23 Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 16 MY02 Monitoring Report APPENDIX B Vegetation Plot Data   Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 17 MY02 Monitoring Report Veg Plot 1  R Veg Plot 2  R Veg Plot 3  R Planted Total Planted Total Planted Total Total Total Total Aesculus flava yellow buckeye Tree FACU 2 2 1 2 Alnus serrulata hazel alderTreeOBL1111 31 Carya glabra pignut hickoryTreeFACU 1111 Liriodendron tulipifera tuliptree Tree FACU 1 Nyssa sylvatica blackgum Tree FAC 3 3 1 3 Platanus occidentalis American sycamoreTreeFACW66 44611 Quercus alba white oak Tree FACU 2 2 Quercus falcata southern red oak Tree FACU 2 Quercus rubra northern red oak Tree FACU 1 1 3 3 3 Salix nigra black willow Tree OBL 6 7 2 1 Ulmus americana American elm Tree FACW 1 Sum Performance Standard 17189105 5128 8 Juglans nigra black walnut Tree FACU 1 Prunus serotina black cherry Tree FACU 3 Sum Proposed Standard 17189105 5128 8 18 10 5 12 8 8 729 405 121 486 324 324 5 6 2455 37 23 80 50 38 38 3 2 3422 0 0 0000 Veg Plot 2 FVeg Plot 3 F Species  Included in  Approved  Mitigation Plan Post Mitigation  Plan Species Table 6. Vegetation Plot Data Round Hill Branch Restoration Site (ID‐100066) Scientific Name Common Name Tree/S hrub Indicator  Status Veg Plot 1 F Mitigation Plan  Performance  Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 18 MY02 Monitoring Report Planted Acreage 3.68 Date of Initial Plant 2021‐12‐20 Date(s) of Supplemental Plant(s)NA Date(s) Mowing Date of Current Survey 2023‐08‐01 Plot size (ACRES)0.0247 Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives 729 3 5 0 405 2 6 0 121 3 2 0 810 2 5 0 445 2 6 0 243 2 3 0 810 1 4 0 769 1 8 0 769 1 6 0 Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives 486 4 4 0 324 2 5 0 324 2 5 0 364 1 3 0 283 1 5 0 486 1 5 0 *Each monitoring year represents a different plot for the random vegetation plot "groups". Random plots are denoted with an R, and fixed plots with an F.  Vegetation Performance Standards Summary Table Veg Plot 1 F Veg Plot 2 FVeg Plot 3 F Monitoring Year 7 Monitoring Year 3 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 Table 7. Vegetation Performance Standards Summary Table Round Hill Branch Restoration Site (ID‐100066) Veg Plot Group 1 RVeg Plot Group 2 RVeg Plot Group 3 R Monitoring Year 7 Monitoring Year 5 Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 19 MY02 Monitoring Report               APPENDIX C Stream Geomorphology Data Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 20 MY02 Monitoring Report Table 8. Baseline Stream Data Summary   Round Hill Branch, RHB‐1  Parameter  Pre‐Existing Condition  (applicaple) Design  Monitoring  Baseline (MY0)  Riffle Only Min Mean Med Max n Min Max Min Max n  Bankfull Width (ft) 5.2    6.0 6.0 6.8 4 9.8   13.3   1  Floodprone Width (ft) 18.5  33.4 27.5 60+ 4 40 52  56.9   1  Bankfull Mean Depth (ft) 0.9 1.0 1.0 1.2 4 0.8   0.7   1  Bankfull Max Depth (ft) 1.2 1.5 1.5 1.9 4  1.3    1.5   1  Bankfull Cross Sectional Area (ft2) 5.4 6.0 6.1 6.3 4  7.6    8.9   1  Width/Depth Ratio 4.3 6.1 6.2 7.6 4  12.6    19.8   1  Entrenchment Ratio 2.7  6.0 4.6 12.3 4  4.1 5.3    4.3   1  Bank Height Ratio 1.0  1.2 1.2 1.3 4  1.0     1.0   1  Max part size (mm) mobilized at bankfull  48  52 39  Rosgen Classification F4/E4  C4/B4c  C4/B4c   Bankfull Discharge (cfs) 27.9    39.2  39.2  Sinuosity (ft) 1.07    1.1  1.1  Water Surface Slope (Channel) (ft/ft)  0.020  0.021 0.020    Other          Table 8. Baseline Stream Data Summary   Round Hill Branch, RHB‐2  Parameter  Pre‐Existing Condition  (applicaple) Design  Monitoring  Baseline (MY0)  Riffle Only Min Mean Med Max n Min Max Min Max n  Bankfull Width (ft)  5.5         1 11.4       9.7   1  Floodprone Width (ft)  35.0         1  44 65    73.9   1  Bankfull Mean Depth (ft)  1.3         1  0.9    0.6   1  Bankfull Max Depth (ft)  1.6         1  1.4    1.1   1  Bankfull Cross Sectional Area (ft2)  7.1         1  10.2     6.1   1  Width/Depth Ratio  4.2         1  12.8    15.5   1  Entrenchment Ratio  6.4         1  3.9 5.7    7.6   1  Bank Height Ratio  1.0         1  1.0    1.0   1  Max part size (mm) mobilized at bankfull  57  39  30  Rosgen Classification F4/E4  C4/B4c  C4/B4c   Bankfull Discharge (cfs) 35.5    47.5  47.5  Sinuosity (ft)  1.05  1.2  1.2  Water Surface Slope (Channel) (ft/ft)  0.020  0.014 0.016    Other          Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 21 MY02 Monitoring Report Table 8. Baseline Stream Data Summary   Round Hill Branch, RHB‐3  Parameter  Pre‐Existing Condition  (applicaple) Design  Monitoring  Baseline (MY0)  Riffle Only Min Mean Med Max n Min Max Min Max n  Bankfull Width (ft)  11.5         1  11.8     12.3   1  Floodprone Width (ft)  29.4         1  38 55 56.1   1  Bankfull Mean Depth (ft)  0.8         1  0.9   0.7   1  Bankfull Max Depth (ft)  2.1         1  1.5   1.5   1  Bankfull Cross Sectional Area (ft2)  9.0         1  11.2   8.6   1  Width/Depth Ratio  14.6         1  12.5   17.7   1  Entrenchment Ratio  2.6         1  3.2 4.7 4.5   1  Bank Height Ratio  1.0         1 1.0   1.0   1  Max part size (mm) mobilized at bankfull  34 47    32  Rosgen Classification F4/E4  C4/B4c  C4/B4c   Bankfull Discharge (cfs) 42.7    55.6  55.6  Sinuosity (ft)  1.12  1.1  1.1  Water Surface Slope (Channel) (ft/ft)  0.018  0.017  0.016   Other          Table 8. Baseline Stream Data Summary   Round Hill Branch, T1  Parameter  Pre‐Existing Condition  (applicaple) Design  Monitoring  Baseline (MY0)  Riffle Only Min Mean Med Max n Min Max Min Max n  Bankfull Width (ft) 3.8      4.1 2 6.8     6.6     1  Floodprone Width (ft) 7.9  19.0   30.0 2 35 45  50.2   1  Bankfull Mean Depth (ft) 0.7 0.7   0.7 2 0.5    0.5   1  Bankfull Max Depth (ft) 0.9 1.0     1.1 2 0.9    0.9   1  Bankfull Cross Sectional Area (ft2) 2.5  2.7   2.9 2 3.7    3.5   1  Width/Depth Ratio 5.8 5.9   5.9 2 12.7    12.2   1  Entrenchment Ratio 1.9 4.9   7.9 2  5.1 6.6  7.6   1  Bank Height Ratio  1.0 1.4   1.7 2 1.0    1.0   1  Max part size (mm) mobilized at bankfull 34  29    26  Rosgen Classification F4  C4/B4c  C4/B4c  Bankfull Discharge (cfs) 10.0  14.2  14.2   Sinuosity (ft) 1.10  1.13 1.13  Water Surface Slope (Channel) (ft/ft)  0.020 0.019  0.017   Other          Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 22 MY02 Monitoring Report Table 8. Baseline Stream Data Summary   Round Hill Branch, T2  Parameter  Pre‐Existing Condition  (applicaple) Design  Monitoring  Baseline (MY0)  Riffle Only Min Mean Med Max n Min Max Min Max n  Bankfull Width (ft) 9.7         1 6.4    6.2   1  Floodprone Width (ft) 11.8         1 27 34  36.1   1  Bankfull Mean Depth (ft) 0.3         1 0.5    0.5   1  Bankfull Max Depth (ft) 0.8         1 0.8    0.8   1  Bankfull Cross Sectional Area (ft2) 3.3         1 3.1    3.1   1  Width/Depth Ratio 28.1         1 13.2    12.6   1  Entrenchment Ratio 1.2         1 4.2 5.3  5.8   1  Bank Height Ratio 1.0         1 1.0     1.0   1  Max part size (mm) mobilized at bankfull  31 48  54  Rosgen Classification G4  B4/C4b  B4/C4b   Bankfull Discharge (cfs) 10.3  14.0  14.0   Sinuosity (ft)  1.06  1.13  1.13  Water Surface Slope (Channel) (ft/ft)  0.031  0.031 0.037    Other          Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 23 MY02 Monitoring Report MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB- Bankfull Area 2168.8 2169.0 2169.0 2168.0 2168.0 2168.0 2161.1 2161.2 2161.5 Bank Height Ratio - Based on AB Bankfull Area 1.0 0.9 1.0 --- --- --- 1.0 1.1 1.0 Thalweg Elevation 2167.3 2167.4 2167.4 2165.8 2165.8 2165.9 2160.1 2159.9 2159.8 LTOB Elevation 2168.8 2168.8 2169.0 2168.0 2168.1 2168.1 2161.1 2161.3 2161.2 LTOB Max Depth (ft) 1.5 1.4 1.6 2.1 2.3 2.1 1.1 1.4 1.3 LTOB Cross Sectional Area (ft2)8.9 6.9 8.8 15.5 17.0 16.1 6.1 7.2 6.8 MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB- Bankfull Area 2160.7 2161.4 2161.5 2154.4 2154.5 2154.4 2153.8 2154.1 2153.9 Bank Height Ratio - Based on AB Bankfull Area --- --- --- 1.0 1.0 1.0 --- --- --- Thalweg Elevation 2157.5 2157.5 2157.6 2152.9 2152.9 2152.9 2150.6 2151.3 2150.7 LTOB Elevation 2160.7 2160.7 2160.6 2154.4 2154.4 2154.5 2153.8 2153.8 2154.0 LTOB Max Depth (ft) 3.2 3.2 3.0 1.5 1.5 1.5 3.2 2.6 3.3 LTOB Cross Sectional Area (ft2)29.7 18.6 18.0 8.6 7.9 8.8 26.4 21.9 27.5 MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ MY0 MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB- Bankfull Area 2167.7 2167.9 2167.9 2167.2 2167.7 2167.8 2162.5 2162.6 2162.9 Bank Height Ratio - Based on AB Bankfull Area 1.0 0.9 1.0 --- --- --- 1.0 1.0 0.3 Thalweg Elevation 2166.8 2166.8 2166.8 2165.4 2166.0 2166.1 2161.7 2161.9 2162.0 LTOB Elevation 2167.7 2167.8 2167.9 2167.2 2167.5 2167.4 2162.5 2162.6 2162.5 LTOB Max Depth (ft) 0.9 1.0 1.1 1.8 1.5 1.3 0.8 0.7 0.5 LTOB Cross Sectional Area (ft2)3.5 2.9 3.6 10.2 9.0 6.1 3.1 3.2 1.1 MY0 MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB- Bankfull Area 2161.4 2161.6 2161.9 Bank Height Ratio - Based on AB Bankfull Area --- --- --- Thalweg Elevation 2159.8 2159.8 2160.2 LTOB Elevation 2161.4 2161.4 2161.5 LTOB Max Depth (ft) 1.6 1.6 1.3 LTOB Cross Sectional Area (ft2)6.8 5.8 3.9 Cross Section 7 (Riffle - T1) Cross Section 8 (Pool - T1) Cross Section 9 (Riffle - T2) Cross Section 10 (Pool - T2) Cross Section 1 (Riffle - RHB-1) Cross Section 2 (Pool - RHB-1) Cross Section 3 (Riffle - RHB-2) Round Hill Branch Restoration Site (ID-100066) Cross Section 4 (Pool - RHB-2) Cross Section 5 (Riffle - RHB-3) Cross Section 6 (Pool - RHB-3) Cross-Section Plots Station Elevation 0.0 2170.68 2168.97 0.1 2170.43 8.9 3.0 2170.19 8.8 5.0 2170.26 15.2 6.4 2169.73 2170.53 9.0 2169.13 56.9 10.3 2168.99 1.6 13.3 2168.97 0.6 14.4 2168.96 26.3 15.5 2168.75 3.7 17.3 2168.12 1.0 18.7 2168.09 2167.41 19.2 2167.68 19.6 2167.53 20.1 2167.52 20.2 2167.58 20.7 2167.41 20.8 2167.41 21.3 2167.61 21.9 2167.76 23.4 2168.48 24.9 2168.74 26.6 2168.86 30.0 2168.99 40.1 2168.84 47.1 2168.82 50.3 2169.58 53.9 2169.93 57.1 2170.07 57.0 2170.46 Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: W / D Ratio: SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: LTOB Max Depth LTOB Mean Depth LTOB Cross-Sectional Area: Date:8/1/2023 Field Crew:TS, CK Drainage Area (sq mi):0.46 River Basin:French Broad Site:Round Hill Branch XS ID XS1 2167 2168 2169 2170 2171 0 1020304050 El e v a t i o n ( f e e t ) Station (feet) Round Hill Branch, XS1, Riffle, RHB-1 Bankfull Flood Prone Area MY00 MY01 MY02 Cross-Section Plots Station Elevation 0.0 2170.65 2168.03 0.0 2170.31 15.5 3.3 2170.04 16.1 4.9 2169.94 11.4 5.7 2169.77 --- 9.4 2168.95 --- 11.7 2168.62 2.1 13.8 2168.26 1.4 17.2 2168.31 --- 19.5 2168.09 --- 20.5 2168.09 --- 21.4 2167.53 2165.94 22.5 2167.25 23.2 2166.97 23.5 2166.61 24.6 2166.03 25.9 2165.94 27.0 2166.11 28.2 2166.10 28.7 2166.29 29.4 2166.44 30.4 2166.69 31.2 2167.47 32.4 2168.34 34.1 2168.36 38.4 2168.41 43.5 2168.56 49.0 2168.94 54.0 2169.14 57.0 2169.19 57.0 2169.50 River Basin:French Broad Site:Round Hill Branch XS ID XS2 Drainage Area (sq mi):0.46 Date:8/1/2023 Field Crew:TS, CK SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: LTOB Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: LTOB Max Depth LTOB Mean Depth W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: 2165 2166 2167 2168 2169 2170 2171 0 1020304050 El e v a t i o n ( f e e t ) Station (feet) Round Hill Branch, XS2, Pool, RHB-1 Bankfull MY00 MY01 MY02 Cross-Section Plots Station Elevation 0.0 2166.46 2161.13 0.2 2166.16 6.1 3.6 2165.68 6.8 6.1 2164.93 9.9 9.9 2163.79 2162.48 15.4 2162.32 75.0 17.4 2161.80 1.3 21.8 2161.56 0.7 27.2 2161.44 14.5 32.7 2161.24 7.6 40.8 2161.21 1.0 44.7 2161.34 2159.84 47.0 2161.33 48.0 2161.02 49.2 2160.80 50.3 2160.57 50.9 2160.20 51.5 2159.89 51.8 2159.84 52.5 2159.90 53.1 2160.06 54.0 2160.20 54.7 2160.25 55.4 2160.97 56.9 2160.88 57.7 2161.19 59.7 2161.20 67.6 2161.22 73.2 2161.19 79.3 2161.29 84.2 2161.26 89.4 2162.43 96.4 2163.62 99.5 2164.30 101.9 2164.27 101.9 2164.68 River Basin:French Broad Site:Round Hill Branch XS ID XS3 Drainage Area (sq mi):0.59 Date:8/1/2023 Field Crew:TS, CK SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: LTOB Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: LTOB Max Depth LTOB Mean Depth W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: 2159 2160 2161 2162 2163 2164 2165 2166 2167 0 20406080100 El e v a t i o n ( f e e t ) Station (feet) Round Hill Branch, XS3, Riffle, RHB-2 Bankfull Flood Prone Area MY00 MY01 MY02 Cross-Section Plots Station Elevation Station Elevation 0.0 2164.80 82.1 2164.00 2161.45 3.4 2164.28 84.3 2164.11 29.7 4.9 2164.09 84.2 2164.50 18.0 6.4 2163.25 13.3 8.7 2162.30 --- 12.6 2161.32 --- 13.7 2160.98 3.0 15.6 2160.90 1.4 19.0 2160.66 --- 19.9 2160.76 --- 20.6 2160.60 --- 21.2 2160.36 2157.60 22.1 2160.22 22.4 2159.91 22.8 2159.32 23.4 2157.81 24.4 2157.60 25.5 2157.77 26.6 2158.01 27.8 2158.33 28.3 2158.82 29.6 2159.31 30.6 2159.94 31.6 2160.56 32.6 2160.56 33.2 2160.78 34.6 2160.64 38.2 2160.85 45.3 2160.68 54.8 2160.60 62.2 2160.59 69.7 2160.66 72.7 2161.01 74.0 2161.59 77.1 2162.57 80.0 2163.22 River Basin:French Broad Site:Round Hill Branch XS ID XS4 Drainage Area (sq mi):0.59 Date:8/1/2023 Field Crew:TS, CK SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: LTOB Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: LTOB Max Depth LTOB Mean Depth W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: 2157 2158 2159 2160 2161 2162 2163 2164 2165 2166 0 1020304050607080 El e v a t i o n ( f e e t ) Station (feet) Round Hill Branch, XS4, Pool, RHB-2 Bankfull MY00 MY01 MY02 Cross-Section Plots Station Elevation Station Elevation 0.0 2159.11 50.1 2154.39 2154.43 0.0 2158.77 50.4 2154.15 8.6 0.0 2158.78 51.1 2154.05 8.8 4.7 2158.52 51.6 2154.43 12.5 7.1 2158.52 52.7 2154.44 2155.96 8.1 2158.16 56.6 2154.42 55.6 9.5 2157.78 61.7 2154.31 1.5 13.3 2156.45 62.5 2154.31 0.7 16.4 2155.39 63.1 2154.00 17.8 20.0 2154.78 63.8 2153.78 4.4 26.4 2154.61 64.8 2154.03 1.0 29.6 2154.41 65.9 2154.28 2152.93 31.0 2154.45 67.4 2154.64 32.3 2154.35 68.4 2155.28 33.6 2154.10 71.3 2156.31 34.8 2153.95 74.5 2156.96 35.7 2153.56 76.9 2157.56 36.0 2153.33 76.9 2158.13 36.5 2153.33 37.0 2153.23 37.2 2153.06 37.7 2152.94 37.9 2152.94 38.3 2152.94 38.6 2152.98 39.2 2152.93 39.6 2153.25 40.1 2153.49 40.6 2153.68 41.3 2153.91 41.7 2153.94 43.0 2154.34 44.5 2154.51 46.2 2154.58 47.6 2154.61 49.7 2154.57 River Basin:French Broad Site:Round Hill Branch XS ID XS5 Drainage Area (sq mi):0.74 Date:8/1/2023 Field Crew:TS, CK SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: LTOB Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: LTOB Max Depth LTOB Mean Depth W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: 2152 2153 2154 2155 2156 2157 2158 2159 2160 0 10203040506070 El e v a t i o n ( f e e t ) Station (feet) Round Hill Branch, XS5, Riffle, RHB-3 Bankfull Flood Prone Area MY00 MY01 MY02 Cross-Section Plots Station Elevation Station Elevation 0.0 2158.24 74.9 2157.15 2153.94 0.1 2157.94 74.8 2157.70 26.4 5.2 2157.80 27.5 6.3 2157.69 15.2 8.1 2157.05 --- 10.4 2155.99 --- 12.9 2155.23 3.3 14.8 2154.63 1.8 16.9 2154.25 --- 19.5 2154.17 --- 20.8 2154.16 --- 22.3 2153.67 2150.74 22.9 2153.07 23.6 2152.45 24.8 2151.44 25.6 2151.01 26.7 2150.92 27.9 2150.86 29.4 2150.74 29.9 2151.07 30.5 2151.48 31.2 2151.90 32.0 2152.34 32.5 2152.97 33.3 2153.16 34.7 2153.42 36.1 2153.89 37.3 2154.02 42.0 2154.00 47.4 2154.07 54.4 2153.97 61.5 2153.83 64.3 2154.04 67.3 2155.24 71.2 2156.56 73.3 2157.15 River Basin:French Broad Site:Round Hill Branch XS ID XS6 Drainage Area (sq mi):0.74 Date:8/1/2023 Field Crew:TS, CK SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: LTOB Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: LTOB Max Depth LTOB Mean Depth W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: 2150 2151 2152 2153 2154 2155 2156 2157 2158 2159 0 10203040506070 El e v a t i o n ( f e e t ) Station (feet) Round Hill Branch, XS6, Pool, RHB-3 Bankfull MY00 MY01 MY02 Cross-Section Plots Station Elevation 0.0 2170.54 2167.85 0.2 2170.08 3.5 2.6 2170.14 3.6 5.1 2169.41 7.9 8.2 2168.36 2168.93 10.5 2167.69 51.6 12.7 2167.60 1.1 17.4 2167.58 0.5 20.2 2167.73 17.5 22.8 2167.86 6.5 23.9 2167.85 1.0 24.8 2167.77 2166.77 25.7 2167.43 26.4 2166.88 26.9 2166.80 27.6 2166.77 27.7 2166.94 28.2 2167.05 28.8 2167.34 29.3 2167.53 31.1 2167.76 33.9 2167.91 39.3 2167.90 45.8 2167.95 51.7 2168.01 55.3 2168.29 57.7 2168.81 61.2 2169.73 65.5 2170.78 68.6 2170.90 68.5 2171.32 River Basin:French Broad Site:Round Hill Branch XS ID XS7 Drainage Area (sq mi):0.11 Date:8/1/2023 Field Crew:TS, CK SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: LTOB Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: LTOB Max Depth LTOB Mean Depth W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: 2166 2167 2168 2169 2170 2171 2172 0 102030405060 El e v a t i o n ( f e e t ) Station (feet) Round Hill Branch, XS7, Riffle, T1 Bankfull Flood Prone Area MY00 MY01 MY02 Cross-Section Plots Station Elevation 0.0 2170.24 2167.82 0.0 2169.92 10.2 3.1 2169.96 6.1 5.6 2169.17 9.2 9.3 2167.97 --- 11.4 2167.39 --- 14.3 2167.37 1.3 18.5 2167.30 0.7 23.4 2167.28 --- 26.6 2167.46 --- 29.0 2167.29 --- 30.4 2167.37 2166.09 31.5 2167.25 32.9 2166.56 33.4 2166.40 34.1 2166.47 34.5 2166.48 35.0 2166.38 35.6 2166.14 36.1 2166.23 37.0 2166.09 37.5 2166.14 37.8 2167.16 38.8 2167.18 39.6 2167.57 41.1 2167.56 44.0 2167.71 46.0 2168.05 48.5 2168.90 50.8 2169.57 52.3 2169.96 54.7 2170.13 57.8 2169.97 61.5 2170.40 River Basin:French Broad Site:Round Hill Branch XS ID XS8 Drainage Area (sq mi):0.11 Date:8/1/2023 Field Crew:TS, CK SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: LTOB Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: LTOB Max Depth LTOB Mean Depth W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: 2165 2166 2167 2168 2169 2170 2171 0 102030405060 El e v a t i o n ( f e e t ) Station (feet) Round Hill Branch, XS8, Pool, T1 Bankfull MY00 MY01 MY02 Cross-Section Plots Station Elevation 0.0 2166.59 2162.85 0.0 2166.20 3.1 5.1 2166.10 1.1 9.0 2166.23 6.0 10.4 2165.62 2163.36 13.7 2164.69 35.7 16.6 2163.73 0.5 20.6 2162.67 0.2 24.3 2162.70 32.2 27.4 2162.82 5.9 29.0 2162.81 0.3 30.0 2162.62 2162.01 31.1 2162.63 32.1 2162.70 33.0 2162.43 33.5 2162.29 33.7 2162.12 34.4 2162.12 35.0 2162.01 35.5 2162.14 36.5 2162.52 38.1 2162.52 40.9 2162.53 45.8 2162.68 49.8 2162.90 52.1 2163.01 54.3 2163.48 58.5 2164.85 65.1 2166.96 70.6 2168.80 73.9 2168.87 73.9 2169.33 River Basin:French Broad Site:Round Hill Branch XS ID XS9 Drainage Area (sq mi):0.11 Date:8/1/2023 Field Crew:TS, CK SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: LTOB Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: LTOB Max Depth LTOB Mean Depth W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: 2161 2162 2163 2164 2165 2166 2167 2168 2169 2170 0 10203040506070 El e v a t i o n ( f e e t ) Station (feet) Round Hill Branch, XS9, Riffle, T2 Bankfull Flood Prone Area MY00 MY01 MY02 Cross-Section Plots Station Elevation 0.0 2166.41 2161.92 -0.3 2166.04 6.8 5.7 2165.91 3.9 8.1 2165.86 6.3 10.4 2165.03 --- 13.6 2163.74 --- 17.5 2162.42 1.3 19.9 2161.92 0.6 22.8 2161.87 --- 26.8 2161.57 --- 30.9 2161.52 --- 34.3 2161.46 2160.21 35.3 2161.52 35.5 2161.37 36.5 2161.14 37.0 2161.02 38.3 2160.47 38.7 2160.22 39.1 2160.21 39.5 2160.39 40.2 2160.81 40.5 2161.00 41.2 2161.09 41.9 2161.46 43.3 2161.58 44.5 2161.79 47.1 2161.99 48.8 2162.17 51.1 2162.81 54.2 2163.92 57.5 2165.31 59.7 2165.83 64.3 2167.33 66.7 2167.21 66.9 2167.64 River Basin:French Broad Site:Round Hill Branch XS ID XS10 Drainage Area (sq mi):0.11 Date:8/1/2023 Field Crew:TS, CK SUMMARY DATA Bankfull Elevation (ft) - Based on AB-Bankfull Area Bankfull Cross-Sectional Area: LTOB Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: LTOB Max Depth LTOB Mean Depth W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Thalweg Elevation: 2159 2160 2161 2162 2163 2164 2165 2166 2167 2168 2169 0 102030405060 El e v a t i o n ( f e e t ) Station (feet) Round Hill Branch, XS10, Pool, T2 Bankfull MY00 MY01 MY02 Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 34 MY02 Monitoring Report  APPENDIX D Hydrologic Data   Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 35 MY02 Monitoring Report  MY1 MY2 MY3 MY4 MY5 MY6 MY7 2022 2023 2024 2025 2026 2027 2028 Annual Precip Total 40.27 39.43 WETS 30th Percentile 29.73 29.73 WETS 70th Percentile 53.88 53.88 Normal Yes Yes Table 10. Rainfall Summary, Round Hill Branch Restoration Site (ID-100066) MY1MY2MY3MY4MY5MY6MY7 2022 2023 2024 2025 2026 2027 2028 RHB 10 2 Table 11. Overbank Events, Round Hill Branch Restoration Site (ID-100066) Gage ID   MY1 MY2 MY3 MY4 MY5 MY6 MY7 2022 2023 2024 2025 2026 2027 2028 UT1 (Gauge) No/21* Yes/36 UT1 (Camera) Yes/181 Yes/102 UT2 (Gauge) Yes/209 Yes/136 UT2 (Camera) Yes/83 Yes/115 Table 12. Stream Flow Criteria Attainment, Round Hill Branch Restoration Site (ID-100066) Greater than 30 Days of Flow/Max Consecutive Days Reach *Gauge malfunction   0.0 1.0 2.0 3.0 2151 2152 2153 2154 2155 1- J a n - 2 3 10 - J a n - 2 3 19 - J a n - 2 3 28 - J a n - 2 3 6- F e b - 2 3 15 - F e b - 2 3 24 - F e b - 2 3 5- M a r - 2 3 14 - M a r - 2 3 23 - M a r - 2 3 1- A p r - 2 3 10 - A p r - 2 3 19 - A p r - 2 3 28 - A p r - 2 3 7- M a y - 2 3 16 - M a y - 2 3 25 - M a y - 2 3 3- J u n - 2 3 12 - J u n - 2 3 21 - J u n - 2 3 30 - J u n - 2 3 9- J u l - 2 3 18 - J u l - 2 3 27 - J u l - 2 3 5- A u g - 2 3 14 - A u g - 2 3 23 - A u g - 2 3 1- S e p - 2 3 10 - S e p - 2 3 19 - S e p - 2 3 28 - S e p - 2 3 7- O c t - 2 3 16 - O c t - 2 3 25 - O c t - 2 3 3- N o v - 2 3 12 - N o v - 2 3 21 - N o v - 2 3 30 - N o v - 2 3 9- D e c - 2 3 18 - D e c - 2 3 27 - D e c - 2 3 Ra i n f a l l ( i n ) St r e a m S t a g e E l e v a t i o n ( f t ) Date Round Hill Branch Creek Restoration Site Hydrograph Stream Gauge RHB Rainfall Sensor Depth Stream Bed Elevation Stream Stage Elevation Bankfull Elevation 0.0 1.0 2.0 3.0 2168 2169 2170 2171 2172 2173 1- J a n - 2 3 10 - J a n - 2 3 19 - J a n - 2 3 28 - J a n - 2 3 6- F e b - 2 3 15 - F e b - 2 3 24 - F e b - 2 3 5- M a r - 2 3 14 - M a r - 2 3 23 - M a r - 2 3 1- A p r - 2 3 10 - A p r - 2 3 19 - A p r - 2 3 28 - A p r - 2 3 7- M a y - 2 3 16 - M a y - 2 3 25 - M a y - 2 3 3- J u n - 2 3 12 - J u n - 2 3 21 - J u n - 2 3 30 - J u n - 2 3 9- J u l - 2 3 18 - J u l - 2 3 27 - J u l - 2 3 5- A u g - 2 3 14 - A u g - 2 3 23 - A u g - 2 3 1- S e p - 2 3 10 - S e p - 2 3 19 - S e p - 2 3 28 - S e p - 2 3 7- O c t - 2 3 16 - O c t - 2 3 25 - O c t - 2 3 3- N o v - 2 3 12 - N o v - 2 3 21 - N o v - 2 3 30 - N o v - 2 3 9- D e c - 2 3 18 - D e c - 2 3 27 - D e c - 2 3 Ra i n f a l l ( i n ) St r e a m S t a g e E l e v a t i o n ( f t ) Date Round Hill Branch Creek Restoration Site Hydrograph Stream Gauge T1 Rainfall Stream Bed Elevation Stream Stage Elevation Flow Elevation Stream Flow (Camera)Sensor Depth Camera obscured 33 days36 days Gauge malfunction 102 days 0.0 1.0 2.0 3.0 2161 2162 2163 2164 1- J a n - 2 3 10 - J a n - 2 3 19 - J a n - 2 3 28 - J a n - 2 3 6- F e b - 2 3 15 - F e b - 2 3 24 - F e b - 2 3 5- M a r - 2 3 14 - M a r - 2 3 23 - M a r - 2 3 1- A p r - 2 3 10 - A p r - 2 3 19 - A p r - 2 3 28 - A p r - 2 3 7- M a y - 2 3 16 - M a y - 2 3 25 - M a y - 2 3 3- J u n - 2 3 12 - J u n - 2 3 21 - J u n - 2 3 30 - J u n - 2 3 9- J u l - 2 3 18 - J u l - 2 3 27 - J u l - 2 3 5- A u g - 2 3 14 - A u g - 2 3 23 - A u g - 2 3 1- S e p - 2 3 10 - S e p - 2 3 19 - S e p - 2 3 28 - S e p - 2 3 7- O c t - 2 3 16 - O c t - 2 3 25 - O c t - 2 3 3- N o v - 2 3 12 - N o v - 2 3 21 - N o v - 2 3 30 - N o v - 2 3 9- D e c - 2 3 18 - D e c - 2 3 27 - D e c - 2 3 Ra i n f a l l St r e a m S t a g e E l e v a t i o n ( f t ) Date Round Hill Branch Creek Restoration Site Hydrograph T2 Stream Flow Gauge Rainfall Stream Stage Elevation Stream Bed Elevation Sensor Depth Flow Elevation Stream Flow (Camera) 136 Days Camera obscured Gauge malfunction 115 days Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 39 MY02 Monitoring Report  APPENDIX E Project Timeline and Contact Info                                                                     Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 40 MY02 Monitoring Report  Activity or Report Data Collection Complete Actual Completion or Delivery Site Instituted April 25, 2018 Mitigation Plan Nov. 13, 2020 Final Design - Construction Plans Feb. 12, 2021 Construction Grading Completed June 18, 2021 As-built Survey August 11, 2021 Repairs from Storm Damage Completed Sept. 26, 2021 Planting Completed Dec. 20, 2021 Baseline Monitoring/Report February 2022 Vegetation Monitoring January 18, 2022 Stream Survey January 19, 2022 Year 1 Monitoring January 2023 Vegetation Monitoring October 10, 2022 Stream Survey December 20, 2022 Year 2 Monitoring January 2024 Vegetation Monitoring August 1, 2023 Stream Survey August 1, 2023 Table 13. Project Activity & Reporting History Round Hill Branch Restoration Site, DMS Project #100066   Round Hill Branch Restoration Site KCI Associates of NC, PA DMS Project #100066 41 MY02 Monitoring Report  Table 14. Project Contacts Round Hill Branch Restoration Site, DMS Project #100066 Design Firm KCI Associates of North Carolina, PA 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 Contact: Mr. Adam Spiller Phone: (919) 278-2512 Fax: (919) 783-9266 Construction Contractor KCI Environmental Technologies and Construction 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 Contact: Mr. Adam Spiller Planting Contractor Shenandoah Habitats 1983 Jefferson Highway Waynesboro, VA 22980 Contact: Mr. David Coleman Phone: (540) 941-0067 Monitoring Performers KCI Associates of North Carolina, PA 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 Contact: Mr. Adam Spiller