Loading...
HomeMy WebLinkAbout20140193 Ver 1_Response_PermittingComments_20151028   Wildlands Engineering, Inc.    (P) 828.774.5547  •  167‐B Haywood Rd.  •  Asheville, NC 28806  October 28, 2015  Andrea Hughes  Mitigation Project Manager  Regulatory Division, Wilmington District  US Army Corps of Engineers  11405 Falls of Neuse Road  Wake Forest, North Carolina 27587  RE:  SAW‐2014‐00538 – INCOMPLETE APPLICATION comments  Henry Fork Mitigation Site (DMS #96306)  Catawba 03050103 Expanded Service Area, Catawba County, NC  Dear Ms. Hughes,  We have reviewed the comments on the Pre‐Construction Notification (PCN) for the above referenced  project emailed on October 19, 2015 by USACE, and on October 22, 2015 by DWR, and have revised the  Mitigation Plan based on these comments.  Copies of these comment emails are provided as  attachments to this letter.  The pages of the plan that have been revised are numbered in the lower  right corner of the page as 23, 35, 58, 59, and 62.  The revised Mitigation Plan is being provided as a  complete document, in digital format.  Hard copies of the revised pages are being mailed to IRT  members so that they can replace these pages in their binders. Below are responses to each of the  USACE review letter comments. We believe that these comments also address DWR’s informal  comments which also request that a hydroperiod of 8.5% be adopted for the project performance  standard.  The USACE comments are reprinted with our response in italics.  1.Natural gas pipeline replacement Recent information indicates the potential for impacts to the Henry Fork mitigation site associated  with replacement of a natural gas pipeline.  We are unable to process your application until this  issue has been resolved.    Response: The gas company has indicated that based on our concerns, they have recently altered  their proposed plans to avoid the project area and its conservation easement in its entirety.  Please  reference the attached email from the gas company.  2a. Wetland hydrology performance standards  Wetland areas receiving mitigation credit for hydrologic restoration/enhancement should  demonstrate saturation within 12 inches of the soil surface for at least 8.5% of the growing season  for Catawba County.  Response: We have revised performance standard criteria as required above.  This is discussed in  revisions to section 5.3.1.4, and section 12.3.  As discussed with Ms. Hughes, we have included  language that the performance criteria shall be applied such that it is a general trend exhibited in  most wells in most years.  As long as this trend is met, hydrologic restoration shall be accepted.       2    2b. Invasive species management  Please provide details on contingency actions to address invasive species issues.  Response:  Wildlands has already begun treating invasive species at the project site and will continue  to do so, as needed to ensure the hydrologic and ecologic success of the project, during the  monitoring period. Section 12.2 states that “It is anticipated that Chinese privet from the adjacent  areas to the west could migrate onto the site; this will be closely monitored.  Invasive species  treatment will be conducted in the mitigation area during the 7‐year monitoring period as needed to  ensure the hydrologic and ecologic success of the project.” Footnote 5, in Table 22, in Section 13.1,  has been revised to specifically state that Chinese privet and other invasives will be identified within  the easement area, mapped and treated as needed with cut and treat, or other suitable methods.    Section 13.4 states that invasive species will be visually assessed, mapped, and treated where  present, and identified Chinese privet as a specific species of concern.  The adaptive management  plan (Section 15.0) indicates that monitoring and maintenance will be performed as specified (in  Sections 12.2, 13.1 and 13.4).     2c. Sream gaging on intermittent streams  Please note that a sufficient flow regime is typically a minimum 30 consecutive days of flow.  Response: This has been added as part of the criteria for intermittent stream hydrology, and is stated  as follows in section 12.1.5: “The flow regime should indicate sufficient flow to maintain an Ordinary  High Water Mark (OHWM), specifically a minimum of 30 consecutive days of flow during periods of  normal rainfall.”    3. General Comment Contingency plans for additional wetland credits  Regarding Section 8.2, please note that no additional credits may be requested for mitigation sites  after mitigation plan approval. Regarding recent discussions between NCDMS and the Corps,  areas that have the potential to generate mitigation credits should be identified during mitigation  plan development and included in the mitigation plan with established monitoring protocols and  performance standards.  Response:  Upon further discussion of this matter with this Corps, additional credits may be accepted  under the condition that they are identified early in the monitoring period and gaged to demonstrate  that performance standards are met over the remainder of the monitoring period.  The last  paragraph of Section 8.2 has been revised to clarify that any additional potential wetland credit  generating areas shall be identified and gaged in this manner.     Please let me know if you have any additional comments.  Sincerely,    Jacob P. McLean, PE, CFM             3  CC:  Tim Baumgartner, tim.baumgartner@ncdenr.gov  Matthew Reid, matthew.reid@ncdenr.gov  Todd Tugwell, Todd.Tugwell@usace.army.mil  Lin Xu, Lin.Xu@ncdenr.gov  Paul Wiesner, paul.wiesner@ncdenr.gov   Alan Johnson, alan.johnson@ncdenr.gov    Ginny Baker, virginia.baker@ncdenr.gov  Steve Kichefski, Steven.L.Kichefski@usace.army.mil   1 Ja k e M c L e a n Fr o m : Ja k e M c L e a n Se n t : We d n e s d a y , O c t o b e r 2 8 , 2 0 1 5 1 1 : 2 4 A M To : Ja k e M c L e a n Su b j e c t : FW : P i e d m o n t N a t u r a l G a s R e p l a c e m e n t L i n e Fr o m :  Ry a n  Ho u c k  <Ry a n . H o u c k @ p i e d m o n t n g . c o m >  Da t e :  Oc t o b e r  28 ,  20 1 5  at  7: 4 5 : 4 8  AM  ED T   To :  Sh a w n  Wi l k e r s o n  <sw i l k e r s o n @ w i l d l a n d s e n g . c o m >  Su b j e c t :  Pi e d m o n t  Na t u r a l  Ga s  Re p l a c e m e n t  Li n e   Go o d  mo r n i n g  Sh a w n ,   I am  wr i t i n g  to  co n f i r m  th a t  Pi e d m o n t  ha s  de s i g n e d  a ne w  ro u t e  an d  ac q u i r e d  th e  ne c e s s a r y  ea s e m e n t s  to  la y  th e  re p l a c e m e n t  pipeline without  im p a c t i n g  yo u r  co n s e r v a t i o n  ea s e m e n t  ne a r  th e  He n r y  Fo r k  Ri v e r .  Th e  ne w  al i g n m e n t  st a y s  co m p l e t e l y  of f  th e  pr o p e r t y  owned by WEI‐HENRY  FO R K ,  LL C .   Pl e a s e  di s r e g a r d  an y  of  ou r  ea r l i e r  pr o p o s a l s  to  ac q u i r e  an  ea s e m e n t  (e i t h e r  pe r m a n e n t  or  te m p o r a r y )  on  th i s  pr o p e r t y .   Wh i l e  we  fa i r l y  co n f i d e n t  in  th e  ne w  ro u t e ,  I fe e l  I mu s t  ad d  so m e  di s c l a i m e r ,  th a t  th e  ro u t e  is  su b j e c t  to  ch a n g e .  In  th e  un l i k e l y  event that  so m e t h i n g  ar i s e s  to  ma k e  us  re c o n s i d e r  ou r  ro u t e ,  we  wi l l  app r o a c h  yo u  on c e  ag a i n  wi t h  a ne w  pr o p o s a l .   J.  Ry a n  Ho u c k   Se n i o r  La n d  Ag e n t   47 2 0  Pi e d m o n t  Ro w  Dr i v e  | Ch a r l o t t e ,  NC  28 2 1 0    Of f i c e :  70 4 . 7 3 1 . 4 4 6 8  | Ce l l :  70 4 . 7 6 3 . 0 0 6 8   Fa x :  70 4 . 7 3 1 . 4 0 9 2  | ry a n . h o u c k @ p i e d m o n t n g . c o m   1 Ja k e M c L e a n Fr o m : Hu g h e s , A n d r e a W S A W < A n d r e a. W . H u g h e s @ u s a c e . a r m y . m i l > Se n t : Mo n d a y , O c t o b e r 1 9 , 2 0 1 5 5 : 3 5 P M To : Ba u m g a r t n e r , T i m Cc : Wi e s n e r , P a u l ; R e i d , M a t t h e w ; T u g w e l l , T o dd S A W ; L i n . X u @ n c d e n r . g o v ; J a k e M c L e a n Su b j e c t : SA W - 2 0 1 4 - 0 0 5 3 8 - I N C O M P L E T E A P P L I C A T I O N - H e n r y F o r k M i t i g a t i o n S i t e - C a t a wb a C o u n t y ( U N C L A S S I F I E D ) Cl a s s i f i c a t i o n :  UN C L A S S I F I E D   Ca v e a t s :  NO N E   On  Se p t e m b e r  22 ,  20 1 5 ,  we  re c e i v e d  th e  Pr e ‐Co n s t r u c t i o n  No t i f i c a t i o n  (P C N )  fo r  a Na t i o n w i d e  Pe r m i t  #2 7  in v o l v i n g  fo u r  (4 )  st r e a m  reaches and ten (10) wetland  ar e a s  on  th e  He n r y  Fo r k  Mi t i g a t i o n  Si t e .    Th e  st r e a m  re a c h e s  ar e  id e n t i f i e d  as  UT 1 ,  UT 1 A ,  UT 1 B ,  an d  UT  2 an d  th e  we t l a n d  ar e a s  are identified as Wetlands  A, B , C , D , F , G , J , O , R ,  an d  S.  Th e  pr o p o s e d  si t e  is  lo c a t e d  no r t h  of  th e  in t e r s e c t i o n  of  Ha r r i s  Fa r m  Ro a d  an d  Mo u n t a i n  Vi e w  Ro a d ,  so u t h w e s t  of Hickory, Catawba  Co u n t y ,  No r t h  Ca r o l i n a .  (3 5 . 7 0 2 . 8 9 3 ,  ‐ 81 . 3 6 4 4 3 6 )  Th e  PC N  re q u e s t s  DA  pe r m i t  au t h o r i z a t i o n  fo r  im p a c t s  to  5, 5 4 4  li n e a r  fe e t  of  st r e a m  channel and 0.380 acre of  we t l a n d s  as s oc i a t e d  wi t h  st r e a m  an d  we t l a n d  re s t o r a t i o n  an d  en h a n c e m e n t  ac t i v i t i e s .    Th e  ap p l i c a t i o n  is  in c o m p l e t e  an d  ca n n o t  be  pr o c e s s e d  un t i l  th e  fo l l o w i n g  in f o r m a t i o n  is  re c e i v e d :   1. Re c e n t  in f o r m a t i o n  in d i c a t e s  th e  po t e n t i a l  fo r  im p a c t s  to  th e  He n r y  Fo r k  mi t i g a t i o n  si t e  as s o c i a t e d  wi t h  re p l a c e m e n t  of  a na t u r a l  gas pipeline.  We are unable to  pr o c e s s  yo u r  ap p l i c a t i o n  un t i l  th i s  is s u e  ha s  be e n  re s o l v e d .    2. Th e  He n r y  Fo r k  Dr a f t  Mi t i g a t i o n  Pl a n  wa s  ap p r o v e d  co n t i n g e n t  up o n  th e  pr o v i d e r  re v i s i n g  th e  fi n a l  mi t i g a t i o n  pl a n  to  ad d r e s s  IR T  concerns. See below for IRT co n c e r n s  th a t  ha v e  no t  be e n  su f f i c i e n t l y  ad d r e s s e d  in  th e  re v i s e d  mi t i g a t i o n  pl a n .   a. We t l a n d  Hy d r o l o g y  Pe r f o r m a n c e  St a nd a r d s :    We t l a n d  ar e a s  re c e i v i n g  mi t i g a t i o n  cr e d i t  fo r  hy d r o l o g i c  re s t o r a t i o n / e n h a n c e m e n t  should demonstrate sa t u r a t i o n  wi t h i n  12  in c h e s  of  th e  so i l  su r f a c e  fo r  at  le a s t  8. 5 %  of  th e  gr o w i n g  se a s o n  fo r  Ca t a w b a  Co u n t y .    b. In v a s i v e  Sp e c i e s  Ma n a g e m e n t :    Pl e a s e  pr o v i d e  de t a i l s  on  co n t i n g e n c y  ac t i o n s  to  ad d r e s s  in v a s i v e  sp e c i e s  is s u e s . c. St r e a m Ga g i n g  on  In t e r m i t t e n t  St r e a m s :  Pl e a s e  no t e  th a t  a su f f i c i e n t  fl o w  re g i m e  is  ty p i c a l l y  a mi n i m u m  30  co n s e c u t i v e  days of flow. Re g a r d i n g  Se c t i o n  8. 2 ,  co n t i n g e n c y  pl a n s  fo r  ad d i t i o n a l  we t l a n d  cr e d i t s ,  pl e a s e  no t e  th a t  no  ad d i t i o n a l  cr e d i t s  ma y  be  re q u e s t e d  for mitigation sites after  mi t i g a t i o n  pl a n  ap p r o v a l .  Re g a r d i n g  re c e n t  di s c u s s i o n s  be t w e e n  NC D M S  an d  th e  Co r p s ,  ar e a s  th a t  ha v e  th e  po t e n t i a l  to  ge n e r a t e  mitigation credits should be  id e n t i f i e d  du r i n g  mi t i g a t i o n  pl a n  de v e l o p m e n t  an d  in c l u d e d  in  th e  mi t i g a t i o n  pl a n  wi t h  es t a b l i s h e d  mo n i t o r i n g  pr o t o c o l s  an d  pe r f o r m a n c e  standards.    If  yo u  ar e  un a b l e  to  su b m i t  th e  ab o v e  in f o r m a t i o n  wi t h i n  30  da y s  of  re c e i p t  of  th i s  No t i f i c a t i o n ,  we  wi l l  co ns i d e r  yo u r  ap p l i c a t i o n  withdrawn. Please call or email  me  if  yo u  ha v e  an y  qu e s t i o n s .          2 An d r e a  Hug h e s   Mi t i g a t i o n  Pr o j e c t  Ma n a g e r   Re g u l a t o r y  Di v i s i o n ,  Wi l m i n g t o n  Di s t r i c t   11 4 0 5  Fa l l s  of  Ne u s e  Ro a d   Wa k e  Fo r e s t ,  No r t h  Ca r o l i n a    27 5 8 7   (9 1 9 )  84 6 ‐25 6 4   Cl a s s i f i c a t i o n :  UN C L A S S I F I E D   Ca v e a t s :  NO N E   DWR comments on the Henry Fork Wetland Hydrology Performance Criterion The Wildlands letter (September 2, 2015) responding to the IRT concerns regarding the wetland hydrology performance criterion focused on two primary factors for their desire to keep the standard at a 7.2% hydroperiod: 1.“Assessment of the hydrology data was focused on the response of the water table elevations to precipitation (DrainMod model) as opposed to setting minimum hydrology criteria based on the reference hydrology”. 2.Wetland hydrologic criterion utilized on past projects. a.Four sites show a Bottomland Hardwood forest with hydrologic criteria ranging from 6.5% to 8.5%, based on the information below these sites should probably be at least 10-12% b.One site is a Coastal Plain Stream/Swamp and Bottomland Hardwood, without knowing the soils on site, the fact that the wetland type is identified as a Swamp would likely push this hydrologic success criterion higher (12%) in the future. c.One site is an Emergent Wetland-typically emergent wetlands have significantly greater hydroperiods than 7.5% After reviewing the Wildlands response, DWR believes the wetland hydrologic performance criterion should be at least 8.5% as previously recommended based on the following information: 1.In 2012, the Ecosystem Enhancement Program (EEP, now Division of Mitigation Services) formed the Science Advisory Panel to assist the Program with a number of issues. One of the issues identified was wetland hydrology assessment. The expert panel, to name just a few, consisted of Michael Vepraskas, Wayne Skaggs (developed DrainMod), and Steve Broome of North Carolina State University. In short, their recommendation to EEP was a wetland hydrology performance criterion of 12.5%. 2.While utilizing DrainMod as tool to predict wetland hydrology is useful, it should not be relied on solely to come up with the wetland hydrology standard. DWR believes this tool should be used in conjunction with the reference hydrology and soil data. Wildland states in their response letter that the reference data showed a 23% hydroperiod. 3.The soils data (and landscape position) also support a wetland hydrologic criterion of greater than 7.2%. First of all, good information can be gleaned from the taxonomy of the mapped soils. The reference soil is mapped as Chewacla and its taxonomic subgroup is identified as a Fluvaquentic Dystrudept, or a young developing soil located in a riparian landscape position with a udic moisture regime (not hydric). The restoration site is mapped (and confirmed by the mitigation plan) as Hatboro, and its taxonomic subgroup is identified as a Fluvaquentic Endoaquept, or a young developing soil in a riparian landscape position with an aquic (hydric) moisture regime. DWR believes that two important points can be surmised from this information; one, that the mapped soil on the restoration site has a wetter regime than the reference and two, the fact that both soils reflect a fluvial landscape position supports the contention that both groundwater and surface flow should be considered when determining a wetland hydrologic performance criterion.